Version history — Tooele, Utah
This is PermitBase’s own verified record for Tooele, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Tooele’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-25Current record
- 2026-07-22Superseded
- 2026-07-21Superseded
- 2026-07-20Superseded
- Tooele, Utah — Fire Plan Review Permit (Fire Sprinkler & Fire Alarm Systems) record added
- Tooele, Utah — Sign Permit fee record updated: Per IBC → Calculated from project valuation using IBC-established rate tables ("Per IBC")
- Tooele, Utah — Sign Permit record added
- Tooele, Utah — EV Charger / EVSE Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-04Initial record — coverage of Tooele began