Swimming Pool Permit in St. George, Utah
Required for construction of new swimming pools, spas, and hot tubs in St. George. Includes above-ground and in-ground installations.
Verified 2026-06-27 · Source
When you need this permit
- All new pool, spa, or hot tub installations
- Barrier and fencing compliance required
- Electrical sub-panel for pool equipment
Required documents
- Req
Pool Plans
Engineered pool construction drawings including dimensions and depths
- Req
Site Plan
Plot plan showing pool location, setbacks, and barrier placement
- Req
Barrier Plan
Fencing and gate details complying with IRC pool barrier requirements
- Req
Electrical Plan
Electrical layout for pool equipment, bonding, and GFCI protection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming Pool Permit | $200 | — |
| State Surcharge | 1% of permit fee | — |
Review timeline
~7–14 business days
Typical estimate — confirm current times with the St. George building department
Inspection process
- 1
Pre-Gunite/Shell
Steel, plumbing, and bonding before concrete shell
- 2
Barrier
Pool fencing, gates, and self-closing/latching hardware
- 3
Final
Pool complete, equipment operational, all barriers in place
Tips
- Pool barrier fencing must be at least 5 feet tall with self-closing, self-latching gates.
- St. George's desert climate makes pools popular — submit early in spring to avoid peak-season delays.
Frequently asked questions
- Do I need a permit to build a swimming pool in St. George?
- Yes. All in-ground and above-ground swimming pools, spas, and hot tubs in St. George require a building permit. This includes associated electrical work, plumbing, and required safety barriers.
- What are the pool fencing requirements in St. George?
- St. George follows the International Residential Code pool barrier requirements. Fencing must be at least 5 feet tall, with self-closing and self-latching gates that open outward from the pool area.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- St. George Building Department — official building department
- St. George Building Fee Sheet (1997 UBC fee scale)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in St. George
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.