Skip to main content
PermitBase

This is PermitBase’s published record for Unincorporated Tooele County as of 2026-07-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Tooele County building permits

Verified

Unincorporated Tooele County, Utah — as published 2026-07-16.

Verified 2026-07-03 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — governs per Utah Code §15A-2-103(1)(a) (https://le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), in force statewide since 7/1/2026 and binding on counties under §15A-1-204. Tooele County's own Building Permits page still lists the 2021 IBC (no appendices specified) — live-checked 2026-07-16, the county's own page has not been updated to the current statewide edition.2021 International Residential Code (IRC), including Appendix AQ — governs per Utah Code §15A-2-103(1)(b)/(c); this edition is UNCHANGED from the prior code cycle. Tooele County's own Building Permits page lists the 2021 IRC — live-checked 2026-07-16, consistent with the current statute on the base edition.2024 International Mechanical Code (IMC) — governs per Utah Code §15A-2-103(1)(e). Tooele County's own Building Permits page still lists the 2021 IMC — live-checked 2026-07-16, lags the current statewide edition.2024 International Plumbing Code (IPC) — governs per Utah Code §15A-2-103(1)(d). Tooele County's own Building Permits page still lists the 2021 IPC — live-checked 2026-07-16, lags the current statewide edition.2024 International Fuel Gas Code (IFGC) — governs per Utah Code §15A-2-103(1)(f). Tooele County's own Building Permits page still lists the 2021 IFGC — live-checked 2026-07-16, lags the current statewide edition.2024 International Energy Conservation Code (IECC) — one code, no residential/commercial split, per Utah Code §15A-2-103(1)(h). Tooele County's own Building Permits page still lists the 2021 IECC — live-checked 2026-07-16, lags the current statewide edition.2021 International Fire Code (IFC) — per Tooele County's own Building Permits page, live-checked 2026-07-16 and unchanged. Utah Code §15A-2-103 does NOT adopt the IFC (fire codes are addressed separately under Title 15A, Chapter 5, the State Fire Code Act) — this edition is left as the county's own published figure rather than reconciled to §15A-2-103, since that statute does not govern it. NOTE: Tooele County's own list includes the IFC explicitly (cited directly in its Fire Protection Criteria for Unincorporated Tooele County, referencing IFC 503.1.1 and Appendix D); Tooele City's own sheet does not list a standalone IFC edition. This is a genuine difference between the two jurisdictions' own published code lists, reported as each jurisdiction states it.2023 National Electrical Code (NEC) — governs per Utah Code §15A-2-103(1)(g); this edition is UNCHANGED from the prior code cycle, and Tooele County's own Building Permits page already correctly lists the 2023 NEC — live-checked 2026-07-16, no lag on this edition.2024 International Existing Building Code (IEBC) — governs statewide per Utah Code §15A-2-103(1)(i). Tooele County's own Building Permits page does NOT list the IEBC at all — live-checked 2026-07-16; added here per the statute, not omitted from this file.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — governs statewide per Utah Code §15A-2-103(1)(n). Tooele County's own Building Permits page does NOT list the ISPSC at all — live-checked 2026-07-16; added here per the statute, not omitted from this file.Modular Building Institute (MBI) Standards 1200 and 1205 — governs statewide per Utah Code §15A-2-103(1)(o). Not listed on Tooele County's own Building Permits page — live-checked 2026-07-16.Utah State Amendments to the Building Codes (Utah Code Title 15A, Chapter 3) — per Tooele County's own Building Permits page, linking directly to le.utah.gov Title 15A Chapter 3.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, remodels, and any work regulated by the statewide-adopted 2024 IBC / 2021 IRC (per Utah Code §15A-2-103) in unincorporated Tooele County; the county's own application form still cites 2021-cycle editions (live-checked 2026-07-16). The county's own application form covers Building, Electrical, HVAC, Plumbing, Energy, Occupancy, Sign, Construction, and Demolition permits under a single combined application.

Verified 2026-07-03 · Source

Requirements

  • New single-family residential construction, additions, remodels regulated by the statewide-adopted 2024 IBC / 2021 IRC (Utah Code §15A-2-103); Tooele County's own application form cites 2021 IRC/IBC
  • Complete and submit all supporting documents at time of submittal — incomplete applications are not accepted
  • Dimensioned site plan showing north direction, lot lines, adjacent streets/roads/rights-of-way, existing structures/wells/septic tanks, proposed construction, and motor vehicle access
  • One complete set of construction plans (may include gas pipe sizing diagram, stucco specifications, proof of energy code compliance)
  • Site Plan Approval from the Tooele County Fire Department
  • Utility approval forms (gas, electric, sewer, water) if new service or additional load is being added
  • For properties not connected to community water/sewer: certificate of approval from the Tooele County Health Department for water and septic, per Tooele County Land Use Ord. 4-16 (Ord. 2005-22, 9/13/2005)
  • Architectural Control Committee approval where required in subdivisions

Required documents

  • RequiredBuilding Permit Application and General InstructionsTooele County's combined application form (building-permit-012225.pdf, rev. 01-22-2025) covering Building, Electrical, HVAC, Plumbing, Energy, Occupancy, Sign, Construction, and Demolition permits; includes utility contact list, fire department contacts, and Fire Protection Criteria for Unincorporated Tooele County.
  • RequiredDimensioned Site PlanMust show north direction, lot lines, adjacent streets/roads/rights-of-way, location of existing structures/wells/septic tanks, location of proposed construction, and motor vehicle access; must carry Site Plan Approval from the Tooele County Fire Department.
  • RequiredComplete Set of Construction PlansMay include gas pipe sizing diagram, stucco specifications, proof of compliance with the adopted energy code, and Fire Department plan approval.
  • RequiredProof of OwnershipRequired for all applications per the county's own checklist.
  • OptionalHealth Department Water/Septic CertificateRequired only for properties not connected to a community water or sewer system, per Tooele County Land Use Ord. 4-16 (Ord. 2005-22).

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based, per Uniform Building Code fee-calculation provisions
Tooele County adopted Fee Schedule (effective 5-19-26), Building Permit Fees section: 'The Building Official shall determine valuations for the purpose of calculating fees by using for each calendar… Show full citation

Tooele County adopted Fee Schedule (effective 5-19-26), Building Permit Fees section: 'The Building Official shall determine valuations for the purpose of calculating fees by using for each calendar year the first Building Valuation Data publication issued during that calendar year by the International Conference of Building Officials. The Building Official shall adjust each calculated valuation by the regional modifier listed in said publication for Utah using the grade of construction determined to be applicable. The fee shall then be determined by reference to the Uniform Building Code provisions regarding the calculation of fees.'

Factory Built Housing, Manufactured Homes, and Modular Units45% of the valuation listed in the applicable Building Valuation Data publicationTooele County adopted Fee Schedule (effective 5-19-26), Building Permit Fees section.
State Surcharge1% of the building permit fee
Tooele County adopted Fee Schedule (effective 5-19-26): 'Tooele County shall assess and collect a surcharge equal to one percent of the building permit fee in compliance with Utah state law... Show full citation

Tooele County adopted Fee Schedule (effective 5-19-26): 'Tooele County shall assess and collect a surcharge equal to one percent of the building permit fee in compliance with Utah state law... shall remit eighty percent of the amount of the surcharge to have been assessed to said Division [DOPL].'

Impact Fee — Tooele County Parks, Recreation and Trails (Single Family)$2,305Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section, created by Ordinance 2024-07 (adopted 9/3/2024, effective 12/2/2024).
Impact Fee — Parks (Multi Family, per unit)$1,898Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — Tooele County Public Safety (Single Family, per dwelling unit)$394Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — Tooele County Public Safety (Multi Family, per dwelling unit)$289Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — Tooele County Fire (Single Family, per dwelling unit)$201Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — Tooele County Fire (Multi Family, per dwelling unit)$75Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — North Tooele Fire District$583.93Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section. Applies within the North Tooele Fire District boundary rather than county-wide.
Impact Fee — Stansbury Park Service Agency$2,700Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section. Applies within the Stansbury Park Service Agency boundary.
Impact Fee — Transportation (Single Family Home)$489Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — Transportation (Multi Family, low-rise)$349Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.
Impact Fee — Transportation (Multi Family, low-rise with ground-floor commercial)$178Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section.

Demolition Permit

Verified

Required for demolition of any building or structure in unincorporated Tooele County. The county's combined Building Permit Application form explicitly covers 'Construction and Demolition' under a single application; no separate demolition-specific fee or bond line item was found in the county's adopted Fee Schedule.

Verified 2026-07-03 · Source

Requirements

  • Demolition, moving, or change of use of any building or structure within unincorporated Tooele County requires a permit, per Utah state and Tooele County law
  • Same combined Building Permit Application and General Instructions form used for new construction

Required documents

  • RequiredBuilding Permit Application and General InstructionsTooele County's combined application form (building-permit-012225.pdf) marked for demolition scope of work.

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeContact Tooele County Development Department for current amount
Tooele County's adopted Fee Schedule (effective 5-19-26) lists a valuation-based Building Permit Fee formula and a 1% state surcharge, but no separate flat demolition-specific fee or bond line item… Show full citation

Tooele County's adopted Fee Schedule (effective 5-19-26) lists a valuation-based Building Permit Fee formula and a 1% state surcharge, but no separate flat demolition-specific fee or bond line item was found anywhere in the 21-page fee schedule PDF as of 2026-07-04. The county's Building Permits page states state/county law requires a permit to 'demolish' a structure, and the application form covers demolition, but no distinct dollar figure for demolition alone is published. Omitted rather than estimated.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Tooele County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-04)Later version (2026-07-19) →View current record →All versions →

Permalink: /utah/tooele-county/unincorporated-tooele/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.