EV Charger / EVSE Permit in Coalville, Utah
Coalville City does not publish a distinct "EV Charger" or "EVSE" fee line item. Its Fee Schedule (Resolution 2025-1) prices electrical permits by structure type and square footage rather than by equipment: a flat $10 Permit Issuance Fee plus a System Fee of $0.035 per square foot for residential structures (per the IRC), or the same rate for commercial structures (per the National Electric Code). A full-text search of the current fee schedule found no mention of "EV," "EVSE," "electric vehicle," or "charging station." Because the published System Fee is scaled to overall structure square footage rather than scope of electrical work, it is not confirmed how a single added EV-charger circuit would be billed relative to a full-structure electrical permit; the $10 flat Permit Issuance Fee is the only clearly applicable minimum figure.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property within Coalville City
- Dedicated 240V circuit and/or panel capacity installed by a licensed electrician Contractor
- Electrical permit filed with Coalville City for the added circuit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
Inspection of the new circuit/equipment by Coalville City as part of the standard electrical permit process.
See the full Coalville inspection guide — scheduling & re-inspection fees →
Tips
- Coalville's electrical fee is scaled to structure square footage rather than scope of work and does not name EV chargers — confirm with the Coalville City Building Department (435-336-5981) how a single added charger circuit will be billed before applying.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Coalville
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Coalville project checklist
Describe your project once and get every permit, document, and fee it triggers in Coalville — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →