Miscellaneous Permit (Roof, Gas Addition, Demolition, etc.) in Vernal, Utah

Covers permits that are not classified as strictly Residential or Commercial in Vernal City — examples given by the City include roofing, electrical upgrades, and gas additions. Demolition has its own dedicated application. These are charged under the same valuation-based Building Permit Fee table unless a specific flat maintenance/repair fee applies.

Verified 2026-07-08 · Source

When you need this permit

  • Project confirmed within Vernal City jurisdiction; zone identification via the Interactive Zoning Map
  • Nature of work specific to the permit type (e.g., re-roof, gas line addition, demolition)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation-based (Vernal City table)Vernal City's Miscellaneous Permits page (vernal.gov/204/Miscellaneous-Permits) does not publish a separate flat fee table for roof/gas-addition-type miscellaneous permits; these fall under the general valuation-based Building Permit Fee table (vernal.gov/DocumentCenter/View/882/Building-Permit-Fees) unless covered by a specific Maintenance/Repair line item (see the standalone plumbing/mechanical/electrical permit entries in this dataset for those flat fees).
$1–$500: $49.50 flat. $501–$2,000: $49.50 for the first $500 + $2.75 per additional $100 (or fraction). $2,001–$25,000: $91.00 for the first $2,000 + $12.75 per additional $1,000 (or fraction). $25,001–$50,000: $352.00 for the first $25,000 + $9.25 per additional $1,000. $50,001–$100,000: $580.00 for the first $50,000 + $6.75 per additional $1,000. $100,001–$500,000: $895.00 for the first $100,000 + $5.50 per additional $1,000. $500,001–$1,000,000: $2,855.00 for the first $500,000 + $4.50 per additional $1,000. $1,000,001 and up: $4,995.00 for the first $1,000,000 + $3.00 per additional $1,000.

Review timeline

Plan reviewVernal’s published plan-review target
7–7 business days

How long did your Miscellaneous Permit (Roof, Gas Addition, Demolition, etc.) permit actually take in Vernal?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Applicable Inspections

    Miscellaneous permits are typically specific in nature; inspections are scheduled at least 24 hours in advance by calling (435) 789-2271. The City directs applicants with completion-process questions to contact Vernal City directly, per the Miscellaneous Permits page.

See the full Vernal inspection guide — scheduling & re-inspection fees →

Tips

  • Examples of Miscellaneous Permits given by Vernal City include roofing, electrical upgrades, and gas additions.
  • Demolition permits use a dedicated Demolition Permit Application, distinct from the general online permit application.
  • Miscellaneous permits are typically specific in nature — the City advises contacting Vernal City directly with completion-process questions rather than relying on a generic checklist.

Frequently asked questions

Vernal requires a miscellaneous permit (roof, gas addition, demolition, etc.) for: Project confirmed within Vernal City jurisdiction; zone identification via the Interactive Zoning Map; Nature of work specific to the permit type (e.g., re-roof, gas line addition, demolition). If your project isn't listed, confirm with Vernal City Building Division (Planning & Development Department) at (435) 789-2271 before starting work.

In Vernal, the published Building Permit Fee — valuation-based (Vernal City table) is: $1–$500: $49.50 flat. $501–$2,000: $49.50 for the first $500 + $2.75 per additional $100 (or fraction). $2,001–$25,000: $91.00 for the first $2,000 + $12.75 per additional $1,000 (or fraction). $25,001–$50,000: $352.00 for the first $25,000 + $9.25 per additional $1,000. $50,001–$100,000: $580.00 for the first $50,000 + $6.75 per additional $1,000. $100,001–$500,000: $895.00 for the first $100,000 + $5.50 per additional $1,000. $500,001–$1,000,000: $2,855.00 for the first $500,000 + $4.50 per additional $1,000. $1,000,001 and up: $4,995.00 for the first $1,000,000 + $3.00 per additional $1,000.. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per Vernal City's Miscellaneous Permits page, complete permit applications are typically reviewed within a week of submittal.

You'll need: Online Permit Application. Depending on your project, Vernal may also ask for: Demolition Permit Application. See the required-documents checklist on this page for details on each.

Vernal requires 1 inspection(s) for a miscellaneous permit (roof, gas addition, demolition, etc.), in order: Applicable Inspections. Schedule each through Vernal City Building Division (Planning & Development Department) ((435) 789-2271).

Apply through Vernal City Building Division (Planning & Development Department) at 374 East Main Street, Vernal, UT 84078. Phone: (435) 789-2271. Official information: https://www.vernal.gov/191/Building.

Vernal, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Vernal's own Building Division page (live-checked 2026-07-16) still does not list specific code edition years, describing only 'the Building Code' generically (electrical, plumbing, mechanical systems; energy conservation; fire safety; accessibility; structural requirements; wind resistance). No Vernal-specific ordinance publicly enumerating edition years was located — this entry follows the statewide baseline used consistently elsewhere in this corpus rather than asserting a city-specific adoption date that could not be independently verified.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition. Vernal's Residential Building Permits page confirms 'The International Residential Code is used for the minimum design standards for construction' without specifying an edition year.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Vernal's own Building Division pages, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Vernal's own Building Division pages, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition (also consistent with Utah State Fire Marshal adoption).; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Vernal's own Building Division pages, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Vernal's own Building Division pages, added here per statute since the City's own materials omit it.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Vernal's Building Division page (vernal.gov/191/Building) was live-checked 2026-07-16 and still lists no specific code edition years at all — so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout, unchanged from this file's prior no-lag finding.. Local amendments apply — see the Vernal overview page for the full list.

Vernal City's Miscellaneous Permits page lists permits that are not Residential or Commercial in nature, giving roof, electrical upgrades, and gas addition as examples. Demolition permits have their own dedicated application.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vernal building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.