Residential Building Permit in St. George, Utah

Required for new residential construction, additions, structural alterations, and changes to electrical, plumbing, or mechanical systems in St. George. Governed by the 2021 International Residential Code (IRC) as adopted under Utah Code § 15A-2-103.

Verified 2026-07-23 · Source

When you need this permit

  • Project valuation over $500 (work at or below $500 uses the minimum permit fee of $60.60)
  • New single-family or multi-family residential construction
  • Additions or structural modifications — load-bearing wall removal, foundation alterations
  • Conversion of non-habitable space to habitable space
  • Any work requiring plan review under St. George City Code Title 8

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 5 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit — valuation $1 to $5001997 Uniform Building Code fee scale — St. George Building Fee Sheet (sgcityutah.gov); also confirmed in St. George City Impact Fees effective 4/21/21
$23.50
Building Permit — valuation $501 to $2,0001997 UBC fee scale — St. George Building Fee Sheet
$23.50 for the first $500, plus $3.05 for each additional $100 or fraction thereof, to and including $2,000
Building Permit — valuation $2,001 to $25,0001997 UBC fee scale — St. George Building Fee Sheet
$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000
Building Permit — valuation $25,001 to $50,000DRIFT FIX 2026-07-23: St. George's two live official fee PDFs disagree on this single tier. The Building Fee Sheet (sgcityutah.gov, PDF created 2020-08-13) prints '$391.75 for the first $25,000.00 plus $10.10...' both in its table and its prose, but its own table is internally inconsistent at this exact boundary — $24,000 is priced at $377.25 and $25,000 at $391.75, a $14.50 jump vs. the stated $14.00-per-$1,000 rate used everywhere else in the same table. The St. George City Impact Fees document (effective 4/21/21, chronologically newer) prints '$391.25 for the first $25,000.00 plus $10.10...' for the identical tier, which is arithmetically consistent ($69.25 + 23 x $14.00 = $391.25) and matches the $69.25-at-$2,000 and $643.75-at-$50,000 anchor points shared by both documents. Adopting the Impact Fees figure ($391.25) as the better-grounded value; both source PDFs directly re-fetched and confirmed live 2026-07-23.
$391.25 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000
Building Permit — valuation $50,001 to $100,0001997 UBC fee scale — St. George Building Fee Sheet
$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000
Building Permit — valuation $100,001 to $500,0001997 UBC fee scale — St. George Building Fee Sheet
$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000
Building Permit — valuation $500,001 to $1,000,0001997 UBC fee scale — St. George Building Fee Sheet
$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000
Building Permit — valuation over $1,000,0001997 UBC fee scale — St. George Building Fee Sheet
$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereof
Minimum Building PermitSt. George Building Fee Sheet
$60.60 ($60.00 permit + $0.60 D.O.C. surcharge)
Plan Check (Plan Review) FeeSt. George Building Fee Sheet
65% of the building permit fee
D.O.C. State SurchargeSt. George Building Fee Sheet — Utah state Division of Occupational and Professional Licensing surcharge
1% of the building permit fee
Reinspection FeeSt. George City Impact Fees document (effective 4/21/21) — assessed under provisions of Section 305.8
$47.00 per hour (minimum one-half hour)
After-Hours Inspection FeeSt. George City Impact Fees document (effective 4/21/21) — for inspections outside normal business hours
$47.00 per hour (minimum two hours)

Review timeline

Plan reviewTypical estimate — confirm current times with the St. George building department
~10–21 business days

How long did your Residential Building Permit permit actually take in St. George?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation or wall cover

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete — compliance letter from soils company required; elevation certification if required; backflow prevention on hose bibs and landscape sprinkler systems; stucco and insulation certificates; engineering letter for retaining/rock walls; exterior drainage; permanent house numbers; per St. George Residential Final Inspection Checklist

See the full St. George inspection guide — scheduling & re-inspection fees →

Tips

  • Submit permits online through the St. George CityInspect portal (stg.cityinspect.com) — register at utah.cityinspect.com/register before first use.
  • St. George's published design criteria (IRC Table R301.2(1) insert): Ground Snow Load 21 lbs, Roof Snow Load 20 lbs, Wind Speed 105 mph, Seismic Design Category D/soils/engineering, Frost Line Depth 12 inches, Weathering moderate, Termite moderate to heavy.
  • Soils reports are required for all new construction in St. George due to expansive soils. A soils compliance letter must be submitted before final inspection.
  • New single-family homes must pass Site & Shell Water, Site & Shell Wastewater, Drive Approach, and N.O.T. (Notice of Termination) inspections prior to a certificate of occupancy.
  • St. George uses the 1997 Uniform Building Code valuation-based fee scale — not the newer ICC fee schedule used by many Utah cities.

Frequently asked questions

St. George requires a residential building permit for: Project valuation over $500 (work at or below $500 uses the minimum permit fee of $60.60); New single-family or multi-family residential construction; Additions or structural modifications — load-bearing wall removal, foundation alterations; Conversion of non-habitable space to habitable space; Any work requiring plan review under St. George City Code Title 8. If your project isn't listed, confirm with St. George Building Department at (435) 627-4100 before starting work.

St. George building permit fees use the 1997 Uniform Building Code valuation scale: $23.50 for work valued at $500 or less, scaling to $5,608.75 plus $3.65 per each additional $1,000 over $1,000,000. The minimum permit is $60.60. Plan check is 65% of the permit fee. A 1% D.O.C. state surcharge also applies. Reinspection is $47/hr (minimum half-hour).

Plan review for a residential building permit in St. George typically runs 10–21 business days. This is an estimate, not a published figure — confirm current review times with St. George Building Department at (435) 627-4100.

You'll need: Building Permit Application (CityInspect); Construction Plans; Soils / Geotechnical Report; IRC/IECC Code Compliance Certification; IRC Equipment and Duct Plan. Depending on your project, St. George may also ask for: Engineered Truss Plans. See the required-documents checklist on this page for details on each.

St. George requires 4 inspection(s) for a residential building permit, in order: Foundation / Footing, Framing, Insulation, Final. Schedule each through St. George Building Department ((435) 627-4100).

Register or log in at the St. George CityInspect portal (stg.cityinspect.com) and submit your permit application online. New users must first register at utah.cityinspect.com/register. The Building Department is at 61 S Main St, phone (435) 627-4100.

St. George, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026 (statute version headed 'Effective 7/1/2026 (Superseded 1/1/2027)', confirmed by direct fetch 2026-07-16). Supersedes the 2021 IBC, which governed through 6/30/2026.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle — remains 2021 and continues in force (confirmed by direct statute fetch 2026-07-16).; Appendix AQ of the 2021 International Residential Code — Utah Code § 15A-2-103(1)(c) (confirmed by direct statute fetch 2026-07-16).; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle — remains 2023 (confirmed by direct statute fetch 2026-07-16).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). ONE statewide edition — the statute does not split residential vs. commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IEBC, which governed through 6/30/2026.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 ISPSC, which governed through 6/30/2026.; NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions as current and only forecasted the 7/1/2026 flip; the effective date has now passed and the entries above have been corrected to state the 2024 editions (per §15A-2-103(1)(a)/(d)/(e)/(f)/(h)/(i)/(n)) as current, with the superseded 2021 editions preserved as historical context. IRC (2021) and NEC (2023) were NOT changed — verified unchanged directly against the live statute. The International Fire Code (IFC) is NOT adopted anywhere in Utah Code § 15A-2-103 — the statute has no IFC subsection; St. George's own building department page does not independently cite an IFC edition, so no IFC entry appears in this list.. Local amendments apply — see the St. George overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.