Commercial Tenant Improvement / Tenant Finish Permit — Coalville, Utah · Requirements sheet
Reviewed 2026-07-19 · Source: https://www.coalvillecity.gov/media/11
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Tenant Improvement / Tenant Finish Permit in Coalville, Utah
Required for interior remodel and tenant-finish work in existing commercial structures in Coalville, regulated by the statewide-adopted 2024 IBC. Coalville's Fee Schedule (Resolution 2025-1) does not publish a dedicated 'Tenant Improvement' line item or a TI-specific submittal checklist; the only applicable valuation provision is item 1(c), 'Remodels and Basement finishes: Valuation based on 50% of sq. ft. values from above,' applied to the commercial (IBC) per-square-foot rate and then run through the same Building Permit Fee table used for new construction, with Plan Review billed at the standard 65% commercial rate.
Reviewed 2026-07-19 · Source
When you need this permit
- Interior remodel or tenant-finish work in an existing commercial structure, regulated by the statewide-adopted 2024 IBC
- Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance, per Coalville's general permit sign-off requirement (no TI-specific exemption from this requirement is published)
- Coalville's only published plan-submittal checklist (Building Permit Application Review Procedures) is written for new residential/commercial construction generally and is not scoped down for interior-only tenant-finish work; applicants should confirm with the Building Official (435-640-1799) which elements (e.g., full site plan) can be waived for interior-only scope
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Electrical/Plumbing/Mechanical)
Rough-in inspection of any electrical, plumbing, or mechanical work altered as part of the tenant finish, prior to closing walls/ceilings. Minimum 24-hour notice required; schedule at (435) 336-5981.
- 2
Final Building Inspection
Final inspection by the Building Official, coordinated with Public Works and North Summit Fire District sign-offs, required prior to occupancy of the improved tenant space.
See the full Coalville inspection guide — scheduling & re-inspection fees →
Tips
- Coalville's Fee Schedule has no line item named 'Tenant Improvement' or 'Tenant Finish' — this entry applies the general 'Remodels and Basement finishes' valuation provision (item 1(c): 50% of the applicable sq. ft. rate) as the closest documented basis for pricing a commercial TI project; confirm the exact valuation approach with the Building Official (435-640-1799) before budgeting.
- Plan review for commercial TI/remodel work is billed at the full 65% rate (item 3(b)), the same as new commercial construction — Coalville does not offer a reduced remodel/TI plan-review rate (its only reduced 15% rate is for detached garages, decks/porches on existing structures, and accessory buildings, per item 3(d)).
- No dedicated tenant-improvement submittal checklist is published; Coalville's only official plan-submittal document (Building Permit Application Review Procedures) is written generally for new residential/commercial construction, so applicants doing interior-only work should confirm with the Building Official which submittal elements (e.g., full exterior site plan) can be reduced or waived for their scope.
- Coalville has no standalone Change of Use, Change of Occupancy, or existing-building Certificate of Occupancy re-issuance permit or fee distinct from this Tenant Improvement / Building Permit process. Per the city's official Building Permits & Construction Standards page (coalvillecity.gov/building-department/page/building-permits-construction-standards), 'Coalville City requires a Building Permit for the construction, enlargement, alteration, repair, movement, improvement, removal, conversion or demolition of any building or structure' -- an occupancy/use conversion falls under this same general Building Permit requirement, and the Fee Schedule (Resolution No. 2025-1, effective 5/27/2025) and Building Permit Application Review Procedures document contain no separate change-of-use or CO-reissuance fee line item.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Coalville.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Coalville
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Coalville project checklist
Describe your project once and get every permit, document, and fee it triggers in Coalville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →