Certificate of Occupancy / Change of Use Permit in St. George, Utah
Required before any building, structure, or tenant space in St. George is occupied or its use changed, per St. George City Code § 9-1-3 (Certificates of Occupancy). Triggered by new construction, remodeling, tenant improvement, or a change in occupancy classification under the 2024 International Existing Building Code (IEBC), adopted statewide under Utah Code § 15A-2-103(1)(i). For commercial tenants this process is coordinated with St. George's business/occupational licensing process, which requires Planning and Zoning approval, a Fire Department inspection, and Building Department approval before a new or relocated business can open — St. George's own Business License Overview states that a newly constructed, remodeled, or Tenant-Improved location must obtain a Certificate of Occupancy or Final Construction approval as part of that process.
Reviewed 2026-07-23 · Source
When you need this permit
- No building, structure, or vacant land may be occupied or used, and no building hereafter erected, altered, or moved may be occupied, until a Certificate of Occupancy is issued by the chief building official — St. George City Code § 9-1-3
- Required whenever a business occupies a newly constructed, remodeled, or Tenant-Improved commercial space, per the St. George Business License Overview
- Required for any change in occupancy classification or use of an existing building under the 2024 IEBC (Utah Code § 15A-2-103(1)(i))
- Final inspection by the Building Department confirming the building and its proposed use conform to the adopted codes
- Planning and Zoning approval that the use and location meet zoning requirements
- Fire Department inspection/approval (required only when the business maintains a physical location in St. George — not applicable to home occupations)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Building Department Final Inspection
Confirms the building or tenant space and its proposed use conform to the adopted building codes — required before the Certificate of Occupancy is issued per St. George City Code § 9-1-3
- 2
Fire Department Inspection
Required only when the business maintains a physical location in St. George (not applicable to home occupations); a Fire Department representative contacts the applicant if required
See the full St. George inspection guide — scheduling & re-inspection fees →
Tips
- St. George City Code § 9-1-3 allows the chief building official to issue a conditional (partial/temporary) Certificate of Occupancy for all or a portion of a building when appropriate — ask the Building Department whether this applies to phased tenant build-outs.
- If your commercial space is newly constructed, remodeled, or the result of a Tenant Improvement, budget time for a Certificate of Occupancy or Final Construction approval as part of your business license application — per the city's Business License Overview.
- Fire Department inspection is required only for businesses with a physical St. George location — home-based businesses are exempt from this specific requirement, per the Business License Overview.
- A change of occupancy classification on an existing building (even without new construction) is regulated by the 2024 International Existing Building Code, adopted statewide under Utah Code § 15A-2-103(1)(i) — confirm with the Building Department whether your specific use change triggers IEBC Chapter 10 requirements.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in St. George
Certificate of Occupancy / Change of Use Permit in other cities
Compare certificate of occupancy / change of use permit fees across Utah →