Required for construction of in-ground or above-ground swimming pools in Eagle Mountain. A building permit is required for pools 24 inches or deeper, or with a filter system, heater, or electrical lighting. Outdoor pools must have a fence at least six feet high.

Verified 2026-07-01 · Source

When you need this permit

  • All in-ground swimming pools
  • Above-ground pools 24 inches or deeper
  • Pools with a filter system, heater, or electrical lighting
  • Pool barrier/fence at least 6 feet high required for all outdoor pools

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Pool PermitGrounded: Consolidated Fee Schedule (updated March 3, 2026), Section 13.1 (p.10-11) — confirmed by full-text review of the published schedule (29 pages) that no separate flat pool-permit line item exists anywhere in the document; pool permits are billed on the general valuation-based building-permit fee table.
Valuation-based per Eagle Mountain Consolidated Fee Schedule, Section 13.1
Plan Review Fee — ResidentialEagle Mountain Consolidated Fee Schedule, Section 13.3
40% of the permit fee
State SurchargeEagle Mountain Consolidated Fee Schedule, Section 13.1; per Utah Code § 15A-1-209(5)
1% of the permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Eagle Mountain building department
~7–14 business days

How long did your Residential Pool Permit permit actually take in Eagle Mountain?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Gunite / Shell

    Steel reinforcement and plumbing before gunite or shell installation

  2. 2

    Electrical / Bonding

    Pool bonding, grounding, and electrical connections

  3. 3

    Barrier

    Pool fence/barrier compliance — gates, latches, minimum 6-foot height

  4. 4

    Final

    All work complete, pool filled, equipment operational

See the full Eagle Mountain inspection guide — scheduling & re-inspection fees →

Tips

  • Eagle Mountain requires outdoor pools to have a fence at least 6 feet high.
  • Power inspections must include the Rocky Mountain Power (RMP) work order number.
  • A separate electrical permit is required for pool pumps, heaters, and lighting — coordinate with a licensed electrician. Contractor
  • All inspections must be scheduled via email to buildinginspections@eaglemountain.gov.

Frequently asked questions

Yes. Eagle Mountain requires a building permit for pools 24 inches or deeper, or pools with a filter system, heater, or electrical lighting. Outdoor pools must have a fence at least 6 feet high.

In Eagle Mountain, the published Pool Permit is: Valuation-based per Eagle Mountain Consolidated Fee Schedule, Section 13.1. Additional published fees: Plan Review Fee — Residential — 40% of the permit fee; State Surcharge — 1% of the permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a residential pool permit in Eagle Mountain typically runs 7–14 business days. This is an estimate, not a published figure — confirm current review times with Eagle Mountain City Building Department at (801) 789-6600.

You'll need: Building Permit Application; Swim Enclosure Checklist; Site Plan; Detailed Plans; Electrical and Gas Diagrams. Depending on your project, Eagle Mountain may also ask for: Septic Approval Letter. See the required-documents checklist on this page for details on each.

Eagle Mountain requires 4 inspection(s) for a residential pool permit, in order: Pre-Gunite / Shell, Electrical / Bonding, Barrier, Final. Schedule each through Eagle Mountain City Building Department ((801) 789-6600).

Apply through Eagle Mountain City Building Department at 3726 E Campus Drive, Suites D & H, Eagle Mountain, Utah 84005. Phone: (801) 789-6600, email: buildinginspections@eaglemountain.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://eaglemountain.gov/government/building/.

Eagle Mountain, Utah has adopted: 2024 International Building Code (IBC) — governing edition per Utah Code § 15A-2-103(1)(a), effective 2026-07-01, superseded the 2021 edition (which was itself effective July 1, 2023). NOTE (2026-07-16, re-verified live): Eagle Mountain's own Building Department Compliance & Codes page (eaglemountain.gov/government/building/) still lists '2021 International Building Code (IBC)' and has not been updated to reflect the 2026-07-01 statewide transition.; 2021 International Residential Code (IRC) — Eagle Mountain Building Department, Compliance & Codes page; unaffected by the 7/1/2026 statute revision, continues in force per Utah Code § 15A-2-103(1)(b) — Eagle Mountain's page is current on this point; 2024 International Plumbing Code (IPC) — governing edition per Utah Code § 15A-2-103(1)(d), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Plumbing Code (IPC)' and has not been updated.; 2024 International Mechanical Code (IMC) — governing edition per Utah Code § 15A-2-103(1)(e), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Mechanical Code (IMC)' and has not been updated.; 2024 International Fuel Gas Code (IFGC) — governing edition per Utah Code § 15A-2-103(1)(f), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Fuel Gas Code (IFGC)' and has not been updated.; 2021 International Fire Code (IFC) — Eagle Mountain Building Department, Compliance & Codes page; 2024 International Energy Conservation Code (IECC) — governing edition per Utah Code § 15A-2-103(1)(h), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Energy Conservation Code (IECC)' and has not been updated.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force. NOTE: Eagle Mountain's building page lists 2020 NEC but the statewide-adopted edition is 2023 NEC per Utah Code § 15A-2-103 — the 2020 NEC listing on the city page is stale (re-confirmed live 2026-07-16, unrelated to and predating the 7/1/2026 transition); Eagle Mountain Municipal Code (local building and zoning regulations) — codepublishing.com/UT/EagleMountain/; NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16); IRC stays 2021; NEC stays 2023. Eagle Mountain's own Compliance & Codes page was checked live 2026-07-16 and still shows the pre-transition 2021 editions across the board — the statute governs regardless of the city page's lag..

Eagle Mountain requires a barrier fence at least 6 feet high around all outdoor pools, per the city's building page. Gates must be self-closing and self-latching.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle Mountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.