Residential Building Permit — Coalville, Utah · Requirements sheet
Verified 2026-07-08 · Source: https://www.coalvillecity.gov/media/11
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Coalville, Utah
Required for new single-family and two-family residential construction and any work regulated by the statewide-adopted 2021 IRC. Coalville's Building Permit Fees (Resolution 2025-1) use a valuation-based fee table with the city's own Building Valuation Data method (higher of actual contractor-reported cost per sq ft or the ICC Building Valuation Data Sheet published in the Building Safety Journal).
Verified 2026-07-08 · Source
When you need this permit
- New single-family or two-family residential construction
- Any work regulated by the statewide-adopted 2021 IRC
- Planning and Zoning, Public Works, and North Summit Fire District sign-offs obtained prior to building permit issuance
- Scaled site plan (minimum 1" = 20') showing property lines, easements, rights of way, setbacks, driveway dimensions/paving, water/sewer tie-ins, grading, and structure height — per Coalville's Building Permit Application Review Procedures
- Three complete sets of legible plans (two physical sets min. 18"x24", one electronic set emailed to cityhall@coalvillecity.org), including a Building Code Analysis cover page, structural plans, elevations, floor plans, footing/foundation drawings, roofing/truss layout, electrical layout, plumbing plan, mechanical heat-loss (Manual J/D) calculations, and a ResCheck energy compliance report, stamped and signed by the engineer or architect of record
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2 fee table. Show full citationHide
Coalville City Fee Schedule (Resolution 2025-1, effective 05/27/2025), 'BUILDING PERMIT FEES' section, item 2 fee table. Building Valuation (item 1) is the higher of actual contractor-reported construction cost per sq ft, or the ICC Building Valuation Data Sheet (Building Safety Journal, updated biannually); residential structures valued per the IRC. A 1% Utah State surcharge (per UCA § 58-54-9-3, as amended) applies to all permits in addition to these fees.Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(c): 'Residential Structures: 65% of building permit fee.' (Detached garages with no living space, decks/porches for existing… Show full citationHide
Coalville City Fee Schedule, 'BUILDING PERMIT FEES' section, item 3(c): 'Residential Structures: 65% of building permit fee.' (Detached garages with no living space, decks/porches for existing structures, and accessory buildings are charged a reduced 15% plan-review rate per item 3(d).)Review timeline
Inspection process
- 1
Footing/Foundation
Required inspection of footing and foundation work prior to backfill, per standard IRC/IBC inspection sequencing referenced in Coalville's Building Permit Application Review Procedures. Schedule with the Building Official (Greg White, 435-640-1799) with a minimum 24-hour notice, per the Building Permit Application form.
- 2
Framing
Framing, sheathing, and rough electrical/plumbing/mechanical inspection prior to insulation and drywall. Minimum 24-hour notice required for scheduling, per the Building Permit Application form.
- 3
Final Building Inspection
Final inspection by the Building Official, coordinated with Public Works and North Summit Fire District sign-offs (both listed as approval blocks on the Building Permit Application form), required prior to occupancy.
See the full Coalville inspection guide — scheduling & re-inspection fees →
Tips
- Coalville City's Building Department office is open Monday–Thursday only, 8:00 AM–5:00 PM (closed Fridays) — different from a standard Mon–Fri schedule.
- A minimum 24-hour notice is required on all inspection requests, per the official Building Permit Application form. Schedule inspections by calling (435) 336-5981.
- New residential or commercial construction plans cannot be hand-drawn, per the Building Permit Application Review Procedures.
- One electronic plan set must be emailed to cityhall@coalvillecity.org in addition to two physical sets sized at minimum 18"x24".
- Building Official Greg White can be reached directly at (435) 640-1799; the general Building Department line (435-336-5981) is used specifically to schedule inspections.
- A 1% Utah State surcharge applies to all building permits per Utah Code § 58-54-9-3, in addition to Coalville's own fee schedule.
- Permits become null and void if work is not commenced within 180 days of issuance, or if construction is suspended/abandoned for 180 days, per the Building Permit Application form.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Coalville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Coalville's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Coalville yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Coalville lands. Privacy.
Other permits in Coalville
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →