Certificate of Occupancy / Change of Use — South Jordan, Utah · Requirements sheet
Verified 2026-07-22 · Source: https://www.sjc.utah.gov/266/Building-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use in South Jordan, Utah
South Jordan does not publish a standalone 'change of use' permit product under that name. Its own primary-source documents — the 'SJC Certificate of Occupancy Commercial Checklist – New Building' and 'SJC Certificate of Occupancy Commercial Checklist Tenant Improvement Finish' — establish that the city's actual terminology and process is 'Certificate of Occupancy': a multi-department sign-off checklist that must be completed and signed by authorized personnel before a space (new building or tenant space) may be occupied, presented to the South Jordan City Building Inspector at final inspection. A pure change of use in an existing space (no construction) is handled through this same checklist process plus an updated Business License reflecting the new use, rather than a distinct permit type.
Verified 2026-07-22 · Source
When you need this permit
- Required before occupying any new commercial building or completed commercial tenant improvement space
- New Building checklist requires sign-off from Community Development, Fire, Engineering, Public Works, UPDES (SWPPP), Utility Billing, and Business Licensing, plus applicable outside agencies
- Tenant Improvement Finish checklist requires sign-off from Fire, Utility Billing, and Business Licensing, plus applicable outside agencies
- Applicable outside-agency sign-offs (State Elevator Inspector, State Boiler Inspector, Special Inspection Agency, Salt Lake County Environmental Health, Jordan Basin Improvement District) where the project scope requires them
- A change in use/occupancy classification of an existing space (with or without construction) requires an updated Business License reflecting the actual use, and — where the new use changes the IBC/IEBC occupancy classification — plan review under the adopted 2024 International Existing Building Code (IEBC)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
South Jordan's FY 2026-2027 Fee Schedule lists no separate Certificate of Occupancy or change-of-use permit fee line; Show full citationHide
South Jordan's FY 2026-2027 Fee Schedule lists no separate Certificate of Occupancy or change-of-use permit fee line; issuance is bundled into the final-inspection process of the associated building permit (Commercial PRNR, Commercial Tenant Improvement PRCR, or the applicable residential permit).Review timeline
Inspection process
- 1
Final
All required South Jordan City department and outside-agency sign-offs collected on the applicable Certificate of Occupancy checklist and presented to the Building Inspector at final inspection; failure to complete requirements and obtain necessary signatures delays final inspection and occupancy
See the full South Jordan inspection guide — scheduling & re-inspection fees →
Tips
- South Jordan does not publish a standalone 'change of use' permit — a change in use of an existing commercial space is handled through this same Certificate of Occupancy checklist plus an updated Business License reflecting the new use, and (if construction is involved) the Commercial Tenant Improvement permit.
- The New Building checklist requires more department sign-offs (Community Development, Fire, Engineering, Public Works, UPDES/SWPPP, Utility Billing, Business Licensing) than the Tenant Improvement Finish checklist (Fire, Utility Billing, Business Licensing) — confirm which applies to your project.
- Request the Fire Department final inspection by emailing sjcinspections@sjc.utah.gov — both checklist versions route this sign-off through email rather than an in-person visit request.
- If changing the use of an existing space without construction, a Zoning Compliance Letter ($431) can confirm zoning compliance for the new use before applying for an updated Business License.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
South Jordan's permit history is searchable by address
25,492 permits on record for South Jordan, 2005–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
98% of South Jordan's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in South Jordan
Certificate of Occupancy / Change of Use in other cities
Compare certificate of occupancy / change of use fees across Utah →
Look up this fee in a different city →