EV Charger / EVSE Permit in Tooele, Utah
Tooele City does not publish a distinct EV-charger/EVSE fee category, and its Fee Schedule's Building section publishes no separate standalone Electrical Permit fee at all. Building Permit Plan Reviews are billed 'at IBC rate' for each structure type, with a catch-all 'All Other Building Fees: Per IBC' line — the same valuation-based approach used for the general Residential/Commercial Building Permit. This was confirmed by a direct read of the Building section (pages 20-21 of the Tooele City Fee Schedule, current as of July 17, 2026), which lists Building Permit Plan Reviews, a $50 Power-To-Panel Agreement fee, Inspections and Bonds, Temporary Certificate of Occupancy, Demolition Permit, and Stop Work Orders — with no separate electrical or EV-specific line item anywhere in that section.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
- New dedicated electrical circuit and/or panel capacity to serve the charger
- Subject to the same IBC-rate valuation-based fee as other building/trade work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical / Building Inspection
Inspection of the new EVSE circuit and any panel work by the Tooele City Building Division; General Purpose inspection fee is $50 (Fee Schedule, Building section).
See the full Tooele inspection guide — scheduling & re-inspection fees →
Tips
- Tooele City has no separate EV-charger fee category and no standalone Electrical Permit fee — EV/EVSE installations are billed under the same IBC-rate valuation table used for all other building/trade work.
- If the installation requires a new power-to-panel agreement with the utility, a separate $50 fee applies.
- A 1% state surcharge and 65% plan check fee apply on top of the base valuation fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tooele building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tooele
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Tooele project checklist
Describe your project once and get every permit, document, and fee it triggers in Tooele — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →