Department contacts, adopted codes, permit types, fees, and gotchas for Eagle Mountain, Utah.

Last verified 2026-08-21 · Source · Embed this page’s badge · Version history

Building department

Address
3726 E Campus Drive, Suites D & H, Eagle Mountain, Utah 84005
Phone
(801) 789-6600
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in Eagle Mountain — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — governing edition per Utah Code § 15A-2-103(1)(a), effective 2026-07-01, superseded the 2021 edition (which was itself effective July 1, 2023). Eagle Mountain's own Building Department Compliance & Codes page (eaglemountain.gov/government/building/) still lists '2021 International Building Code (IBC)' and has not been updated to reflect the 2026-07-01 statewide transition.
  • 2021 International Residential Code (IRC) — Eagle Mountain Building Department, Compliance & Codes page; unaffected by the 7/1/2026 statute revision, continues in force per Utah Code § 15A-2-103(1)(b) — Eagle Mountain's page is current on this point
  • 2024 International Plumbing Code (IPC) — governing edition per Utah Code § 15A-2-103(1)(d), effective 2026-07-01, superseding the 2021 edition. Note that Eagle Mountain's Compliance & Codes page still lists '2021 International Plumbing Code (IPC)' and has not been updated.
  • 2024 International Mechanical Code (IMC) — the governing edition per Utah Code § 15A-2-103(1)(e), effective 2026-07-01, superseding the 2021 edition. Eagle Mountain's Compliance & Codes page still lists '2021 International Mechanical Code (IMC)' and has not been updated; the state edition governs regardless.
  • 2024 International Fuel Gas Code (IFGC) — governing edition per Utah Code § 15A-2-103(1)(f), effective 2026-07-01, superseding the 2021 edition. Eagle Mountain's Compliance & Codes page still lists '2021 International Fuel Gas Code (IFGC)' and has not been updated.
  • 2021 International Fire Code (IFC) — Eagle Mountain Building Department, Compliance & Codes page
  • 2024 International Energy Conservation Code (IECC) — governing edition per Utah Code § 15A-2-103(1)(h), effective 2026-07-01, superseding the 2021 edition. Note that Eagle Mountain's Compliance & Codes page still lists '2021 International Energy Conservation Code (IECC)' and has not been updated.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force.
  • Eagle Mountain Municipal Code (local building and zoning regulations) — codepublishing.com/UT/EagleMountain/
  • Effective July 1, 2026 (now in force), the 2024 editions of the IBC, IPC, IMC, IFGC and IECC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027); the IRC stays 2021 and the NEC stays 2023. Eagle Mountain's own Compliance & Codes page still shows the pre-transition 2021 editions across the board — the statute governs regardless of the city page's lag.

Permit types & fees

Property Access

Eagle Mountain's permit history is searchable by address

52 permits in our copy of Eagle Mountain's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Eagle Mountain has issued.

None of Eagle Mountain's records carry an issued date, so this history cannot be filtered or sorted by date. The permits are here and searchable by address — but “when” is not a question they can answer.

Get Property AccessFree with a signed-in account · the guide above stays free

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-08)
61units

61 buildings · $20.6M valuation

Trailing 12 months
868units

12 of 12 months reported · #13 in Utah coverage by units

Year to date (2026 YTD through 2026-08)
482units

482 buildings · $76.7M valuation

8 month(s) reported to Census

Full year 2025
1,168units

1,150 buildings · $373.6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-08 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • All inspections in Eagle Mountain must be scheduled via email to buildinginspections@eaglemountain.gov — walk-ins are not accepted. Power inspections must include the Rocky Mountain Power (RMP) work order number. Cancel requests before 9 AM or they are processed the next business day.
  • Eagle Mountain's Consolidated Fee Schedule (updated March 3, 2026) is the authoritative fee source. Building permit fees were last revised 12/03/2024. The fee schedule is published on the transparency page at eaglemountain.gov/government/transparency/.
  • Eagle Mountain's building page (Compliance & Codes tab) still lists the 2020 NEC, but Utah's statewide-adopted edition is the 2023 NEC per Utah Code § 15A-2-103(1)(g). Contractors should apply the 2023 NEC.
  • As of July 1, 2026, the 2024 editions of the IBC, IPC, IMC, IFGC and IECC govern statewide under Utah Code § 15A-2-103 (le.utah.gov), superseding the 2021 editions. Eagle Mountain's Compliance & Codes page still lists all six codes at their pre-transition 2021 editions, plus the 2020 NEC, and has not been updated for the transition. The statute governs regardless: apply the 2024 editions (the 2021 IRC and 2023 NEC are unchanged) and confirm with the building department if in doubt.
  • Eagle Mountain uses the OpenGov portal for all permit applications: eaglemountainut.portal.opengov.com/categories/1076.
  • A 1% Utah state surcharge (Utah Code § 15A-1-209(5)) is assessed on all building permit fees in Eagle Mountain — this applies in addition to the base permit fee and plan review fee.
  • The link to the Consolidated Fee Schedule on Eagle Mountain's building page (dated 12/2024) is broken (404). The current fee schedule is at: https://eaglemountain.gov/wp-content/uploads/2026/03/Consolidated-Fee-Schedule-Current.pdf (from the transparency page).

Comparable nearby cities

Orem
Both in Utah County14 shared permit types~16 mi away
Compare fees →
Unincorporated Utah County
Both in Utah County14 shared permit types
Compare fees →
Spanish Fork
Both in Utah County13 shared permit types~24 mi away
Compare fees →