St. George building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in St. George, Utah.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 61 S Main St, St. George, UT 84770
- Phone
- (435) 627-4100
- building@sgcity.org
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU)
- 1
Foundation
Footings, forms, rebar — before concrete pour
- 2
Framing
Structure, fire separation, egress windows
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Insulation
Insulation and vapor barrier before drywall
- 5
Final
All work complete, smoke/CO detectors installed (one CO detector per habitable level), address posted, ready for occupancy
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Standard IBC inspection sequence before concrete pour.
- 2
Structural / Framing
Framing and structural elements, including fire barriers, fire walls, and fire-stopping, verified against submitted plans before close-in.
- 3
Fire Sprinkler / Fire Alarm
Fire sprinkler and fire alarm systems inspected under separate review and approval by the St. George Fire Department, where applicable.
- 4
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 5
Final
All work complete before occupancy.
Applies to: Basement Finish Permit
- 1
Framing
Wall framing, fire blocking, egress window openings and window wells
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed
- 3
Insulation
Insulation on exterior walls before drywall
- 4
Final
Drywall, fixtures, and all finishes complete; smoke detectors and carbon monoxide detectors (one per habitable level) installed per St. George's Final Inspection Checklist items 20–21
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete — compliance letter from soils company required; elevation certification if required; backflow prevention on hose bibs and landscape sprinkler systems; stucco and insulation certificates; engineering letter for retaining/rock walls; exterior drainage; permanent house numbers; per St. George Residential Final Inspection Checklist
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Fire-Rated Assembly
Wall construction and any fire-rated/occupancy separation assemblies verified before close-in.
- 2
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 3
Final
All finishes verified complete before occupancy, including general code-required accessibility compliance for the remodeled area.
Applies to: Deck Permit
- 1
Footings
Verify footing depth, diameter, and rebar before concrete pour — frost line is 12 inches in St. George per the city's published design criteria (Table R301.2(1) insert)
- 2
Framing
Posts, beams, joists, ledger connection, and hardware (joist hangers, post caps, bolts) verified
- 3
Final
Decking, stairs, guards, and railings complete — guards required when deck surface is 30 inches or more above grade; guardrail spacing: a 4-inch sphere cannot pass between rails (per St. George Final Inspection Checklist item 10)
Applies to: Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, and proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
Applies to: Fire Sprinkler / Fire Alarm System Permit
- 1
Underground / Rough-In
Sprinkler underground piping and rough wiring for alarm devices, before concealment — verify pipe materials, wiring type, and device placement
- 2
Hydrostatic / Flush Test
Sprinkler system hydrostatic pressure test and underground flush test per NFPA 13, witnessed before system is placed in service
- 3
Final Acceptance Test
Full system functional test — sprinkler flow/alarm interlock test per NFPA 13 and fire alarm final acceptance test (device activation, monitoring signal transmission to the central station) per NFPA 72
Applies to: Plumbing Permit
- 1
Underground / Slab
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed, before walls closed — pressure test required
- 3
Final
All fixtures connected, water flowing, no leaks, proper venting verified; backflow prevention devices required on hose bibs and landscape sprinkler systems per the St. George Residential Final Inspection Checklist
Applies to: Swimming Pool Permit
- 1
Pre-Gunite / Shell
Steel, plumbing, and bonding before concrete shell is poured
- 2
Barrier
Pool fencing, gates, and self-closing/self-latching hardware verified
- 3
Final
Pool complete, equipment operational, all barriers in place
Applies to: Certificate of Occupancy / Change of Use Permit
- 1
Building Department Final Inspection
Confirms the building or tenant space and its proposed use conform to the adopted building codes — required before the Certificate of Occupancy is issued per St. George City Code § 9-1-3
- 2
Fire Department Inspection
Required only when the business maintains a physical location in St. George (not applicable to home occupations); a Fire Department representative contacts the applicant if required
Applies to: Demolition Permit
- 1
Pre-Demolition
Verify utility disconnects are complete and any required asbestos clearance is obtained before work begins
- 2
Final / Site Clear
Site cleared, foundation removed or capped, erosion control in place
Applies to: EV Charger / EVSE Permit
- 1
Service / Panel
Panel/circuit installation, grounding electrode system inspection for the EVSE circuit.
- 2
Final
Charger mounted and energized, GFCI/breaker protection verified per NEC Article 625 (Electric Vehicle Power Transfer System).
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support; IRC Equipment and Duct Plan must be on-site
- 2
Final
Equipment operational, Manual J/S/D verified, gas pressure tested, thermostat functional, combustion air supply verified; carbon monoxide detector required on every habitable level per St. George's inspection requirements
Applies to: Roofing Permit
- 1
Deck / Substrate
After tear-off — verify sheathing condition and replace damaged decking before proceeding; inspector must see sheathing before underlayment is installed
- 2
Final
Completed roof — roofing material and flashing completed; no extra material on roof (per St. George Residential Final Inspection Checklist item 9)
Applies to: Solar Panel Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
Final inspection only: Sign Permit, Water Heater Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
St. George building permits
Get alerts for St. George
We'll email you when St. George's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.