This is PermitBase’s published record for Alpine as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Alpine building permits
VerifiedAlpine, Utah — as published 2026-07-19.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Home)
VerifiedRequired for new single-family residential construction in Alpine City, regulated by the adopted 2021 IRC. Alpine uses a valuation-based fee structure per its own Appendix A (2008 ICC square-foot construction cost table) and Appendix B (2021 IRC Appendix AL fee schedule, as amended), plus a flat $1,000 application fee credited against the plan-check fee.
Verified 2026-07-08 · Source
Requirements
- New single-family residential construction
- Structural design criteria must conform to the 2021 IRC, per Alpine's official Building Permit Instructions (New Home Form #2)
- Compliance with Alpine City Zoning Ordinances and the 2021 IBC (including Appendix C and J) as adopted by Alpine City — NOTE: this is Alpine's own currently-published (as of 2026-07-16) form language; the statewide-governing edition is now the 2024 IBC per Utah Code § 15A-2-103(1)(a), effective 7/1/2026, which Alpine's form has not yet been updated to reflect
- Approved Site Plan required (Form 1 — Site Plan Instructions for New Home)
- Two complete sets of plans (footing/foundation, floor plans, elevations, construction details, framing plans, roof framing, electrical/plumbing/mechanical details, engineering, RESCheck) plus a USB flash drive with an electronic copy
Required documents
- RequiredBuilding Permit Application (New Home Form #2)Alpine City's official new-home building permit application, revised 4/9/2025, requiring owner, contractor, and lot information plus contractor license numbers for general, electrical, plumbing, and mechanical trades.
- RequiredSite Plan Instructions (Form #1)Alpine City's official site plan submittal instructions for new homes.
- RequiredTwo Complete Plan Sets + USB Flash DriveTwo paper sets plus one electronic (USB) copy of: Approved Site Plan, Footing and Foundation Plans, Floor Plans, Elevations, Construction Detail, Floor Framing Plans, Roof Framing Plans, Electrical Details, Plumbing Details, Mechanical Details, Engineering, and RESCheck.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Application Fee (new homes/commercial buildings) | $1,000.00, payable upon submission of plans and deducted from the plan check fee | Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.a: 'New Homes/Commercial Buildings — $1,000'; confirmed on the official Building Permit Application (New Home Form #2, revised 4/9/2025): 'Permit Fee $1,000.00 (Payable upon Submission of Plans).' |
| Building Permit Fee — valuation-based (2021 IRC Appendix AL, as amended) | $1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. | Alpine City Consolidated Fee Schedule, Appendix B, 'Building Permit Fees (2021 IRC Appendix AL, as amended)' (source cited on the schedule itself: https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees). Show full citationHideAlpine City Consolidated Fee Schedule, Appendix B, 'Building Permit Fees (2021 IRC Appendix AL, as amended)' (source cited on the schedule itself: https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees). Construction valuation is computed per Appendix A, 'Square Foot Construction Costs' (2008 ICC Building Valuation Data table) — e.g., R-3 Residential one- and two-family, Type VB construction: $101.95/sq ft; unfinished basements (all use groups): $15.00/sq ft per Appendix A footnote b. |
| One Percent State Surcharge | 1% of the building permit fee | Alpine City Consolidated Fee Schedule, Section I.B.4: 'One percent surcharge per building permit (Utah Code): 80 percent submitted to Utah State Government, 20 percent retained by City for administration of State collection.' |
Retaining Wall Permit
VerifiedRequired in Alpine City for retaining walls over 4 feet in exposed height under Development Code § 3.32; walls 2 feet or more (measured from top of footing to top of wall), or rock stacked steeper than 1.5:1, require engineering per Alpine's official Building Permit Instructions.
Verified 2026-07-08 · Source
Requirements
- Retaining walls greater than 4 feet in exposed height require a separate Retaining Wall Permit under Alpine City Development Code § 3.32
- Retaining walls 2 feet or more (top of footing to top of wall), or rock stacked steeper than 1.5:1, must be engineered
- Slopes of 2:1 or greater require stabilization
Required documents
- RequiredRetaining Wall ApplicationAlpine City's official Retaining Wall Application form.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Retaining Wall Application Fee | $300 | Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.d: 'Retaining Walls — $300.' |
| Retaining Wall Design Review Fee | $135/hour + mileage at the current IRS rate | Alpine City Consolidated Fee Schedule, Section I.B.8: 'Retaining Wall Design Review Fee — $135/hr + mileage at current IRS rate.' |
Minor Trade Permit (Furnace, A/C, Water Heater, Meter Upgrade, etc.)
VerifiedRequired in Alpine City for standalone individual trade work such as furnace/AC replacement, water heater installation, and meter upgrades, using Alpine's official 'Building Permit — Furnace, Air Conditioning, Water Heater, Meter Upgrades, etc.' application.
Verified 2026-07-08 · Source
Requirements
- Standalone individual trade permits including, but not limited to, meter upgrades, A/C, furnace, and water heater replacement/installation
- Contractor license number (or Owner/Builder Certification, notarized, per Department of Commerce requirement) for the applicable trade
Required documents
- RequiredBuilding Permit Application (Furnace, Air Conditioning, Water Heater, Meter Upgrades, etc.)Alpine City's official application form for minor individual trade permits.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Minimum Fee for Issuance of Individual Permits | $101 | Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.3: 'Minimum fees for issuance of individual permits including, but not limited to, meter upgrades, A/C, furnace, water heaters, etc. — $101.' |
Commercial Building Permit
VerifiedRequired for new commercial building construction in Alpine City. Alpine's Consolidated Fee Schedule places commercial buildings in the same $1,000 application-fee tier as new homes ('New Homes/Commercial Buildings — $1,000') and uses the same valuation-based Building Permit Fee table (Appendix B), with construction valuation computed from Appendix A's Square Foot Construction Costs table using the applicable commercial occupancy group (e.g., Group B Business) rather than the R-3 residential rate. Alpine does not publish a separate commercial-specific application form, document checklist, or plan-review timeline distinct from this shared fee structure — consistent with Alpine being a predominantly residential/agricultural community (per its own Consolidated Fee Schedule and Apply-For permit index, which list no dedicated commercial application form) where commercial construction is comparatively infrequent.
Verified 2026-07-19 · Source
Requirements
- New commercial building construction within Alpine City
- Compliance with the 2024 International Building Code (IBC), including Appendices C and J, per Utah Code § 15A-2-103(1)(a), effective 7/1/2026 — Alpine's own Building Permit Instructions form has not yet been updated to reflect this and still references the 2021 IBC (see codesAdopted note)
- Construction plans and engineering sufficient to establish a total construction valuation under Appendix A (Square Foot Construction Costs) for calculation of the Appendix B Building Permit Fee
- Site plan
- Buildings of unusual design, excessive magnitude, or potentially hazardous exposures may require an independent design-professional review at the Chief Building Official's discretion, per the Consolidated Fee Schedule Section I.B.5
Required documents
- RequiredBuilding Permit ApplicationAlpine's Apply-For permit index (alpineut.gov/143/Apply-For) does not list a commercial-specific building permit application form distinct from the New Home Form #2 or the Remodel/Addition/Accessory Structures form — applicants should contact the Building Department (801-756-6347) to confirm the correct application for a new commercial building.
- RequiredConstruction Plans and EngineeringPlans sufficient to demonstrate compliance with the adopted building code and to establish a construction valuation under Appendix A of the Consolidated Fee Schedule; all structures in Alpine, regardless of size, require a building permit, per Alpine's official Building Department page.
- RequiredSite PlanSite plan showing the proposed commercial structure, consistent with Alpine's site plan submittal practice for new construction (Form #1, Site Plan Instructions).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Application Fee (New Homes/Commercial Buildings) | $1,000.00, payable upon submission of plans and deducted from the plan check fee | Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.a: 'New Homes/Commercial Buildings — $1,000.' |
| Building Permit Fee — valuation-based (2021 IRC Appendix AL, as amended) | Same graduated table as residential: $1–$500: $24. $501–$2,000: $24 + $3 per additional $100 or fraction. $2,001–$40,000: $69 + $11 per additional $1,000 or fraction. $40,001–$100,000: $487 + $9 per additional $1,000 or fraction. $100,001–$500,000: $1,027 + $7 per additional $1,000 or fraction. $500,001–$1,000,000: $3,827 + $5 per additional $1,000 or fraction. $1,000,001–$5,000,000: $6,327 + $3 per additional $1,000 or fraction. $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation for commercial buildings is computed via Appendix A using the applicable ICC occupancy-group rate — e.g., Group B (Business), Type VB construction: $109.47/sq ft; Type IA: $161.10/sq ft (Appendix A, 'Square Foot Construction Costs,' 2008 ICC Building Valuation Data table). | Alpine City Consolidated Fee Schedule, Appendix B, 'Building Permit Fees (2021 IRC Appendix AL, as amended)' (source cited on the schedule itself:… Show full citationHideAlpine City Consolidated Fee Schedule, Appendix B, 'Building Permit Fees (2021 IRC Appendix AL, as amended)' (source cited on the schedule itself: https://codes.iccsafe.org/content/IRC2021P2/appendix-al-permit-fees), applied per Section I.B.2: 'Building Permit Fees will be based on the construction values in Appendix A and in accordance with Appendix B.' Appendix A's 'Square Foot Construction Costs' table lists a full 2008 ICC occupancy-group schedule including Group B (Business) at $109.47/sq ft (Type VB) through $161.10/sq ft (Type IA) — this is not a residential-only table. |
| One Percent State Surcharge | 1% of the building permit fee | Alpine City Consolidated Fee Schedule, Section I.B.4: 'One percent surcharge per building permit (Utah Code): 80 percent submitted to Utah State Government, 20 percent retained by City for administration of State collection.' |
| Special Inspections | $130 | Alpine City Consolidated Fee Schedule, Section I.B.6: 'Special Inspections — $130.' Commercial construction more commonly triggers special-inspection requirements under the adopted IBC than typical residential work. |
| Re-inspection Fee | $130 | Alpine City Consolidated Fee Schedule, Section I.B.7: 'Re-inspection Fee — $130.' |
Commercial Tenant Improvement / Tenant Finish Permit
Covers interior tenant-finish and remodel work in existing commercial space in Alpine City. Alpine's Consolidated Fee Schedule does not publish a tenant-improvement-specific fee category (unlike neighboring Pleasant Grove, which lists a distinct 'Commercial Remodel/Tenant Improvement — $250' line item). Instead, a tenant improvement permit in Alpine falls under Alpine's general Building Permit Application fee tiers — $250 for 'Construction jobs exceeding a value of $50,000' or $25 for 'all other Building Permit Applications' — plus the same valuation-based Building Permit Fee (Appendix A/B) used for other building permits. Because no dedicated line item exists, this entry is marked partial: which general application-fee tier applies depends on the project's construction value, and this has not been independently confirmed with the Building Department for edge cases.
Reviewed 2026-07-19 · Source
Requirements
- Interior tenant-finish or remodel work in existing commercial space within Alpine City
- Compliance with the 2024 International Building Code (IBC), including Appendices C and J, per Utah Code § 15A-2-103(1)(a), effective 7/1/2026
- Construction plans showing the scope of interior work (wall layout, mechanical/electrical/plumbing changes, egress) sufficient to establish a construction valuation under Appendix A
- All structures in Alpine, regardless of size, require a building permit, per Alpine's official Building Department page — this applies to tenant improvement scopes as well
Required documents
- RequiredBuilding Permit ApplicationAlpine's Apply-For permit index lists a 'Building Permit (Remodel, Addition, Accessory Structures, etc.)' application form; no tenant-improvement-specific form is separately published, so this general remodel application form is the closest published match — confirm with the Building Department before submitting.
- RequiredConstruction/Renovation PlansPlans showing the interior scope of work (wall sections, MEP changes, egress) sufficient to establish a construction valuation under Appendix A of the Consolidated Fee Schedule.
- OptionalSite PlanRequired if the scope includes any exterior or site work; not required for purely interior tenant-finish work with no site changes.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Application Fee — 'Construction jobs exceeding a value of $50,000' | $250 | Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.b: 'Construction jobs exceeding a value of $50,000 — $250.' Applies if the tenant improvement's construction value exceeds $50,000; Show full citationHideAlpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.b: 'Construction jobs exceeding a value of $50,000 — $250.' Applies if the tenant improvement's construction value exceeds $50,000; otherwise the $25 tier (Section I.B.1.c) applies. Alpine does not publish a tenant-improvement-specific fee tier. |
| Building Permit Application Fee — 'Fee for all other Building Permit Applications' | $25 | Alpine City Consolidated Fee Schedule (effective 11/11/2025), Section I.B.1.c: 'Fee for all other Building Permit Applications — $25.' Applies if the tenant improvement's construction value does not exceed $50,000. |
| Building Permit Fee — valuation-based (2021 IRC Appendix AL, as amended) | Same graduated table as new construction: $1–$500: $24, up to $5,000,001 and over: $18,327 + $1 per additional $1,000 or fraction. Construction valuation is computed via Appendix A using the applicable commercial occupancy group (e.g., Group B Business: $109.47/sq ft, Type VB) — Appendix A's footnote (c) states 'Per shell only buildings deduct 20 percent,' which may be relevant if the tenant space was previously unfinished shell. | Alpine City Consolidated Fee Schedule, Appendix A ('Square Foot Construction Costs') and Appendix B ('Building Permit Fees (2021 IRC Appendix AL, as amended)'), applied per Section I.B.2: 'Building… Show full citationHideAlpine City Consolidated Fee Schedule, Appendix A ('Square Foot Construction Costs') and Appendix B ('Building Permit Fees (2021 IRC Appendix AL, as amended)'), applied per Section I.B.2: 'Building Permit Fees will be based on the construction values in Appendix A and in accordance with Appendix B.' |
| One Percent State Surcharge | 1% of the building permit fee | Alpine City Consolidated Fee Schedule, Section I.B.4: 'One percent surcharge per building permit (Utah Code): 80 percent submitted to Utah State Government, 20 percent retained by City for administration of State collection.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Alpine building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.