St. George building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for St. George, Utah.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
61 S Main St, St. George, UT 84770
Phone
(435) 627-4100
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in St. George — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026 (statute version headed 'Effective 7/1/2026 (Superseded 1/1/2027)', confirmed by direct fetch 2026-07-16). Supersedes the 2021 IBC, which governed through 6/30/2026.
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle — remains 2021 and continues in force (confirmed by direct statute fetch 2026-07-16).
  • Appendix AQ of the 2021 International Residential Code — Utah Code § 15A-2-103(1)(c) (confirmed by direct statute fetch 2026-07-16).
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026.
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026.
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle — remains 2023 (confirmed by direct statute fetch 2026-07-16).
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). ONE statewide edition — the statute does not split residential vs. commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IEBC, which governed through 6/30/2026.
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 ISPSC, which governed through 6/30/2026.
  • NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions as current and only forecasted the 7/1/2026 flip; the effective date has now passed and the entries above have been corrected to state the 2024 editions (per §15A-2-103(1)(a)/(d)/(e)/(f)/(h)/(i)/(n)) as current, with the superseded 2021 editions preserved as historical context. IRC (2021) and NEC (2023) were NOT changed — verified unchanged directly against the live statute. The International Fire Code (IFC) is NOT adopted anywhere in Utah Code § 15A-2-103 — the statute has no IFC subsection; St. George's own building department page does not independently cite an IFC edition, so no IFC entry appears in this list.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
58units

58 buildings · $10M valuation

Trailing 12 months
808units

11 of 12 months reported · #11 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
391units

361 buildings · $66.1M valuation

5 month(s) reported to Census

Full year 2025
936units

828 buildings · $172.9M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • St. George uses the 1997 Uniform Building Code valuation-based fee scale — not the newer ICC fee schedule used by many Utah cities. There are no published separate per-fixture or per-trade fees for electrical, plumbing, or mechanical permits; all use the same 1997 UBC valuation tiers.
  • Minimum building permit fee in St. George is $60.60 ($60 permit + $0.60 D.O.C. surcharge). A 1% D.O.C. state surcharge applies to all permits in addition to the valuation-based fee. Plan check (plan review) is 65% of the building permit fee.
  • Reinspection fees in St. George are $47.00 per hour (minimum one-half hour) per the Impact Fees document effective 4/21/21. After-hours inspection is $47/hr with a minimum of two hours.
  • Soils / geotechnical reports are required for all new construction in St. George due to expansive soils. A soils compliance letter must be submitted before the final inspection.
  • Apply for building permits online through the St. George CityInspect portal at stg.cityinspect.com. First-time users must register at utah.cityinspect.com/register.
  • St. George's design criteria (IRC Table R301.2(1) insert on the building dept page): frost line 12 inches (shallower than northern Utah due to the warm desert climate), Seismic Design Category D/soils/engineering, Wind Speed 105 mph, Termite risk moderate to heavy.
  • New single-family homes must pass Site & Shell Water, Site & Shell Wastewater, Drive Approach, and N.O.T. inspections before receiving a certificate of occupancy.
  • Carbon monoxide detectors are required on every habitable level when gas appliances are present, per item 21 of the St. George Residential Final Inspection Checklist.
  • As of July 1, 2026, the 2024 IBC, IPC, IMC, IFGC, IECC, and IEBC editions (and the residential provisions of the 2024 ISPSC) are the CURRENT statewide codes per Utah Code § 15A-2-103 — confirmed by direct fetch of the live statute 2026-07-16. The 2021 IRC and 2023 NEC continue unchanged. St. George's own building page does not publish a local code adoption page beyond the state mandate, so no city-page lag applies here — the fix corrects a corpus-wide staleness in this file's own codesAdopted array (it had been left forecasting the flip rather than stating it as current after the effective date passed). The International Fire Code (IFC) is not adopted under §15A-2-103 at all.
  • Swimming pool permit is a flat $202 ($200 + $2 D.O.C.) per the Impact Fees schedule — one of the only permit types with a published flat fee in St. George.
  • FULL SPOT-AUDIT 2026-07-23: all 7 top-level cited sources plus every permit-type-level source in this file were re-fetched live (or, for the 3 stgeorge.municipal.codes citations, confirmed WAF-blocked-not-dead and corroborated against Wayback archives) and cross-checked against every published fee, timeline, code edition, contact detail, and quoted checklist item in this file. One real drift was found and fixed: the '$25,001 to $50,000' building-permit valuation tier was corrected from $391.75 to $391.25 (see that fee entry's note for the two-source discrepancy this resolves). One misattributed citation was corrected: the Water Heater Permit's final-inspection description no longer attributes T&P-valve-discharge and seismic-strapping specifics to checklist 'item 17', which covers only the condensate/water-conditioner air gap. All other cited figures — the full 1997 UBC valuation table, the $60.60 minimum permit, 65% plan check, 1% D.O.C., $202 swimming pool fee, $47/hr reinspection fee, all 2024/2021/2023 code editions under Utah Code § 15A-2-103, the sign permit's $100 fee and 5-business-day timeline, the department phone/email/address, and all Final Inspection Checklist item citations except the one corrected above — were re-confirmed live and unchanged.

Comparable nearby cities

Unincorporated Washington County
Both in Washington County14 shared permit types
Compare fees →
Washington City
Both in Washington County10 shared permit types~6 mi away
Compare fees →
Santa Clara
Both in Washington County7 shared permit types~6 mi away
Compare fees →