This is PermitBase’s published record for Tooele as of 2026-07-04. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Tooele building permits

Verified

Tooele, Utah — as published 2026-07-04.

Verified 2026-07-03 · Source

Codes adopted

2021 International Building Code (IBC) including Appendices C and J — per Tooele City Building Codes and Design Criteria sheet (files.tooelecity.gov/Documents/CommunityDevelopment/BuildingSafetyDivision/Tooele City Building Codes and Design Criteria (08-27-2025).pdf), fetched 2026-07-04.2021 International Residential Code (IRC) including Appendices AQ and AE — per the same Tooele City Building Codes and Design Criteria sheet (08-27-2025).2021 International Plumbing Code (IPC) — per the same source.2021 International Mechanical Code (IMC) — per the same source.2021 International Fuel Gas Code (IFGC, labeled 'IFC' on the city's own sheet) — per the same source.2021 International Existing Building Code (IEBC) — per the same source (listed twice in the city's own document).2021 International Energy Conservation Code (IECC) — commercial provisions — per the same source.2015 International Energy Conservation Code (IECC) — residential provisions — per the same source. Note: this is older than the 2021 IECC used for commercial in the same document; reported exactly as Tooele City's own sheet states it, not corrected or assumed.2023 National Electrical Code (NEC) — per the same source.ICC/ANSI A117.1-2009 (accessibility standard) — per the same source.Utah State Amendments per Title 15A State Construction and Fire Codes Act — per the same source.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, remodels, and any work regulated by the adopted 2021 IBC/IRC in Tooele City. Fees are valuation-based per IBC rate tables, plus a suite of impact and utility fees.

Verified 2026-07-03 · Source

Requirements

  • New single-family residential construction, additions, remodels regulated by the adopted 2021 IRC/IBC
  • Site plan showing property size, existing building locations, wells/septic systems, and the proposed structure location
  • Proof of ownership or permission to build on the property
  • Complete construction documents showing structural and physical elements of the project
  • State of Utah licensed contractors listed on the application (General, Electrical, Mechanical, Plumbing) or an Owner-Builder Certification and Agreement under the Utah Construction Trades Licensing Act (UCA 58-55)

Required documents

  • RequiredBuilding Permit ApplicationTooele City Corporation official form (90 North Main, Tooele, UT 84074); requires description of work, property address, owner/applicant info, licensed contractor names/license numbers/phone, water meter and service size selection, and signatures.
  • OptionalOwner-Builder Certification and AgreementRequired if applicant is not using a licensed contractor; certifies compliance with the Utah Construction Trades Licensing Act (UCA 58-55) and must be notarized.
  • RequiredResidential Construction ChecklistTooele City's published checklist for residential submittals, listed on the Community Development Applications & Forms page.
  • RequiredSite PlanShowing property size, location of existing buildings/wells/septic systems, and location of proposed structure.

Fee schedule

Fee typeAmountNotes
Permit FeeCalculated from project valuation using IBC-established rate tablesTooele City Building Permit Fees Information Sheet: 'The Permit Fee is a specific calculation based off of the valuation, calculated using factors from the specific features in the permit's plans at rates established in the IBC.'
State Surcharge1% of the permit feeTooele City Building Permit Fees Information Sheet: 'The State Surcharge is a fee dictated and required by the state equal to 1% of the permit fee... set by the Legislature of the State of Utah.'
Plan Check Fee65% of the Permit FeeTooele City Building Permit Fees Information Sheet: 'This fee is generally calculated to be equal to 65% of the Permit Fee.'
Sanitary Sewer Impact Fee$4,731.00 per Equivalent Residential Unit (ERU)Per Tooele City's 2023 Wastewater Impact Fee Facilities Plan and Impact Fee Analysis, confirmed via WebSearch summary of Tooele City's adopted Fee Schedule (current as of 06/23/2026).
Culinary Water Impact Fee$7,805.00 per Equivalent Residential Connection (ERC)Per Tooele City's Culinary Water System Master Plan (2021), confirmed via WebSearch summary of Tooele City's adopted Fee Schedule (current as of 06/23/2026).
Parks & Recreation Impact Fee (single-family)$3,194 per unitTooele City adopted Fee Schedule (current as of 06/23/2026), Parks & Recreation Impact Fee section, single-family rate.
Public Safety Impact Fee (single-family, fire + police combined)$255.90 (fire) + $216.90 (police) per dwelling unitTooele City adopted Fee Schedule (current as of 06/23/2026), Public Safety Impact Fee section, single-family residential rate.
Water Meter Fee$424 (3/4-inch meter) up to $7,203 (6-inch meter), by meter sizeTooele City adopted Fee Schedule (current as of 06/23/2026), Water Meter cost table.
Tree Bond$150.00 per treeTooele City Building Permit Fees Information Sheet: 'Trees are bonded at a rate of $150.00 per tree and the property owner is eligible to apply for reimbursement of the bond amount after successful inspection of the tree(s) after one year's time has passed from the Certificate of Occupancy.'
Water Rights Transfer0.45 acre-feet (residential structure); 4.0 acre-feet per irrigable acre (exterior/irrigated area)Tooele City Code Chapter 7-26, per the Building Permit Fees Information Sheet: 'For residential uses, the amount of water rights required for use within the structure is 0.45 acre-feet... Water right requirements for the exterior areas are calculated a rate of 4.0 acre-feet per irrigable acre.' Not a cash fee — a water-rights transfer requirement satisfied prior to permit issuance; market value varies.
Sewer Connection Fee, Water Connection Fee, Water Deposit, Latecomer's FeeContact Tooele City Community Development for current amountsPer the Building Permit Fees Information Sheet, these fees are 'contained in the Tooele City Fee Schedule as adopted by the Tooele City Council' but specific current dollar amounts for these particular line items were not found in any Tooele City source resolvable as of 2026-07-04 (may not apply to every lot, e.g. where subdivision-stubbed laterals already exist). Omitted rather than estimated.

Demolition Permit

Verified

Required for demolition of residential and non-residential structures in Tooele City. Distinct flat application fees and separate bonds apply by structure type.

Verified 2026-07-03 · Source

Requirements

  • Demolition of any residential or non-residential structure within Tooele City limits

Required documents

  • RequiredBuilding Permit Application (Demolition)Tooele City Building Permit application form marked for demolition scope of work.

Fee schedule

Fee typeAmountNotes
Demolition Permit Application Fee (Residential)$160Tooele City adopted Fee Schedule (current as of 06/23/2026), Demolition Permits section, residential application rate.
Demolition Permit Application Fee (Non-Residential)$250Tooele City adopted Fee Schedule (current as of 06/23/2026), Demolition Permits section, non-residential application rate.
Demolition Bond (Residential)$2,500Tooele City adopted Fee Schedule (current as of 06/23/2026), Demolition Permits section, residential bond rate.
Demolition Bond (Non-Residential)$5,000Tooele City adopted Fee Schedule (current as of 06/23/2026), Demolition Permits section, non-residential bond rate.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tooele building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/tooele-county/tooele/as-of/2026-07-04/

Snapshot date: 2026-07-04

Commit: bfcb452

Reproducible from PermitBase’s version-controlled dataset, commit bfcb452.