Fire Plan Review Permit (Fire Sprinkler & Fire Alarm Systems) in Tooele, Utah
Tooele City does not publish separate line-item fees for fire sprinkler and fire alarm systems the way some neighboring Utah cities do. Instead, new fire protection system installations (including sprinkler and alarm systems) for new construction or remodel work go through a single 'Fire Plan Review Permit,' submitted to and reviewed by Tooele City Community Development / Fire Department together, with one associated permit fee. Re-chased 2026-07-20: re-fetched the Fire Plan Review Permit application form directly, confirmed the current version (still dated 02-2025, unchanged) shows the identical pre-printed 'OFFICE USE ONLY 0202 — $500' fee field; re-searched the live Fee Schedule page's full 'Fire Permits IFC 105.6' section (Fireworks, Pyrotechnics, Hot Works, Exhibit/Trade Show, Special Amusement, Temporary Structures, Carnivals, Non-Combustible Temporary Structures) line by line and confirmed no fire sprinkler/alarm plan-review or permit line, and no fee code '0202,' appears anywhere on the general schedule. The $500 figure on the official application form is the only fee Tooele City publishes anywhere for this permit type.
Verified 2026-07-20 · Source
When you need this permit
- Applies to plan review for new construction or remodel only, per the Fire Plan Review Permit application form
- Submit the Fire Plan Review Permit application either online (select 'Fire Plan Review' as the permit type) or in person/by mail to the Community Development Department, Suite 108, Tooele City Hall, 90 North Main Street
- Include property information (parcel #, section, lot size, block #, subdivision, zone, lot #) and a description of the fire plan work
- Permit becomes void if work is not commenced within 180 days of approval, or is suspended 180+ days after commencement
- All required inspections must be scheduled at least 1 working day in advance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Fire Plan Inspection
Work must remain accessible and exposed until passed by the inspector; inspections must be requested at least 1 working day before they are to be made.
See the full Tooele inspection guide — scheduling & re-inspection fees →
Tips
- Unlike some neighboring Utah cities (e.g., Roy City, Spanish Fork), Tooele City's published Fee Schedule does not break out separate dollar figures for fire sprinkler system plan review vs. fire alarm system plan review — both appear to route through the same generic 'Fire Plan Review Permit.'
- The $500 fee comes from the pre-printed office-use field on the application form itself, not from the general online Fee Schedule page. Re-confirmed current 2026-07-20 by re-fetching the live form directly (unchanged) and re-searching the full Fee Schedule fire-permits section (no conflicting or updated figure found) — this appears to be a genuinely stable, correctly-cited fee.
- Tooele City's fee schedule does separately list several recurring/inspection fire fees not tied to new installation — e.g., 'Fire Alarm Panel Inspection – submitted to 3rd party' ($25) and 'Fire Riser Inspection – submitted to 3rd party' ($25) — these are distinct from the Fire Plan Review Permit fee and appear to apply to ongoing testing/inspection rather than new system plan review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tooele building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tooele
Fire Plan Review Permit (Fire Sprinkler & Fire Alarm Systems) in other cities
Compare fire plan review permit (fire sprinkler & fire alarm systems) fees across Utah →
Look up this fee in a different city →
Now live
Build your Tooele project checklist
Describe your project once and get every permit, document, and fee it triggers in Tooele — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →