Sign Permit in Eagle Mountain, Utah

Required for installation of commercial signs in Eagle Mountain. The Consolidated Fee Schedule sets a flat $50 per sign face fee.

Verified 2026-06-30 · Source

When you need this permit

  • Permanent commercial signage (wall-mounted, monument, pole)
  • Illuminated or electronic message signs
  • Any sign requiring a building permit under Eagle Mountain code

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign PermitEagle Mountain Consolidated Fee Schedule, Section 8.1 (last revised 08/16/2011; confirmed in March 3, 2026 update)
$50 per sign face

Review timeline

Plan reviewTypical estimate — confirm current times with the Eagle Mountain building department
~5–14 business days

How long did your Sign Permit permit actually take in Eagle Mountain?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Sign installed per approved plan, structural connections and any electrical verified

See the full Eagle Mountain inspection guide — scheduling & re-inspection fees →

Tips

  • Eagle Mountain sign permits are $50 per sign face — one of the simpler, flat-fee permits.
  • Submit permit application via the Eagle Mountain OpenGov portal (eaglemountainut.portal.opengov.com/categories/1076).
  • Sign code requirements vary by zone — contact Eagle Mountain Community Development to confirm size and height limits for your zone.

Frequently asked questions

Eagle Mountain requires a sign permit for: Permanent commercial signage (wall-mounted, monument, pole); Illuminated or electronic message signs; Any sign requiring a building permit under Eagle Mountain code. If your project isn't listed, confirm with Eagle Mountain City Building Department at (801) 789-6600 before starting work.

Eagle Mountain charges $50 per sign face per the Consolidated Fee Schedule (updated March 3, 2026, Section 8.1).

Plan review for a sign permit in Eagle Mountain typically runs 5–14 business days. This is an estimate, not a published figure — confirm current review times with Eagle Mountain City Building Department at (801) 789-6600.

You'll need: Sign Application; Site Plan. See the required-documents checklist on this page for details on each.

Eagle Mountain requires 1 inspection(s) for a sign permit, in order: Final. Schedule each through Eagle Mountain City Building Department ((801) 789-6600).

Apply through Eagle Mountain City Building Department at 3726 E Campus Drive, Suites D & H, Eagle Mountain, Utah 84005. Phone: (801) 789-6600, email: buildinginspections@eaglemountain.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://eaglemountain.gov/government/building/.

Eagle Mountain, Utah has adopted: 2024 International Building Code (IBC) — governing edition per Utah Code § 15A-2-103(1)(a), effective 2026-07-01, superseded the 2021 edition (which was itself effective July 1, 2023). NOTE (2026-07-16, re-verified live): Eagle Mountain's own Building Department Compliance & Codes page (eaglemountain.gov/government/building/) still lists '2021 International Building Code (IBC)' and has not been updated to reflect the 2026-07-01 statewide transition.; 2021 International Residential Code (IRC) — Eagle Mountain Building Department, Compliance & Codes page; unaffected by the 7/1/2026 statute revision, continues in force per Utah Code § 15A-2-103(1)(b) — Eagle Mountain's page is current on this point; 2024 International Plumbing Code (IPC) — governing edition per Utah Code § 15A-2-103(1)(d), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Plumbing Code (IPC)' and has not been updated.; 2024 International Mechanical Code (IMC) — governing edition per Utah Code § 15A-2-103(1)(e), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Mechanical Code (IMC)' and has not been updated.; 2024 International Fuel Gas Code (IFGC) — governing edition per Utah Code § 15A-2-103(1)(f), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Fuel Gas Code (IFGC)' and has not been updated.; 2021 International Fire Code (IFC) — Eagle Mountain Building Department, Compliance & Codes page; 2024 International Energy Conservation Code (IECC) — governing edition per Utah Code § 15A-2-103(1)(h), effective 2026-07-01, superseded the 2021 edition. NOTE (2026-07-16, re-verified live): Eagle Mountain's Compliance & Codes page still lists '2021 International Energy Conservation Code (IECC)' and has not been updated.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unaffected by the 7/1/2026 statute revision, continues in force. NOTE: Eagle Mountain's building page lists 2020 NEC but the statewide-adopted edition is 2023 NEC per Utah Code § 15A-2-103 — the 2020 NEC listing on the city page is stale (re-confirmed live 2026-07-16, unrelated to and predating the 7/1/2026 transition); Eagle Mountain Municipal Code (local building and zoning regulations) — codepublishing.com/UT/EagleMountain/; NOTE: Effective July 1, 2026 (now in force) — 2024 editions of IBC, IPC, IMC, IFGC, IECC replaced the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; text independently re-verified live at le.utah.gov 2026-07-16); IRC stays 2021; NEC stays 2023. Eagle Mountain's own Compliance & Codes page was checked live 2026-07-16 and still shows the pre-transition 2021 editions across the board — the statute governs regardless of the city page's lag..

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eagle Mountain building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.