Residential Building Permit — Tooele, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://files.tooelecity.gov/Documents/CommunityDevelopment/BuildingSafetyDivision/Tooele%20City%20Building%20Codes%20and%20Design%20Criteria%20(08-27-2025).pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Tooele, Utah
Required for new residential construction, additions, remodels, and any work regulated by the state-mandated 2021 IRC and 2024 IBC in Tooele City (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged). Fees are valuation-based per IBC rate tables, plus a suite of impact and utility fees. Rooftop and ground-mounted solar PV installations fall under this same Building Permit (structural/mounting scope) plus standard electrical permitting for the interconnection — Tooele City's current Fee Schedule page and Applications & Forms page (both re-checked 2026-07-19) publish no distinct solar-specific fee line item or submittal form, unlike some neighboring jurisdictions.
Verified 2026-07-20 · Source
When you need this permit
- New single-family residential construction, additions, remodels regulated by the state-mandated 2021 IRC and 2024 IBC (Tooele City's own sheet still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
- Site plan showing property size, existing building locations, wells/septic systems, and the proposed structure location
- Proof of ownership or permission to build on the property
- Complete construction documents showing structural and physical elements of the project
- State of Utah licensed contractors listed on the application (General, Electrical, Mechanical, Plumbing) or an Owner-Builder Certification and Agreement under the Utah Construction Trades Licensing Act (UCA 58-55) Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour, per standard IRC/IBC inspection sequence; all inspections require 1 working day advance notice per the Tooele City Building Permit application form.
- 2
Framing
After framing, sheathing, and MEP rough-in complete.
- 3
Final / Certificate of Occupancy
Final inspection required before occupancy; work must remain accessible and exposed until passed by the Inspector per the Building Permit application form's declaration.
See the full Tooele inspection guide — scheduling & re-inspection fees →
Tips
- Inspection scheduling must be completed by 4:30 PM the business day before the requested time; cancellations must be made by 3:00 PM the business day before — per the Tooele City Building Permit application form.
- A permit becomes null and void if work is not commenced within 180 days of approval, or if work is suspended for 180 days or more after commencement.
- Tooele City Community Development office is open Monday–Friday 8:00 AM–5:00 PM (no listed Friday closure, unlike some neighboring Utah County cities).
- Applications can be submitted online through the Tooele City Building Permit Portal (tooelecity.portal.iworq.net/portalhome/tooelecity) per the Applications & Forms page.
- Water rights transfer (0.45 acre-feet for residential structures under Tooele City Code Chapter 7-26) is a separate non-cash requirement that must be satisfied prior to permit issuance — contact the City Engineer to determine the amount required for a specific property.
- Solar panel (PV) installations — rooftop or ground-mounted — are permitted through this same Building Permit for the structural/mounting work, with the interconnection wiring covered under standard electrical permitting; Tooele City does not publish a separate solar permit application, checklist, or fee line item (re-checked on the current Fee Schedule and Applications & Forms pages, 2026-07-19), unlike Taylorsville's dedicated 'Solar P.V. Systems' (B-7) form or Cache/Box Elder County's itemized solar fees. Confirm the exact submittal package with Community Development, (435) 843-2132, before applying.
- EV charger/EVSE installation is electrical work covered under this same Building Permit — Tooele City's Fee Schedule page and Applications & Forms page (both re-checked 2026-07-20) publish no EV-charger-specific or electric-vehicle line item. The Fee Schedule does note that a separate 'Inspection Fee' (rather than the full valuation-based building fee) applies to permits for 'specialty work such as electrical work only' — a standalone EV charger circuit would likely fall under that category; confirm with Community Development, (435) 843-2132, before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tooele building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tooele
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →