This is PermitBase’s published record for Alpine as of 2026-07-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Alpine building permits

Verified

Alpine, Utah — as published 2026-07-16.

Verified 2026-07-08 · Source

Codes adopted

2021 International Residential Code (IRC) — REMAINS CURRENT, Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 amendment; per Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025): 'Structural design criteria must conform to the 2021 IRC.'2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition Alpine City's official Building Permit Instructions (New Home Form #2, revised 4/9/2025) still cited as of live-check 2026-07-16: 'I understand that it is my responsibility to comply with Alpine City Zoning Ordinances and the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City.'2021 IRC Appendix AL (Building Permit Fees) as amended by Alpine City — Alpine's Consolidated Fee Schedule (effective November 11, 2025), Appendix B, is expressly titled 'Building Permit Fees (2021 IRC Appendix AL, as amended)' and cites https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees. This is a local fee-table appendix reference, not the § 15A-2-103 construction-code edition, and is unaffected by the 7/1/2026 code-cycle update.Utah statewide baseline construction code editions per Utah Code § 15A-2-103, effective 7/1/2026 (superseded 1/1/2027): 2024 IPC (§(1)(d)), 2024 IMC (§(1)(e)), 2024 IFGC (§(1)(f)), 2024 IECC as a single unsplit statewide edition (§(1)(h)), 2024 IEBC (§(1)(i)), and the residential provisions of the 2024 ISPSC (§(1)(n)) — none separately itemized in Alpine's own published materials (Consolidated Fee Schedule, Building Permit Instructions, Building Department page); added here per statute since Alpine's own documents omit them. The 2023 NEC (§(1)(g)) also applies statewide but is likewise not separately restated by Alpine — unchanged by the 7/1/2026 amendment.NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Alpine City's official Building Permit Instructions (New Home Form #2) — the sole cited source for Alpine's code editions — was live-checked 2026-07-16 by re-fetching the PDF directly and remains dated 'Revised 4/9/2025' with no update: it still states 'Structural design criteria must conform to the 2021 IRC' (correct, unchanged) and 'the I.B.C. 2021 code (including Appendix C and J) as adopted by Alpine City' (STALE — Alpine has not published an updated form reflecting the 2024 IBC as of this date). No newer Alpine-specific building-code publication was found on alpineut.gov. The Utah Code § 15A-2-103 citation added to the sources array below points to the current in-force version link.

Permit types & fees

Residential Building Permit (New Home)

Verified

Required for new single-family residential construction in Alpine City, regulated by the adopted 2021 IRC. Alpine uses a valuation-based fee structure per its own Appendix A (2008 ICC square-foot construction cost table) and Appendix B (2021 IRC Appendix AL fee schedule, as amended), plus a flat $1,000 application fee credited against the plan-check fee.

Verified 2026-07-08 · Source

Requirements

  • New single-family residential construction
  • Structural design criteria must conform to the 2021 IRC, per Alpine's official Building Permit Instructions (New Home Form #2)
  • Compliance with Alpine City Zoning Ordinances and the 2021 IBC (including Appendix C and J) as adopted by Alpine City — NOTE: this is Alpine's own currently-published (as of 2026-07-16) form language; the statewide-governing edition is now the 2024 IBC per Utah Code § 15A-2-103(1)(a), effective 7/1/2026, which Alpine's form has not yet been updated to reflect
  • Approved Site Plan required (Form 1 — Site Plan Instructions for New Home)
  • Two complete sets of plans (footing/foundation, floor plans, elevations, construction details, framing plans, roof framing, electrical/plumbing/mechanical details, engineering, RESCheck) plus a USB flash drive with an electronic copy

Required documents

  • RequiredBuilding Permit Application (New Home Form #2)Alpine City's official new-home building permit application, revised 4/9/2025, requiring owner, contractor, and lot information plus contractor license numbers for general, electrical, plumbing, and mechanical trades.
  • RequiredSite Plan Instructions (Form #1)Alpine City's official site plan submittal instructions for new homes.
  • RequiredTwo Complete Plan Sets + USB Flash DriveTwo paper sets plus one electronic (USB) copy of: Approved Site Plan, Footing and Foundation Plans, Floor Plans, Elevations, Construction Detail, Floor Framing Plans, Roof Framing Plans, Electrical Details, Plumbing Details, Mechanical Details, Engineering, and RESCheck.

Fee schedule

Fee typeAmountNotes
Building Permit Application Fee (new homes/commercial buildings)$1,000.00, payable upon submission of plans and deducted from the plan check feeAlpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.a: 'New Homes/Commercial Buildings — $1,000'; confirmed on the official Building Permit Application (New Home Form #2, revised 4/9/2025): 'Permit Fee $1,000.00 (Payable upon Submission of Plans).'
Building Permit Fee — valuation-based (2021 IRC Appendix AL, as amended)$1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction.
Alpine City Consolidated Fee Schedule, Appendix B, 'Building Permit Fees (2021 IRC Appendix AL, as amended)' (source cited on the schedule itself: https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees). Show full citation

Alpine City Consolidated Fee Schedule, Appendix B, 'Building Permit Fees (2021 IRC Appendix AL, as amended)' (source cited on the schedule itself: https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees). Construction valuation is computed per Appendix A, 'Square Foot Construction Costs' (2008 ICC Building Valuation Data table) — e.g., R-3 Residential one- and two-family, Type VB construction: $101.95/sq ft; unfinished basements (all use groups): $15.00/sq ft per Appendix A footnote b.

One Percent State Surcharge1% of the building permit feeAlpine City Consolidated Fee Schedule, Section I.B.4: 'One percent surcharge per building permit (Utah Code): 80 percent submitted to Utah State Government, 20 percent retained by City for administration of State collection.'

Retaining Wall Permit

Verified

Required in Alpine City for retaining walls over 4 feet in exposed height under Development Code § 3.32; walls 2 feet or more (measured from top of footing to top of wall), or rock stacked steeper than 1.5:1, require engineering per Alpine's official Building Permit Instructions.

Verified 2026-07-08 · Source

Requirements

  • Retaining walls greater than 4 feet in exposed height require a separate Retaining Wall Permit under Alpine City Development Code § 3.32
  • Retaining walls 2 feet or more (top of footing to top of wall), or rock stacked steeper than 1.5:1, must be engineered
  • Slopes of 2:1 or greater require stabilization

Required documents

  • RequiredRetaining Wall ApplicationAlpine City's official Retaining Wall Application form.

Fee schedule

Fee typeAmountNotes
Retaining Wall Application Fee$300Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.d: 'Retaining Walls — $300.'
Retaining Wall Design Review Fee$135/hour + mileage at the current IRS rateAlpine City Consolidated Fee Schedule, Section I.B.8: 'Retaining Wall Design Review Fee — $135/hr + mileage at current IRS rate.'

Minor Trade Permit (Furnace, A/C, Water Heater, Meter Upgrade, etc.)

Verified

Required in Alpine City for standalone individual trade work such as furnace/AC replacement, water heater installation, and meter upgrades, using Alpine's official 'Building Permit — Furnace, Air Conditioning, Water Heater, Meter Upgrades, etc.' application.

Verified 2026-07-08 · Source

Requirements

  • Standalone individual trade permits including, but not limited to, meter upgrades, A/C, furnace, and water heater replacement/installation
  • Contractor license number (or Owner/Builder Certification, notarized, per Department of Commerce requirement) for the applicable trade

Required documents

  • RequiredBuilding Permit Application (Furnace, Air Conditioning, Water Heater, Meter Upgrades, etc.)Alpine City's official application form for minor individual trade permits.

Fee schedule

Fee typeAmountNotes
Minimum Fee for Issuance of Individual Permits$101Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.3: 'Minimum fees for issuance of individual permits including, but not limited to, meter upgrades, A/C, furnace, water heaters, etc. — $101.'

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Alpine building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)Later version (2026-07-19) →View current record →All versions →

Permalink: /utah/utah-county/alpine-ut/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.