Commercial Tenant Improvement / Tenant Finish Permit in Coalville, Utah

Required for interior remodel and tenant-finish work in existing commercial structures in Coalville, regulated by the statewide-adopted 2024 IBC. Coalville's Fee Schedule (Resolution 2025-1) does not publish a dedicated 'Tenant Improvement' line item or a TI-specific submittal checklist; the only applicable valuation provision is item 1(c), 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above,' applied to the commercial (IBC) per-square-foot rate and then run through the same Building Permit Fee table used for new construction, with Plan Review billed at the standard 65% commercial rate.

Reviewed 2026-07-19 · Source

When you need this permit

  • Interior remodel or tenant-finish work in an existing commercial structure, regulated by the statewide-adopted 2024 IBC
  • Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance, per Coalville's general permit sign-off requirement (no TI-specific exemption from this requirement is published)
  • Coalville's only published plan-submittal checklist (Building Permit Application Review Procedures) is written for new residential/commercial construction generally and is not scoped down for interior-only tenant-finish work; applicants should confirm with the Building Official (435-640-1799) which elements (e.g., full site plan) can be waived for interior-only scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Valuation (Remodel/Tenant Finish, Resolution 2025-1)Coalville City Fee Schedule (Resolution 2025-1), 'BUILDING PERMIT FEES' section, item 1(c): 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above.' The Fee Schedule does not separately label this provision as applying to 'Tenant Improvement' work by name, and does not distinguish residential-remodel from commercial-remodel/TI within item 1(c) — it is the only published valuation basis for interior commercial remodel/tenant-finish work found in the schedule.
50% of the applicable per-square-foot commercial (IBC) valuation rate
Building Permit Fee (valuation-based, Resolution 2025-1)Coalville City Fee Schedule, item 2 table — the resulting 50%-of-rate remodel valuation (item 1(c)) is run through this same table; no separate reduced-fee table exists for remodels/TI.
Same valuation-based table as new construction (see commercial-building-permit entry): e.g. $1,181 for the first $100,000 of valuation plus $6.50 per additional $1,000, to $500,000.
Plan Review Fee (commercial remodel/TI)Coalville City Fee Schedule, item 3(b): 'Commercial Structures: 65% of building permit fee.' No reduced plan-review rate applies to general commercial remodels/tenant improvements — the 15% reduced rate under item 3(d) is limited to detached garages with no living space, decks/porches for existing structures, and accessory buildings.
65% of the Building Permit Fee

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Coalville?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In (Electrical/Plumbing/Mechanical)

    Rough-in inspection of any electrical, plumbing, or mechanical work altered as part of the tenant finish, prior to closing walls/ceilings. Minimum 24-hour notice required; schedule at (435) 336-5981.

  2. 2

    Final Building Inspection

    Final inspection by the Building Official, coordinated with Public Works and North Summit Fire District sign-offs, required prior to occupancy of the improved tenant space.

See the full Coalville inspection guide — scheduling & re-inspection fees →

Tips

  • Coalville's Fee Schedule has no line item named 'Tenant Improvement' or 'Tenant Finish' — this entry applies the general 'Remodels and Basement finishes' valuation provision (item 1(c): 50% of the applicable sq. ft. rate) as the closest documented basis for pricing a commercial TI project; confirm the exact valuation approach with the Building Official (435-640-1799) before budgeting.
  • Plan review for commercial TI/remodel work is billed at the full 65% rate (item 3(b)), the same as new commercial construction — Coalville does not offer a reduced remodel/TI plan-review rate (its only reduced 15% rate is for detached garages, decks/porches on existing structures, and accessory buildings, per item 3(d)).
  • No dedicated tenant-improvement submittal checklist is published; Coalville's only official plan-submittal document (Building Permit Application Review Procedures) is written generally for new residential/commercial construction, so applicants doing interior-only work should confirm with the Building Official which submittal elements (e.g., full exterior site plan) can be reduced or waived for their scope.
  • Coalville has no standalone Change of Use, Change of Occupancy, or existing-building Certificate of Occupancy re-issuance permit or fee distinct from this Tenant Improvement / Building Permit process. Per the city's official Building Permits & Construction Standards page (coalvillecity.gov/building-department/page/building-permits-construction-standards), 'Coalville City requires a Building Permit for the construction, enlargement, alteration, repair, movement, improvement, removal, conversion or demolition of any building or structure' -- an occupancy/use conversion falls under this same general Building Permit requirement, and the Fee Schedule (Resolution No. 2025-1, effective 5/27/2025) and Building Permit Application Review Procedures document contain no separate change-of-use or CO-reissuance fee line item.

Frequently asked questions

Coalville requires a commercial tenant improvement / tenant finish permit for: Interior remodel or tenant-finish work in an existing commercial structure, regulated by the statewide-adopted 2024 IBC; Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance, per Coalville's general permit sign-off requirement (no TI-specific exemption from this requirement is published); Coalville's only published plan-submittal checklist (Building Permit Application Review Procedures) is written for new residential/commercial construction generally and is not scoped down for interior-only tenant-finish work; applicants should confirm with the Building Official (435-640-1799) which elements (e.g., full site plan) can be waived for interior-only scope. If your project isn't listed, confirm with Coalville City Building Department at (435) 336-5981 before starting work.

Coalville's Fee Schedule (Resolution 2025-1) has no dedicated Tenant Improvement fee line. The closest published basis is item 1(c), which values remodels at 50% of the applicable commercial (IBC) per-square-foot rate; that valuation is then run through the same Building Permit Fee table used for new construction, plus a 65% plan review fee and a 1% Utah state surcharge. Confirm the exact calculation with the Building Official (435-640-1799).

Coalville does not publish a plan-review timeline for this permit. Contact Coalville City Building Department at (435) 336-5981 for current turnaround.

You'll need: Coalville City Building Permit Application. Depending on your project, Coalville may also ask for: Building Permit Application Review Procedures. See the required-documents checklist on this page for details on each.

Coalville requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Rough-In (Electrical/Plumbing/Mechanical), Final Building Inspection. Schedule each through Coalville City Building Department ((435) 336-5981).

Apply through Coalville City Building Department at 10 North Main Street, P.O. Box 188, Coalville, UT 84017. Phone: (435) 336-5981, email: cityhall@coalvillecity.org. Office hours: Monday - Thursday 8:00 AM - 5:00 PM. Official information: https://www.coalvillecity.gov/building-department.

Coalville, Utah has adopted: 2024 International Building Code (IBC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(a) (Utah Uniform Building Standard Act), effective 2026-07-01, superseded the 2021 edition (which was itself effective July 1, 2023). Coalville's Building Permit Fees resolution (Res. 2025-1) references the IBC directly for commercial structures and does not codify a separate local building-code chapter, consistent with the statewide adoption model.; 2021 International Residential Code (IRC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(b); unaffected by the 7/1/2026 statute revision, continues in force. Coalville's Fee Schedule (Res. 2025-1, Building Permit Fees section) references the IRC directly for residential structures.; 2024 International Plumbing Code (IPC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(d), effective 2026-07-01, superseded the 2021 edition. Coalville's Fee Schedule references the IPC for commercial plumbing permit fee calculation.; 2024 International Mechanical Code (IMC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(e), effective 2026-07-01, superseded the 2021 edition. Coalville's Fee Schedule references the IMC for commercial mechanical permit fee calculation.; 2023 National Electrical Code (NEC) — current statewide-adopted edition per Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force. Coalville's Fee Schedule references the NEC for commercial electrical permit fee calculation.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide-adopted edition per Utah Code § 15A-2-103(1)(h), effective 2026-07-01, superseded the 2021 edition.; NOTE: Effective July 1, 2026 (now in force), the 2024 editions of IBC, IPC, IMC, and IECC replaced the 2021 editions statewide per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16). The 2021 IRC and 2023 NEC were unaffected and remain in force. This file's codesAdopted list does not carry separate line items for the International Fuel Gas Code, International Existing Building Code, or International Swimming Pool and Spa Code (residential provisions) — all three are also statewide-adopted per Utah Code § 15A-2-103(1)(f)/(i)/(n) at the 2024 edition effective 2026-07-01, but no Coalville-specific citation for them was located this session; this is a pre-existing completeness gap in this file, not addressed further here.. Local amendments apply — see the Coalville overview page for the full list.

No. Coalville uses the same Building Permit Application and the same Building Permit Application Review Procedures checklist for tenant-improvement work as for new construction generally; no TI-specific form or reduced checklist is published.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Coalville.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.