Skip to main content
PermitBase

This is PermitBase’s published record for Unincorporated Uintah County as of 2026-07-08. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Uintah County building permits

Verified

Unincorporated Uintah County, Utah — as published 2026-07-08.

Verified 2026-07-08 · Source

Codes adopted

2021 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective through June 30, 2026. Uintah County's own Building Code page (last fetched 2026-07-08) states '2021 International Building Codes Effective July 1, 2023.'2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); continues in force after July 1, 2026.2021 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective through June 30, 2026.2021 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective through June 30, 2026.2021 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective through June 30, 2026.2021 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective through June 30, 2026.2021 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective through June 30, 2026. Uintah County's FAQ page cites the 2018 IEBC (Chapter 14) for relocated/moved structures, which is out of date relative to the current statewide 2021 edition.2021 International Swimming Pool and Spa Code (ISPSC, residential provisions) — Utah Code § 15A-2-103(1)(n); effective through June 30, 2026.2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force. NOTE: Uintah County's Building Code Information page (last fetched 2026-07-08) still lists '2020 National Electrical Code (NEC) Effective July 1, 2021' — that page is not updated; the statewide 2023 NEC (confirmed via the currently codified version of Utah Code § 15A-2-103, effective 7/1/2025) is the legally in-force edition.NOTE: Effective July 1, 2026 — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replace the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026).

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwelling construction, additions, remodels, and manufactured homes on private lots in unincorporated Uintah County. The Uintah County Community Development Building Division issues and reviews all building permits for land outside incorporated cities (Vernal, Naples). Fee is calculated per square foot by occupancy classification under the county's adopted fee schedule.

Verified 2026-07-08 · Source

Requirements

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Remodels and structural alterations
  • Manufactured home installation on a private lot (requires a permanent foundation system per County Code 18.03 of the Administrative Manual)
  • Property must be a legally buildable lot (split through the county's subdivision process)

Required documents

  • RequiredResidential Building Permit ApplicationCompleted application form (SFD Permit Application Packet 2025) submitted to the Community Development Department, 152 E 100 N, Vernal, UT, or online
  • RequiredProof of OwnershipMost current tax statement, deed, or property information sheet
  • RequiredSite PlanNorth indicator, lot shape/dimensions, footprint of all structures (existing and proposed), setbacks from all property lines, easements, canals/ditches/drainages, driveway location, wells/septic systems, and FEMA floodplain
  • RequiredTwo Complete Sets of Building PlansLegible, to-scale sets (minimum 11x17), designed to the currently adopted IRC — floor plans, elevations, cross sections, framing/footing/foundation details, electrical/plumbing/mechanical details per the county's Building Plans Checklist
  • RequiredWater and/or Sewer Availability LetterLetter from the local water district confirming water/sewer availability and stating the distance to the nearest fire hydrant
  • OptionalFire Hydrant Approval LetterRequired from the Fire Marshal if no hydrant is within 600 feet of the proposed structure
  • OptionalSeptic Construction Permit / Well Water ApprovalLetter from the Tri-County Health Department when a septic system and/or private well is planned
  • OptionalRoad Encroachment PermitFrom the Uintah County Road Department, required for any work in the county right-of-way (driveways, utility connections) unless the lot has curb and gutter
  • OptionalOwner/Builder CertificationNotarized form required if the property owner will act as their own contractor
  • RequiredAgreement for Electrical MeterSigned agreement governing temporary construction power and conditions for setting a permanent meter

Fee schedule

Fee typeAmountNotes
Residential (R-3 and R-4 occupancy) — per square foot$0.70 per sq ftUintah County Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025, effective ~8/27/2025), Community Development Fee Schedule — Building Permit Fees table, 'R-3 and R-4 / Residential' occupancy row.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — Permit Fee by Activity & Flat Fee table.
Unfinished Basement$0.40 per sq ftUintah County Fee Schedule, Ord. 08-06-2025 O1.
Porches, Decks and Other Un-Walled Structures$0.25 per sq ftUintah County Fee Schedule, Ord. 08-06-2025 O1.
Manufactured Home (factory-built portion only, no basement or garage)$0.40 per sq ftUintah County Fee Schedule, Ord. 08-06-2025 O1.
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule, Ord. 08-06-2025 O1 — Review of Plans table. A portion is due at time of application per the Administrative Manual § 17.03; nonrefundable once plan check has commenced.
Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 (Inspection/Re-Inspection fee line item); consistent with Administrative Manual § 17.04, which allows a $50 re-inspect fee after the 2nd inspection of the same type, and a $50 fee for late-cancelled or not-ready inspections.

Electrical Permit

Verified

Required for residential electrical service upgrades/replacements, temporary power pedestals, and agricultural electrical service in unincorporated Uintah County.

Verified 2026-07-08 · Source

Requirements

  • Residential electrical service upgrade or replacement
  • Temporary construction power pedestal installation
  • Agricultural electrical service
  • Any new electrical work in an otherwise-exempt agricultural building

Required documents

  • RequiredElectrical, Mechanical and Plumbing Building Permit ApplicationCompleted application listing the electrical contractor and license number, submitted to the Community Development Department
  • OptionalElectrical Single-Line Diagram / PlanPanel location, meter size and location, circuit layout — required per the county's plan review checklist for new construction and service upgrades

Fee schedule

Fee typeAmountNotes
Residential Electrical Service Upgrade or Replacement$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table.
Temporary Power Pedestals$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Agricultural Electrical Service$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Commercial/Utility Equipment and Commercial Electrical Service$200.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Mechanical / HVAC Permit

Verified

Required for replacement of furnaces, air conditioners, water heaters, and boilers, and for LPG-to-natural-gas conversions in unincorporated Uintah County.

Verified 2026-07-08 · Source

Requirements

  • Furnace, AC unit, water heater, or boiler replacement
  • LPG conversion to natural gas
  • New HVAC system installation (part of new construction fee)
  • Adding mechanical systems to a building that previously had none

Required documents

  • RequiredElectrical, Mechanical and Plumbing Building Permit ApplicationCompleted application listing the mechanical contractor and license number
  • OptionalEquipment SpecificationsManufacturer data for furnace, AC, boiler, or water heater

Fee schedule

Fee typeAmountNotes
Replacement of AC Unit, Furnace, Water Heater, Boiler, etc.$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table.
LPG Conversion to Natural Gas$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Adding Plumbing, Mechanical or Electrical to a Building Without Such Facilities$150 (0–1,499 sq ft); $300 (1,500–4,999 sq ft); $400 (5,000 sq ft and over)Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Solar Panel Permit

Verified

Required for installation of solar photovoltaic systems and residential wind/radio towers in unincorporated Uintah County. Fee tier depends on system size.

Verified 2026-07-08 · Source

Requirements

  • Rooftop or ground-mounted solar PV installation
  • Generator power installations
  • Residential wind and/or radio tower installation

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted to the Community Development Department
  • RequiredElectrical Single-Line DiagramSystem wiring from panels/array to inverter to main panel and utility meter
  • RequiredEquipment SpecificationsManufacturer specifications for panels, racking, and inverter

Fee schedule

Fee typeAmountNotes
Solar (less than 10kW) and Generator Power Installations$200.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — does not include accessory structure.
Solar Installations 10kW and Larger$400.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — does not include accessory structure.
Residential Wind and/or Radio Tower$200.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Demolition Permit

Verified

Required for demolition of any structure in unincorporated Uintah County. Includes required Fire Marshal and Health Department sign-off, plus a state Division of Air Quality notification.

Verified 2026-07-08 · Source

Requirements

  • Complete demolition of any structure
  • Asbestos inspection prior to demolition (hired-contractor demolitions; owner-performed demolition of a private home is exempt per Utah House Bill 285)
  • Division of Air Quality notification at least two weeks prior to demolition (required even if no asbestos is found)
  • Fire Marshal and Tri-County Health Department sign-off on the Demolition Application

Required documents

  • RequiredDemolition ApplicationCompleted form submitted to the Community Development Department with Fire Marshal and Health Department approval signatures
  • RequiredDivision of Air Quality Notification / ApprovalCopy of the state notification form (asbestos and demolition notification forms available at airquality.utah.gov) submitted at least two weeks before demolition; approx. $50 state fee
  • OptionalAsbestos InspectionRequired if demolition is performed by a hired contractor; private homeowners performing their own demolition are exempt per HB 285

Fee schedule

Fee typeAmountNotes
Demolition of a Structure$0.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table lists 'Demolition of a Structure' at $0.00. This supersedes the older $100 flat fee shown on the county's standalone Demolition Application form, which predates this fee schedule ordinance.
State Division of Air Quality Notification FeeApprox. $50.00 (paid to the State, not the county)Uintah County Demolition Application — Step 3 instructions.

Retaining Wall Permit

Verified

Required for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) or any wall supporting a surcharge, in unincorporated Uintah County. Walls at or under 4 feet that do not support a surcharge are exempt per the IRC.

Verified 2026-07-08 · Source

Requirements

  • Retaining walls over 4 feet in total height (bottom of footing to top of wall)
  • Any retaining wall supporting a surcharge, regardless of height
  • Walls not exceeding 4 feet in height and not supporting a surcharge are exempt from a permit under IRC R105.2 (as reprinted in the county's Building Permit FAQ)

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted to the Community Development Department
  • RequiredSite PlanWall location relative to property lines, structures, and utilities
  • OptionalEngineered Wall PlansRequired for walls supporting a surcharge or where engineering is otherwise warranted

Fee schedule

Fee typeAmountNotes
Retaining Walls Over 4 Feet$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation in unincorporated Uintah County. Prefabricated pools less than 24 inches deep are exempt under IRC R105.2.

Verified 2026-07-08 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools 24 inches deep or greater (IRC R105.2 exempts pools under 24 inches)
  • Pool barrier/fence required for all pools per adopted IRC/ISPSC

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted to the Community Development Department
  • RequiredPool PlansPool dimensions, depth, equipment location, and structural details
  • RequiredBarrier PlanPool fence/barrier details meeting ISPSC/IRC Chapter 31/41 requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per NEC Article 680

Fee schedule

Fee typeAmountNotes
Swimming Pools — per square foot (All Occupancies)$0.40 per sq ftUintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Building Permit Fees table.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule, Ord. 08-06-2025 O1.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uintah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/uintah-county/unincorporated-uintah/as-of/2026-07-08/

Snapshot date: 2026-07-08

Commit: e53960f

Reproducible from PermitBase’s version-controlled dataset, commit e53960f.