Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-16.

Unincorporated Uintah County building permits

Verified

Unincorporated Uintah County, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Uintah County's own Building Code page (uintah.gov, live-checked 2026-07-16) is UNCHANGED and still states '2021 International Building Codes Effective July 1, 2023' — the county page has not been updated for either the 2021→2023 language it already had wrong stylistically or the 2024 statewide edition now in force; the statute governs.2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition.Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Uintah County's own Building Code page, added here per statute.2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition previously listed here.2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here.2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition previously listed here. Uintah County's FAQ page ('Do I need a permit for my building? It's portable on a skid?' article, live-checked 2026-07-16) is UNCHANGED and still cites 'Chapter 14 of the 2018 International Existing Building Code (IEBC)' and '2018 International Building Code (IBC)' / '2015 International Residential Code (IRC)' / 'IRC 2015 or IBC 2018' for relocated/moved structures — this is now a much larger lag (2015/2018 editions vs. the current 2024/2021 statewide editions) than previously flagged; the FAQ page's separate 'When are building permits required' article also still cites 'IBC 2015 & IRC 2015' verbatim. The statute governs; Uintah County's FAQ page has not been updated to reflect any statewide code cycle since at least 2015/2018.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition previously listed here.2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition. Uintah County's Building Code Information page (live-checked 2026-07-16) is UNCHANGED and still lists '2020 National Electrical Code (NEC) Effective July 1, 2021' — that page remains not updated; the statewide 2023 NEC is the legally in-force edition per the statute.NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification — the flip anticipated by this file's prior 'Effective July 1, 2026' note has now occurred and is confirmed live. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Uintah County's own Building Code page and FAQ page were both live-checked 2026-07-16 and remain unchanged/stale exactly as previously found (in the FAQ's case, considerably staler than previously documented — see the IEBC entry above) — the statute is cited directly as governing throughout, per this file's established recovery-avenue policy.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family dwelling construction, additions, remodels, and manufactured homes on private lots in unincorporated Uintah County. The Uintah County Community Development Building Division issues and reviews all building permits for land outside incorporated cities (Vernal, Naples). Fee is calculated per square foot by occupancy classification under the county's adopted fee schedule.

Verified 2026-07-08 · Source

Requirements

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Remodels and structural alterations
  • Manufactured home installation on a private lot (requires a permanent foundation system per County Code 18.03 of the Administrative Manual)
  • Property must be a legally buildable lot (split through the county's subdivision process)

Required documents

  • RequiredResidential Building Permit ApplicationCompleted application form (SFD Permit Application Packet 2025) submitted to the Community Development Department, 152 E 100 N, Vernal, UT, or online
  • RequiredProof of OwnershipMost current tax statement, deed, or property information sheet
  • RequiredSite PlanNorth indicator, lot shape/dimensions, footprint of all structures (existing and proposed), setbacks from all property lines, easements, canals/ditches/drainages, driveway location, wells/septic systems, and FEMA floodplain
  • RequiredTwo Complete Sets of Building PlansLegible, to-scale sets (minimum 11x17), designed to the currently adopted IRC — floor plans, elevations, cross sections, framing/footing/foundation details, electrical/plumbing/mechanical details per the county's Building Plans Checklist
  • RequiredWater and/or Sewer Availability LetterLetter from the local water district confirming water/sewer availability and stating the distance to the nearest fire hydrant
  • OptionalFire Hydrant Approval LetterRequired from the Fire Marshal if no hydrant is within 600 feet of the proposed structure
  • OptionalSeptic Construction Permit / Well Water ApprovalLetter from the Tri-County Health Department when a septic system and/or private well is planned
  • OptionalRoad Encroachment PermitFrom the Uintah County Road Department, required for any work in the county right-of-way (driveways, utility connections) unless the lot has curb and gutter
  • OptionalOwner/Builder CertificationNotarized form required if the property owner will act as their own contractor
  • RequiredAgreement for Electrical MeterSigned agreement governing temporary construction power and conditions for setting a permanent meter

Fee schedule

Fee typeAmountNotes
Residential (R-3 and R-4 occupancy) — per square foot$0.70 per sq ftUintah County Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025, effective ~8/27/2025), Community Development Fee Schedule — Building Permit Fees table, 'R-3 and R-4 / Residential' occupancy row.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — Permit Fee by Activity & Flat Fee table.
Unfinished Basement$0.40 per sq ftUintah County Fee Schedule, Ord. 08-06-2025 O1.
Porches, Decks and Other Un-Walled Structures$0.25 per sq ftUintah County Fee Schedule, Ord. 08-06-2025 O1.
Manufactured Home (factory-built portion only, no basement or garage)$0.40 per sq ftUintah County Fee Schedule, Ord. 08-06-2025 O1.
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule, Ord. 08-06-2025 O1 — Review of Plans table. A portion is due at time of application per the Administrative Manual § 17.03; nonrefundable once plan check has commenced.
Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 (Inspection/Re-Inspection fee line item); consistent with Administrative Manual § 17.04, which allows a $50 re-inspect fee after the 2nd inspection of the same type, and a $50 fee for late-cancelled or not-ready inspections.

Electrical Permit

Verified

Required for residential electrical service upgrades/replacements, temporary power pedestals, and agricultural electrical service in unincorporated Uintah County. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the county's Permit Fee by Activity & Flat Fee table (Ord. 08-06-2025 O1) does not publish an EV-specific line item (checked 2026-07-19).

Verified 2026-07-08 · Source

Requirements

  • Residential electrical service upgrade or replacement
  • Temporary construction power pedestal installation
  • Agricultural electrical service
  • Any new electrical work in an otherwise-exempt agricultural building

Required documents

  • RequiredElectrical, Mechanical and Plumbing Building Permit ApplicationCompleted application listing the electrical contractor and license number, submitted to the Community Development Department
  • OptionalElectrical Single-Line Diagram / PlanPanel location, meter size and location, circuit layout — required per the county's plan review checklist for new construction and service upgrades

Fee schedule

Fee typeAmountNotes
Residential Electrical Service Upgrade or Replacement$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table.
Temporary Power Pedestals$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Agricultural Electrical Service$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Commercial/Utility Equipment and Commercial Electrical Service$200.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

EV Charger / EVSE Permit

Verified

Uintah County does not publish a distinct EV charger / EVSE permit type or fee line item. Directly read the complete 'Permit Fee by Activity & Flat Fee' table of the county's official Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025, Book 1921 Page 869) on 2026-07-20 — it lists 26 specific activity/flat-fee line items (residential electrical service upgrade or replacement, temporary power pedestals, agricultural electrical service, commercial/utility equipment and commercial electrical service, solar, wind/radio towers, cell towers, etc.) and contains no 'EV,' 'electric vehicle,' or 'charging station' line item anywhere in the table. EV charger / EVSE installation is therefore billed as ordinary electrical work under the same Electrical Permit that governs residential electrical service upgrades and replacements.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Uintah County — falls under the county's general Electrical Permit (residential electrical service upgrade/replacement, or commercial/utility electrical service for non-residential installations)
  • Completed Electrical, Mechanical and Plumbing Building Permit Application listing the electrical contractor and license number
  • Compliance with the 2023 NEC, which remains current statewide per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredElectrical, Mechanical and Plumbing Building Permit ApplicationCompleted application listing the electrical contractor and license number, submitted to the Community Development Department; no distinct EV-charger application form or checkbox exists.
  • OptionalElectrical Single-Line Diagram / PlanPanel location, meter size and location, circuit layout for the charger installation.

Fee schedule

Fee typeAmountNotes
Residential Electrical Service Upgrade or Replacement (applies to residential EV charger/EVSE)$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025, Book 1921 Page 869) — Permit Fee by Activity & Flat Fee table. No distinct EV-charger line item exists in this table (confirmed by directly reading the complete table on 2026-07-20), so a residential EV charger installation is billed under this same flat-fee electrical line item, consistent with this file's existing electrical-permit entry.
Commercial/Utility Equipment and Commercial Electrical Service (applies to commercial EV charger/EVSE)$200.00Uintah County Fee Schedule, Ord. 08-06-2025 O1, Book 1921 Page 869 — same table; applies to a commercial-property EV charger installation.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Mechanical / HVAC Permit

Verified

Required for replacement of furnaces, air conditioners, water heaters, and boilers, and for LPG-to-natural-gas conversions in unincorporated Uintah County.

Verified 2026-07-08 · Source

Requirements

  • Furnace, AC unit, water heater, or boiler replacement
  • LPG conversion to natural gas
  • New HVAC system installation (part of new construction fee)
  • Adding mechanical systems to a building that previously had none

Required documents

  • RequiredElectrical, Mechanical and Plumbing Building Permit ApplicationCompleted application listing the mechanical contractor and license number
  • OptionalEquipment SpecificationsManufacturer data for furnace, AC, boiler, or water heater

Fee schedule

Fee typeAmountNotes
Replacement of AC Unit, Furnace, Water Heater, Boiler, etc.$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table.
LPG Conversion to Natural Gas$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Adding Plumbing, Mechanical or Electrical to a Building Without Such Facilities$150 (0–1,499 sq ft); $300 (1,500–4,999 sq ft); $400 (5,000 sq ft and over)Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Solar Panel Permit

Verified

Required for installation of solar photovoltaic systems and residential wind/radio towers in unincorporated Uintah County. Fee tier depends on system size.

Verified 2026-07-08 · Source

Requirements

  • Rooftop or ground-mounted solar PV installation
  • Generator power installations
  • Residential wind and/or radio tower installation

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted to the Community Development Department
  • RequiredElectrical Single-Line DiagramSystem wiring from panels/array to inverter to main panel and utility meter
  • RequiredEquipment SpecificationsManufacturer specifications for panels, racking, and inverter

Fee schedule

Fee typeAmountNotes
Solar (less than 10kW) and Generator Power Installations$200.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — does not include accessory structure.
Solar Installations 10kW and Larger$400.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — does not include accessory structure.
Residential Wind and/or Radio Tower$200.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Demolition Permit

Verified

Required for demolition of any structure in unincorporated Uintah County. Includes required Fire Marshal and Health Department sign-off, plus a state Division of Air Quality notification.

Verified 2026-07-08 · Source

Requirements

  • Complete demolition of any structure
  • Asbestos inspection prior to demolition (hired-contractor demolitions; owner-performed demolition of a private home is exempt per Utah House Bill 285)
  • Division of Air Quality notification at least two weeks prior to demolition (required even if no asbestos is found)
  • Fire Marshal and Tri-County Health Department sign-off on the Demolition Application

Required documents

  • RequiredDemolition ApplicationCompleted form submitted to the Community Development Department with Fire Marshal and Health Department approval signatures
  • RequiredDivision of Air Quality Notification / ApprovalCopy of the state notification form (asbestos and demolition notification forms available at airquality.utah.gov) submitted at least two weeks before demolition; approx. $50 state fee
  • OptionalAsbestos InspectionRequired if demolition is performed by a hired contractor; private homeowners performing their own demolition are exempt per HB 285

Fee schedule

Fee typeAmountNotes
Demolition of a Structure$0.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table lists 'Demolition of a Structure' at $0.00. This supersedes the older $100 flat fee shown on the county's standalone Demolition Application form, which predates this fee schedule ordinance.
State Division of Air Quality Notification FeeApprox. $50.00 (paid to the State, not the county)Uintah County Demolition Application — Step 3 instructions.

Retaining Wall Permit

Verified

Required for retaining walls over 4 feet in height (measured from bottom of footing to top of wall) or any wall supporting a surcharge, in unincorporated Uintah County. Walls at or under 4 feet that do not support a surcharge are exempt per the IRC.

Verified 2026-07-08 · Source

Requirements

  • Retaining walls over 4 feet in total height (bottom of footing to top of wall)
  • Any retaining wall supporting a surcharge, regardless of height
  • Walls not exceeding 4 feet in height and not supporting a surcharge are exempt from a permit under IRC R105.2 (as reprinted in the county's Building Permit FAQ)

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted to the Community Development Department
  • RequiredSite PlanWall location relative to property lines, structures, and utilities
  • OptionalEngineered Wall PlansRequired for walls supporting a surcharge or where engineering is otherwise warranted

Fee schedule

Fee typeAmountNotes
Retaining Walls Over 4 Feet$50.00Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Permit Fee by Activity & Flat Fee table.
Inspection/Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation in unincorporated Uintah County. Prefabricated pools less than 24 inches deep are exempt under IRC R105.2.

Verified 2026-07-08 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools 24 inches deep or greater (IRC R105.2 exempts pools under 24 inches)
  • Pool barrier/fence required for all pools per adopted IRC/ISPSC

Required documents

  • RequiredBuilding Permit ApplicationCompleted application submitted to the Community Development Department
  • RequiredPool PlansPool dimensions, depth, equipment location, and structural details
  • RequiredBarrier PlanPool fence/barrier details meeting ISPSC/IRC Chapter 31/41 requirements
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details per NEC Article 680

Fee schedule

Fee typeAmountNotes
Swimming Pools — per square foot (All Occupancies)$0.40 per sq ftUintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025) — Building Permit Fees table.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1.
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule, Ord. 08-06-2025 O1.

Commercial Building Permit

Verified

Required for new commercial construction under an IBC occupancy classification in unincorporated Uintah County. Uintah County's Building Permit Fees table (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025) assesses fees per square foot by IBC occupancy classification rather than a single flat commercial rate: Business (B) is billed at $1.00/sq ft, Mercantile (M) at $0.75/sq ft, Assembly (A-1 through A-5) at $1.00/sq ft, Educational (E) at $1.00/sq ft, Factory (F-1/F-2) at $0.60/sq ft, Hazardous (H-1 through H-5) and Institutional (I-1 through I-4) at $1.25/sq ft, Storage (S-1/S-2) at $0.55/sq ft, and Utility (U) at $0.40/sq ft — each subject to a $50 minimum building permit fee and a plan check fee of up to 65% of the building permit fee.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction under an IBC occupancy classification (Business, Mercantile, Assembly, Educational, Factory, Hazardous, Institutional, or Storage)
  • Two complete, legible, to-scale sets of building plans (minimum 11x17), designed to the currently adopted IBC (2024 IBC per Utah Code § 15A-2-103(1)(a), effective 7/1/2026)
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • Site Plan showing north indicator, lot dimensions, footprint of all structures, setbacks, easements, driveway location, and FEMA floodplain status
  • Fire hydrant location letter from the water provider; if no hydrant is within 600 feet, an approval letter from the Fire Marshal is required
  • Road Encroachment Permit from the County Road Department, required for any work in the county right-of-way unless the lot already has curb and gutter

Required documents

  • RequiredCommercial Building Permit ApplicationSubmitted to the Community Development Department, 152 E 100 N, Vernal, UT, or online.
  • RequiredProof of OwnershipMost current tax statement, deed, or property information sheet.
  • RequiredSite PlanNorth indicator, lot shape/dimensions, footprint of all structures, setbacks, easements, driveway location, and FEMA floodplain status.
  • RequiredTwo Complete Sets of Building Plans, Stamped by a Utah Licensed Architect or EngineerLegible, to-scale sets (minimum 11x17), designed to the currently adopted IBC — floor plans, elevations, cross sections, framing/footing/foundation details, electrical/plumbing/mechanical details, per the county's Building Plans Checklist.
  • RequiredWater and/or Sewer Availability LetterLetter from the local water district confirming water/sewer availability and stating the distance to the nearest fire hydrant.
  • OptionalFire Hydrant Approval LetterRequired from the Fire Marshal if no hydrant is within 600 feet of the proposed structure.
  • OptionalRoad Encroachment PermitFrom the Uintah County Road Department, required for any work in the county right-of-way unless the lot has curb and gutter.

Fee schedule

Fee typeAmountNotes
Business (B) Occupancy — per square foot$1.00 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'B / Business / $1.00' row.
Mercantile (M) Occupancy — per square foot$0.75 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'M / Mercantile / $0.75' row.
Assembly (A-1 Through A-5) Occupancy — per square foot$1.00 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'A-1 Through A-5 / Assembly / $1.00' row.
Educational (E) Occupancy — per square foot$1.00 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'E / Educational / $1.00' row.
Factory (F-1 and F-2) Occupancy — per square foot$0.60 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'F-1 and F-2 / Factory / $0.60' row.
Hazardous (H-1 Through H-5) / Institutional (I-1 Through I-4) Occupancy — per square foot$1.25 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type rows for H-1 Through H-5 (Hazardous) and I-1 Through I-4 (Institutional), both $1.25.
Storage (S-1 and S-2) Occupancy — per square foot$0.55 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'S-1 and S-2 / Storage / $0.55' row.
Utility (U) Occupancy — per square foot$0.40 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'U / Utility / $0.40' row.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Permit Fee by Activity & Flat Fee' table.
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Review of Plans' table: 'Plan check fee — Up to 65% of the building permit fee.'
Commercial Fire Review (New Construction)$90.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Fire District Fees,' Commercial Fire Review/Inspection table: 'New Construction Fire Review — $90.00.'
Commercial Fire Inspection (New Construction)$80.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Fire District Fees,' Commercial Fire Review/Inspection table: 'New Construction Fire Inspection — $80.00.'
Fire Sprinkler System Review/Inspection$120.00 (1-100 heads); $170.00 (101-200 heads); $220.00 (201-300 heads); $270.00 (301+ heads); Fire Sprinkler System Inspection $95.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Fire Sprinkler System Review/Inspection' table.
Re-Inspection Fee$50.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Inspection/Re-Inspection fee line item.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement / tenant finish work inside an existing commercial building in unincorporated Uintah County — the interior build-out that follows a 'Shell Only' permit, or a remodel/change of use of existing commercial space. Uintah County's Building Permit Fees table separately prices a 'Shell Only (prior to tenant build-out)' rate of $0.35/sq ft for all occupancies, a general 'Remodeling' rate of $0.40/sq ft (minimum fee $200) for all occupancies, a 'Change in Use of Occupancy' rate of $0.40/sq ft, and — where plumbing, mechanical, or electrical is being added to a building that previously lacked those systems — a flat tiered fee ($150 for 0-1,499 sq ft, $300 for 1,500-4,999 sq ft, $400 for 5,000+ sq ft).

Verified 2026-07-19 · Source

Requirements

  • Tenant improvement / tenant finish build-out of previously shelled commercial space, remodel of existing commercial space, or change of use/occupancy
  • Two complete, legible, to-scale sets of building plans (minimum 11x17), designed to the currently adopted IBC
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • For scope adding plumbing, mechanical, or electrical to space that previously lacked such facilities: plans showing the new systems

Required documents

  • RequiredCommercial Tenant Improvement / Remodel Building Permit ApplicationSubmitted to the Community Development Department, 152 E 100 N, Vernal, UT, or online.
  • RequiredTwo Complete Sets of Building Plans, Stamped by a Utah Licensed Architect or Engineer (where scope requires)Floor plans and structural/electrical/plumbing/mechanical detail for the improved space, per the county's Building Plans Checklist.
  • RequiredProof of Ownership or Tenant AuthorizationMost current tax statement, deed, or property information sheet, or written authorization from the property owner for a tenant-initiated permit.

Fee schedule

Fee typeAmountNotes
Shell Only (prior to tenant build-out), All Occupancies — per square foot$0.35 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'All Occupancies / Shell Only (prior to tenant build-out) / $0.35' row.
Remodeling, All Occupancies — per square foot$0.40 per sq ft (Minimum fee $200)Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'All Occupancies / Remodeling / $0.40 (Min. fee $200)' row.
Change in Use of Occupancy, All Occupancies — per square foot$0.40 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'All Occupancies / Change in Use of Occupancy / $0.40' row.
Finishing or Unfinished Basements, All OccupanciesDifference between multipliersUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). Occupancy Type 'All Occupancies / Finishing or Unfinished Basements / Difference between multipliers' row.
Adding Plumbing, Mechanical or Electrical to a Building Without Such Facilities$150 (0-1,499 sq ft); $300 (1,500-4,999 sq ft); $400 (5,000 sq ft and over)Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Permit Fee by Activity & Flat Fee' table.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16).
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Review of Plans' table.
Remodel Fire Review$70.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Fire District Fees,' Commercial Fire Review/Inspection table: 'Remodel Fire Review — $70.00.'
Remodel Fire Inspection$60.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16). 'Fire District Fees,' Commercial Fire Review/Inspection table: 'Remodel Fire Inspection — $60.00.'
Re-Inspection Fee$50.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, verified directly against the rendered PDF page images (pages 4-5 of 16).

Sign Permit

Verified

Required for erecting, raising, moving, reconstructing, enlarging, altering, placing, or maintaining a sign in unincorporated Uintah County, governed by Uintah County Code Chapter 17.29 SIGNS (Ord. No. 12-18-2017 O1, as amended by Ord. No. 10-28-2019 O1 and Ord. No. 12-20-2021 O1). Applications are made to the Community Development Department "upon the standard building permit form or permitted use application form used by Uintah County" (Section 17.29.060(B)) -- there is no separate freestanding sign-permit application form, and no distinct sign-permit dollar fee is published separately from the county's general building-permit fee schedule.

Verified 2026-07-20 · Source

Requirements

  • Signs to conform: unlawful to erect, raise, move, reconstruct, enlarge, alter, place or maintain a sign except in accordance with Chapter 17.29 (Section 17.29.020(A))
  • Application made to the Community Development Department upon the standard building permit form or permitted use application form (Section 17.29.060(B)); a conditional use permit is required instead if the sign requires one under the chapter
  • All signs must be constructed in accordance with all applicable building and electrical codes (Section 17.29.050(A))
  • Site plan and design approval by the zoning administrator or designee required prior to placement (Section 17.29.050(B))
  • Sign application must include a plot plan showing the sign's relationship to buildings, property lines, setbacks from public rights-of-way, intersections, easements and driveways; two dimensioned scaled drawings (height, color, square footage, landscaping, illumination type, street-view appearance); and construction details including electrical plan, foundation scheme, and sign value (Section 17.29.050(C))
  • Temporary signs (business opening/relocation, special promotions, inventory liquidation) require a temporary sign permit and are capped at 60 days (Section 17.29.030)
  • No sign may exceed 25 feet in height except as detailed by the zone-specific table in Section 17.29.070
  • Planned centers and multi-tenant buildings must have an approved sign theme before any sign permits will be issued for tenants (Section 17.29.050(D))
  • Off-premises signs are a conditional use, not a permitted use, under Section 17.29.070

Required documents

  • RequiredStandard Building Permit Form or Permitted Use ApplicationUintah County does not publish a distinct sign-permit application form -- per Code Section 17.29.060(B), sign applications are made 'upon the standard building permit form or permitted use application form used by Uintah County,' submitted to the Community Development Department.
  • RequiredPlot PlanShows the sign's relationship to buildings, property lines, setback from public rights-of-way, intersections, easements, and driveways (Section 17.29.050(C)(1)).
  • RequiredScaled Sign DrawingsTwo accurately dimensioned, scaled drawings showing height, color, square foot dimensions, landscaping, sign composition, type of illumination, and how the sign will appear from the street (Section 17.29.050(C)(2)).
  • RequiredConstruction DetailsElectrical plan, foundation scheme, and declared value of the sign (Section 17.29.050(C)(3)).

Fee schedule

Fee typeAmountNotes

Fire Sprinkler & Fire Alarm Permit

Verified

Required for installation of automatic fire sprinkler systems, special automatic fire-extinguishing systems (e.g., commercial kitchen hood suppression), and fire alarm systems in unincorporated Uintah County. Unlike a jurisdiction with no local fire-plan-review process, Uintah County's own Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025) publishes a dedicated 'Fire District Fees' section with separate review/inspection fee tables for fire sprinkler systems (tiered by sprinkler head count), special automatic fire-extinguishing systems, and fire alarm systems — reviewed and inspected by the county alongside the associated building, commercial, or tenant-improvement permit rather than under a standalone fire-permit application. No distinct standalone fire-sprinkler or fire-alarm application form separate from the underlying building/commercial permit application was identified.

Verified 2026-07-22 · Source

Requirements

  • Installation of an automatic fire sprinkler system in any occupancy requiring fire suppression under the currently adopted IBC (2024 IBC per Utah Code § 15A-2-103(1)(a))
  • Installation of a special automatic fire-extinguishing system (e.g., commercial kitchen hood suppression)
  • Installation of a fire alarm/detection and notification system
  • Submitted alongside (not in place of) the associated new-construction, remodel, or tenant-improvement building permit for the same project

Required documents

  • RequiredFire Sprinkler / Fire Alarm System Shop DrawingsSystem-specific plans (head/device layout and hydraulic calculations for sprinkler systems, riser and zone diagrams for alarm systems) submitted to the Community Development Department for fire review.
  • RequiredAssociated Building Permit ApplicationThe underlying Commercial Building Permit, Tenant Improvement, or Residential Building Permit application for the same project — Uintah County does not publish a standalone fire-sprinkler or fire-alarm permit application form separate from this.

Fee schedule

Fee typeAmountNotes
Fire Sprinkler System Review — 1 to 100 Heads$120.00Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (Entry 2025004950, Book 1921, Page 869, enacted 8/12/2025) — 'Fire District Fees,' 'Fire Sprinkler System Review/Inspection' table, verified directly against the rendered PDF page image (page 5 of 16) on 2026-07-22.
Fire Sprinkler System Review — 101 to 200 Heads$170.00Same source, same table, '101 to 200 Heads' row, verified 2026-07-22.
Fire Sprinkler System Review — 201 to 300 Heads$220.00Same source, same table, '201 to 300 Heads' row, verified 2026-07-22.
Fire Sprinkler System Review — 301 Heads and Above$270.00Same source, same table, '301 and Above' row, verified 2026-07-22.
Fire Sprinkler System Inspection (flat, any head count)$95.00Same source, same table, 'Fire Sprinkler System Inspection' row, verified 2026-07-22.
Special Automatic Fire-Extinguishing System Review$120.00Uintah County Fee Schedule, same ordinance — 'Fire District Fees,' 'Special Automatic Fire Extinguishing System' table (Book 1921, Pages 869-870), 'Fire Review per System' row, verified directly against the rendered PDF page images (pages 5-6 of 16) on 2026-07-22. Covers non-water suppression systems such as commercial kitchen hood suppression.
Special Automatic Fire-Extinguishing System Inspection$95.00Same source, same table, 'Fire Inspection per System' row, verified 2026-07-22.
Fire Alarm System Review$120.00Uintah County Fee Schedule, same ordinance — 'Fire District Fees,' 'Fire Alarm' table (Book 1921, Page 870), 'Fire Review per System' row, verified directly against the rendered PDF page image (page 6 of 16) on 2026-07-22.
Fire Alarm System Inspection$95.00Same source, same table, 'Fire Inspection per System' row, verified 2026-07-22.
Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — general Inspection/Re-Inspection fee line item (Permit Fee by Activity & Flat Fee table, page 5 of 16); applies if a fire system inspection is not ready or fails.

Change of Use / Certificate of Occupancy Permit

Verified

Required for a change in use or occupancy classification of an existing building in unincorporated Uintah County, and covers the Certificate of Occupancy sign-off that closes out any building, commercial, tenant-improvement, or change-of-use permit before the space may be occupied. Uintah County's Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025) prices two distinct change-of-use scenarios: (1) 'Change in Use of Occupancy' for a previously-approved building, billed at a flat $0.40 per square foot across all occupancies (Building Permit Fees table); and (2) 'Change of use for a non-approved (unconfirmed) building,' billed 'as per new occupancy classification' — i.e., at the applicable per-square-foot rate for the new occupancy type from the same table (Permit Fee by Activity & Flat Fee table), ranging $0.40-$1.25/sq ft depending on classification. No standalone Certificate of Occupancy application fee is separately published; a CO is issued as part of the final inspection sign-off on the underlying permit.

Verified 2026-07-22 · Source

Requirements

  • Change in use or occupancy classification of an existing, previously-approved commercial or other non-residential building — billed at a flat $0.40/sq ft across all occupancies
  • Change of use for a building whose existing use was never officially approved or confirmed by the county — billed 'as per new occupancy classification' at the applicable per-square-foot rate for the new use
  • Compliance review for the new use under the currently adopted IBC (2024 IBC per Utah Code § 15A-2-103(1)(a)), including egress, occupant load, and fire separation for the new occupancy
  • Final inspection and Certificate of Occupancy issuance before the new use may commence

Required documents

  • RequiredCommercial Building Permit Application or Tenant Improvement/Remodel ApplicationUintah County does not publish a standalone 'change of use' application form; a change-of-use project is submitted on the same Community Development building permit application used for other commercial/tenant-improvement work.
  • RequiredFloor Plan Showing Existing and Proposed UseLayout sufficient to evaluate the new occupancy classification's egress, occupant load, and fire/life-safety requirements against the currently adopted IBC.
  • RequiredProof of Ownership or Tenant AuthorizationMost current tax statement, deed, or property information sheet, or written authorization from the property owner for a tenant-initiated change of use.

Fee schedule

Fee typeAmountNotes
Change in Use of Occupancy (Previously-Approved Building), All Occupancies — per square foot$0.40 per sq ftUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (Entry 2025004950, Book 1921, Page 868, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees table, 'All Occupancies / Change in Use of Occupancy / $0.40' row, verified directly against the rendered PDF page image (page 4 of 16) on 2026-07-22.
Change of Use for a Non-Approved (Unconfirmed) BuildingAs per new occupancy classification (i.e., the applicable Building Permit Fees per-sq-ft rate for the new use, $0.40-$1.25/sq ft depending on classification)Uintah County Fee Schedule, same ordinance (Entry 2025004950, Book 1921, Page 869) — 'Permit Fee by Activity & Flat Fee' table, 'Change of use for a non-approved (unconfirmed) building / As per new occupancy classification' row, verified directly against the rendered PDF page image (page 5 of 16) on 2026-07-22. Applies when the building's existing use was never officially permitted/confirmed by the county, as distinct from the flat $0.40/sq ft rate for a previously-approved building changing use.
Minimum Building Permit Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — Permit Fee by Activity & Flat Fee table.
Plan Check FeeUp to 65% of the building permit feeUintah County Fee Schedule, Ord. 08-06-2025 O1 — Review of Plans table.
Re-Inspection Fee$50.00Uintah County Fee Schedule, Ord. 08-06-2025 O1 — Inspection/Re-Inspection fee line item.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uintah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)View current record →All versions →

Permalink: /utah/uintah-county/unincorporated-uintah/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.