Residential Building Permit in Eagle Mountain, Utah
Required for new residential construction, additions, and structural alterations in Eagle Mountain. Permit fees are valuation-based per the Consolidated Fee Schedule (updated March 3, 2026). Plan review is approximately 14 business days. Applications submitted through the OpenGov portal. Eagle Mountain's Consolidated Fee Schedule (rev. 12/03/2024) prices all building permits — including electrical work — on the same total-valuation table, plus a 'Non-Valuation Based Permit – Inspection Only' fee of $50 per inspection for small standalone jobs; no distinct EV charger/EVSE fee line item was found as of 2026-07-19, so a standalone home EV charger installation would be priced under this general valuation table or the $50 inspection-only fee.
Verified 2026-06-30 · Source
When you need this permit
- New single-family or multi-family residential construction
- Additions to existing structures
- Structural modifications — load-bearing wall removal, foundation alterations
- Conversion of non-habitable space to habitable space
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy — certificate of occupancy issued upon passing
See the full Eagle Mountain inspection guide — scheduling & re-inspection fees →
Tips
- All inspections in Eagle Mountain must be scheduled via email to buildinginspections@eaglemountain.gov — walk-ins are not accepted. Power inspections must include the Rocky Mountain Power (RMP) work order number.
- Cancel inspection requests before 9 AM to avoid being charged — cancellations received after 9 AM are processed on the next business day.
- Eagle Mountain requires front and side yards to be landscaped before occupancy. In winter, a $2,000 escrow per lot can be paid, with landscaping completed within six months.
- Eagle Mountain uses the OpenGov portal for permit applications (eaglemountainut.portal.opengov.com/categories/1076).
- As of July 1, 2026 (now in force), the 2024 IBC, IPC, IMC, IFGC, and IECC govern statewide per Utah Code § 15A-2-103. Plans submitted for review before that date were reviewed under the 2021-edition codes in effect on the submission date.
- No distinct EV charger/EVSE fee line item appears in Eagle Mountain's Consolidated Fee Schedule (eaglemountain.gov, rev. 12/03/2024, checked 2026-07-19) — a standalone charger circuit not tied to new construction would most likely fall under the 'Non-Valuation Based Permit – Inspection Only' fee ($50 per inspection).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle Mountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Eagle Mountain
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Eagle Mountain project checklist
Describe your project once and get every permit, document, and fee it triggers in Eagle Mountain — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →