Skip to main content
PermitBase

Tooele building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Tooele, Utah.

Last verified 2026-07-03 · Source · Embed this page’s badge · Version history

Building department

Address
90 North Main Street, Tooele, UT 84074
Phone
(435) 843-2132
Office hours
Mon–Fri 8:00 AM – 5:00 PM, per tooelecity.gov Community Development Department page. Building Official: Brad Alder (brada@tooelecity.gov); Community Development Director: Andrew Aagard, per the same page (fetched 2026-07-04).

Inspection guide

See how inspections work in Tooele — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Tooele City's own Building Codes and Design Criteria sheet (08-27-2025) still displays the pre-7/1/2026 edition list; re-fetched live 2026-07-16 from the same URL (files.tooelecity.gov/.../Tooele City Building Codes and Design Criteria (08-27-2025).pdf) and PDF-text-extracted — content is byte-for-byte the same list as the original 2026-07-04 fetch, and it is still the current document linked from the city's Applications & Forms page. State law governs regardless of the page's lag; each line below states current law first, then the city's as-published (stale) text.
  • 2024 International Building Code (IBC) including Appendices C and J — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Tooele City's Building Codes and Design Criteria sheet still lists '2021 INTERNATIONAL BUILDING CODE (IBC) INCLUDING APPENDICES C AND J' (live re-check 2026-07-16).
  • 2021 International Residential Code (IRC) including Appendices AQ and AE — per Utah Code § 15A-2-103(1)(b)/(c)/(k); this edition did NOT change in the 7/1/2026 flip (Appendix AE is separately adopted under § 15A-2-103(1)(k), subject to § 15A-2-104(1)). Matches Tooele City's sheet, which lists '2021 INTERNATIONAL RESIDENTIAL CODE (IRC) INCLUDING APPENDICES AQ AND AE' (live re-check 2026-07-16).
  • 2024 International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Tooele City's sheet still lists '2021 INTERNATIONAL PLUMBING CODE (IPC)' (live re-check 2026-07-16).
  • 2024 International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Tooele City's sheet still lists '2021 INTERNATIONAL MECHANICAL CODE (IMC)' (live re-check 2026-07-16).
  • 2024 International Fuel Gas Code (IFGC, labeled 'IFC' on the city's own sheet) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Tooele City's sheet still lists '2021 INTERNATIONAL FUEL GAS CODE (IFC)' [sic — the city's own document mislabels the IFGC as 'IFC'; this is NOT a reference to the actual International Fire Code, which § 15A-2-103 does not adopt at all (see IFC note below)] (live re-check 2026-07-16).
  • 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Tooele City's sheet still lists '2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC)' (listed twice in the city's own document; live re-check 2026-07-16 confirms both instances unchanged).
  • 2024 International Energy Conservation Code (IECC), per Utah Code § 15A-2-103(1)(h) — ONE statewide edition, no residential/commercial split. Tooele City's own sheet still splits IECC into '2021 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) USE COMMERCIAL PROVISIONS' and '2015 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) USE RESIDENTIAL PROVISIONS' (live re-check 2026-07-16, unchanged) — collapsed here to the single current 2024 statewide edition per statute, with the city's split preserved as history: the 2015-residential/2021-commercial split pre-dates the 7/1/2026 flip and was already an unusual, internally inconsistent split under the PRIOR law (2015 residential IECC was already an older cycle than the 2021 commercial IECC in the same document) — a PRE-EXISTING lag, separate from and older than the 2026 transition.
  • 2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip, and Tooele City's own sheet already correctly lists '2023 NATIONAL ELECTRICAL CODE (NEC)' (live re-check 2026-07-16) — no correction needed here.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on Tooele City's Building Codes and Design Criteria sheet or Applications & Forms page as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.
  • Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on Tooele City's Building Codes and Design Criteria sheet as of live re-check 2026-07-16; added as a statute-sourced omission.
  • No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the actual IFC — it is separately governed under Title 15A Chapter 5, outside the scope of this section. The 'IFC' label on Tooele City's own sheet is a mislabeling of the IFGC (see IFGC line above), not a genuine IFC citation, so there is no separate IFC mis-citation to correct.
  • ICC/ANSI A117.1-2009 (accessibility standard) — per the same source (live re-check 2026-07-16, unchanged). This accessibility standard is not among the codes enumerated in Utah Code § 15A-2-103(1); reproduced here as Tooele City's own published statement, not itself corrected against that section.
  • Utah State Amendments per Title 15A State Construction and Fire Codes Act — per the same source.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date
No data reported
Latest full year
No data reported

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Tooele City Corporation (city, address 90 North Main St) is a distinct jurisdiction from Tooele County (whose Community Development pages live at tooeleco.gov) — verify you are looking at tooelecity.gov (city) sources, not tooeleco.gov (county), when researching this jurisdiction.
  • Tooele City's own Building Codes and Design Criteria sheet (08-27-2025) lists 2021 IECC for commercial provisions but 2015 IECC for residential provisions — an unusual split, PRE-EXISTING and older than the 2026 code-cycle flip (the 2015 residential figure was already stale relative to the 2021 commercial figure under the prior law), reported exactly as published in this note but collapsed to the single current 2024 statewide IECC edition in codesAdopted per Utah Code § 15A-2-103(1)(h), effective 7/1/2026.
  • As of Utah Code § 15A-2-103's 7/1/2026 code-cycle flip (Ch. 47, 2026 General Session), state-mandated editions are 2024 IBC/IPC/IMC/IFGC/IECC/IEBC, residential provisions of the 2024 ISPSC, and MBI 1200/1205, while the 2021 IRC and 2023 NEC did not change. Tooele City's sheet still displays the pre-flip 2021 edition list for IBC/IPC/IMC/IFGC/IEBC (live re-check 2026-07-16, unchanged since original review) and does not mention ISPSC or MBI at all; its 2023 NEC citation already matches current law and needed no change.
  • Permits become null and void if work is not commenced within 180 days of approval signatures, or if work is suspended 180+ days after commencement.
  • All inspections must be scheduled by 4:30 PM the business day before the requested time; cancellations by 3:00 PM the business day before.
  • Water rights transfer (0.45 acre-feet per residential structure under Tooele City Code Chapter 7-26) is a distinct non-cash prerequisite to permit issuance, separate from the standard fee stack — contact the City Engineer for property-specific requirements.
  • No jurisdiction-published plan-review or permit-issuance turnaround time (business or calendar days) was found for any permit type as of 2026-07-04 — reviewTimelineDays is honestly null with a note rather than estimated, matching the pattern already documented for sibling Utah cities American Fork and Murray in this corpus.
  • Tooele City Community Development Department contacts as of 2026-07-04: Director Andrew Aagard; Building Official Brad Alder (brada@tooelecity.gov); general inquiries cd@tooelecity.gov, (435) 843-2132.

Comparable nearby cities

Unincorporated Tooele County
Both in Tooele County8 shared permit types
Compare fees →
Grantsville
Both in Tooele County6 shared permit types~10 mi away
Compare fees →
South Jordan
9 shared permit types~17 mi away
Compare fees →