When you need this permit
- Tents or canopies over 400 sq ft
- Temporary stages or platforms
- Bleachers or grandstands
- Construction trailers and temporary offices
- Seasonal sales structures (fireworks stands, Christmas tree lots)
Required documents
- Req
Temporary Structure Application
Structure type, size, duration, and location
- Req
Site Plan
Structure placement, exits, fire lanes, and parking
- Req
Fire Safety Plan
Fire extinguishers, exit signage, and flame-retardant certification for tents
- Opt
Event Permit
Required for public events — separate from structure permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sales Office / Construction Trailer | $200 + state surcharge | — |
| State Surcharge | 1% of permit fee | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the Eagle Mountain building department
Inspection process
- 1
Setup Inspection
Structure erected, anchored, exits clear, fire extinguishers in place
- 2
Removal Verification
Structure removed by permit expiration date, site restored
Tips
- Tents over 400 sq ft in Eagle Mountain require a permit and flame-retardant certification.
- Temporary structures in Eagle Mountain are typically limited to 180 days — extensions may be available.
- Construction dumpsters and pods in the public right-of-way may require a separate encroachment permit.
- Public events with temporary structures require both a building permit and an event permit from Eagle Mountain.
Frequently asked questions
- Do I need a permit for a tent in Eagle Mountain?
- Yes, for tents over 400 sq ft. Eagle Mountain requires a temporary structure permit that covers fire safety, anchoring, and exit requirements. Smaller tents for personal use typically do not need a permit.
- How long can a temporary structure stay up in Eagle Mountain?
- Temporary structure permits in Eagle Mountain are typically valid for up to 180 days. The structure must be removed by the permit expiration date. Extensions may be available with a new application.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Eagle Mountain City Building Department — official building department
- Eagle Mountain Consolidated Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle Mountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eagle Mountain
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.