Demolition Permit in St. George, Utah
Required for partial or complete demolition of structures in St. George, including utility disconnection and debris disposal.
Verified 2026-06-27 · Source
When you need this permit
- Complete demolition of any structure
- Partial demolition involving structural elements
- Removal of load-bearing walls
- Demolition of structures with asbestos or lead paint
Required documents
- Req
Demolition Application
Scope of demolition, structure details, and disposal plan
- Req
Asbestos Survey
NESHAP asbestos inspection for structures built before 1985
- Req
Utility Disconnect Confirmation
Proof that gas, electric, water, and sewer are disconnected
- Opt
Site Plan
Showing structure to be demolished, adjacent structures, and access
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | Minimum building permit $60.60 or valuation-based | — |
| State Surcharge | 1% of permit fee | — |
Review timeline
~3–10 business days
Typical estimate — confirm current times with the St. George building department
Inspection process
- 1
Pre-Demolition
Verify utility disconnects and asbestos clearance before work begins
- 2
Final/Site Clear
Site cleared, foundation removed or capped, erosion control in place
Tips
- Utilities must be disconnected by the utility company before demolition begins — St. George will verify.
- Structures built before 1985 require an asbestos survey before a demolition permit is issued.
- Notify neighbors and St. George at least 48 hours before demolition work starts.
- Demolition debris must go to an approved landfill — St. George may require a disposal receipt.
Frequently asked questions
- Do I need a permit to demolish a structure in St. George?
- Yes. St. George requires a demolition permit for all complete and partial structural demolitions. The permit ensures utilities are safely disconnected and hazardous materials like asbestos are properly handled.
- Do I need an asbestos test before demolition in St. George?
- Yes, for structures built before 1985. Federal NESHAP regulations require an asbestos inspection before demolition, and St. George enforces this as part of the permit process.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- St. George Building Department — official building department
- St. George Building Fee Sheet (1997 UBC fee scale)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in St. George
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.