South Jordan building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in South Jordan, Utah.
Verified 2026-06-30 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 1600 West Towne Center Drive, South Jordan, UT 84095
- Phone
- (801) 446-4357
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Published scheduling rules
- South Jordan uses the CityView online portal for all permit applications and inspection scheduling: cityview.southjordanutah.gov/CityViewPortal. (General)
Inspection sequence
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Underground / Rough-In (MEP)
Before backfill and before closing walls or ceilings
- 3
Framing
After framing, sheathing, and rough-in mechanical/electrical/plumbing
- 4
Fire Sprinkler / Alarm
Commercial Sprinkler Plan Review and System Inspection, priced per the ICC/SJC Valuation Fee Schedule
- 5
Final
All work complete — certificate of occupancy issued upon passing final inspection
Applies to: Basement Finish Permit
- 1
Framing
Wall framing, fire blocking, egress window openings
- 2
MEP Rough-In
Electrical, plumbing, and HVAC rough-ins before walls closed
- 3
Insulation
Insulation on exterior walls, vapor barrier placement
- 4
Final
Drywall, fixtures, smoke/CO detectors, and all finishes complete
Applies to: Residential Building Permit
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Applies to: Swimming Pool Permit
- 1
Excavation / Steel
Pool shell excavation, rebar, and plumbing before gunite/shotcrete
- 2
Electrical / Bonding
Pool bonding grid, equipment connections, GFCI protection per 2023 NEC Article 680
- 3
Barrier
Pool fence/barrier — minimum 48-inch height, self-closing/self-latching gates
- 4
Final
Pool complete, filled, equipment operational, all barriers in place
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Final
All work complete, ready for occupancy
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Rough-In (MEP)
After framing and rough-in mechanical, electrical, and plumbing work
- 2
Fire Sprinkler / Alarm (if applicable)
Commercial Sprinkler Plan Review and System Inspection where the scope modifies existing fire suppression systems
- 3
Final
All work complete; space approved for occupancy under the tenant's use classification
Applies to: Deck Permit
- 1
Footings
Verify footing depth (30-inch frost depth minimum), diameter, and rebar before concrete pour
- 2
Framing
Posts, beams, joists, ledger connection, and hardware
- 3
Final
Decking, stairs, guards, and railings complete
Applies to: Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
Applies to: Fire Sprinkler & Fire Alarm Permit
- 1
Underground / Rough-In
Underground sprinkler piping and rough fire alarm wiring — before backfill or concealment
- 2
System Acceptance Test
Hydrostatic/flow test of the sprinkler system and functional test of the fire alarm system per the adopted fire-protection code
- 3
Final
South Jordan Fire Department final sign-off, requested by emailing sjcinspections@sjc.utah.gov — required on the Certificate of Occupancy checklist before occupancy is approved
Applies to: Plumbing Permit
- 1
Underground / Slab
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed, before walls closed — pressure test required
- 3
Final
All fixtures connected, water flowing, no leaks, proper venting verified
Applies to: Residential Addition Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar per frost depth (30 in minimum)
- 2
Framing
After framing and sheathing — before insulation or wall cover
- 3
Final
All work complete
Applies to: Retaining Wall Permit
- 1
Footing
Footing excavation, rebar, and forms before concrete pour
- 2
Backfill / Drainage
Drainage gravel, pipe, and filter fabric before backfill
- 3
Final
Wall complete, drainage functional, site graded
Applies to: Shed & Accessory Structure Permit
- 1
Foundation
Footings or slab prep before concrete pour
- 2
Framing
Structure framing, sheathing, and anchor connections
- 3
Final
Structure complete, roofing, siding, and any electrical or plumbing
Applies to: Demolition Permit
- 1
Pre-Demolition
Verify utility disconnects are complete and DEQ/SLCO clearances are in hand before work begins
- 2
Final / Site Clear
Site cleared, foundation removed or capped per approved plan
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support for the EVSE circuit.
- 2
Final
Charger mounted and energized, GFCI/breaker protection verified per NEC Article 625 (Electric Vehicle Power Transfer System).
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
Applies to: Roofing Permit
- 1
Deck / Substrate
After tear-off — verify sheathing condition and replace damaged decking before proceeding
- 2
Final
Completed roof — verify ice and water shield, flashing, drip edge, and nailing pattern
Applies to: Solar Panel Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
Final inspection only: Certificate of Occupancy / Change of Use, Fence Permit, Water Heater Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
South Jordan building permits
Get alerts for South Jordan
We'll email you when South Jordan's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.