Residential Building Permit — St. George, Utah · Requirements sheet
Verified 2026-07-23 · Source: https://sgcityutah.gov/departments/community_development/building_department.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in St. George, Utah
Required for new residential construction, additions, structural alterations, and changes to electrical, plumbing, or mechanical systems in St. George. Governed by the 2021 International Residential Code (IRC) as adopted under Utah Code § 15A-2-103.
Verified 2026-07-23 · Source
When you need this permit
- Project valuation over $500 (work at or below $500 uses the minimum permit fee of $60.60)
- New single-family or multi-family residential construction
- Additions or structural modifications — load-bearing wall removal, foundation alterations
- Conversion of non-habitable space to habitable space
- Any work requiring plan review under St. George City Code Title 8
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
St. George's two live official fee PDFs disagree on this single tier. Show full citationHide
St. George's two live official fee PDFs disagree on this single tier. The Building Fee Sheet (sgcityutah.gov, PDF created 2020-08-13) prints '$391.75 for the first $25,000.00 plus $10.10...' in both its table and its prose, but its own table is internally inconsistent at that exact boundary: $24,000 is priced at $377.25 and $25,000 at $391.75, a $14.50 jump against the $14.00-per-$1,000 rate used everywhere else in the same table. The chronologically newer St. George City Impact Fees document (effective 4/21/21) prints '$391.25 for the first $25,000.00 plus $10.10...' for the identical tier, which is arithmetically consistent ($69.25 + 23 x $14.00 = $391.25) and matches the $69.25-at-$2,000 and $643.75-at-$50,000 anchor points both documents share. The Impact Fees figure, $391.25, is the better-grounded of the two; if the difference matters to your budget, confirm the tier with the City.Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete — compliance letter from soils company required; elevation certification if required; backflow prevention on hose bibs and landscape sprinkler systems; stucco and insulation certificates; engineering letter for retaining/rock walls; exterior drainage; permanent house numbers; per St. George Residential Final Inspection Checklist
See the full St. George inspection guide — scheduling & re-inspection fees →
Tips
- Submit permits online through the St. George CityInspect portal (stg.cityinspect.com) — register at utah.cityinspect.com/register before first use.
- St. George's published design criteria (IRC Table R301.2(1) insert): Ground Snow Load 21 lbs, Roof Snow Load 20 lbs, Wind Speed 105 mph, Seismic Design Category D/soils/engineering, Frost Line Depth 12 inches, Weathering moderate, Termite moderate to heavy.
- Soils reports are required for all new construction in St. George due to expansive soils. A soils compliance letter must be submitted before final inspection.
- New single-family homes must pass Site & Shell Water, Site & Shell Wastewater, Drive Approach, and N.O.T. (Notice of Termination) inspections prior to a certificate of occupancy.
- St. George uses the 1997 Uniform Building Code valuation-based fee scale — not the newer ICC fee schedule used by many Utah cities.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Online permit portal
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
St. George's permit history is searchable by address
25,627 permits in our copy of St. George's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything St. George has issued.
25,599 of these 25,630 permits — 99.9% — carry an issued date, and those run from 1970 to 2026. The remaining 31 have no date at all.
Other permits in St. George
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your St. George project checklist
Describe your project once and get every permit, document, and fee it triggers in St. George — in one checklist. Free, for any city and any number of projects.
Get started →