Residential Addition Permit in South Jordan, Utah
Required for additions to existing single-family residential structures in South Jordan.
Verified 2026-06-30 · Source
When you need this permit
- Additions to existing single-family homes
- Square footage increases requiring new foundation work
- Covered porches, sunrooms, or enclosed additions
Required documents
- Req
Construction Plans
Complete drawings including floor plan, elevations, sections, and structural details for the addition
- Req
Site Plan
Property survey showing setbacks and addition footprint
- Req
Energy Compliance
REScheck or equivalent for additions affecting the building envelope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Addition (PRAD) — $0–$500 valuation | $225 | South Jordan FY 2025-2026 Fee Schedule (PRAD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF |
| Residential Addition (PRAD) — $501–$2,000 valuation | $699 | South Jordan FY 2025-2026 Fee Schedule (PRAD) |
| Residential Addition (PRAD) — $2,001–$40,000 valuation | $1,174 | South Jordan FY 2025-2026 Fee Schedule (PRAD) |
| Residential Addition (PRAD) — over $40,000 valuation | $2,293 | South Jordan FY 2025-2026 Fee Schedule (PRAD) |
| Re-inspection Fee | $168 | South Jordan FY 2025-2026 Fee Schedule |
Review timeline
~10–21 business days
Typical estimate — confirm current times with the South Jordan building department
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar per frost depth (30 in minimum)
- 2
Framing
After framing and sheathing — before insulation or wall cover
- 3
Final
All work complete
Tips
- Residential addition fees are valuation-based on 4 tiers per the FY 2025-2026 fee schedule.
- Additions in South Jordan must comply with the 2021 IRC including frost depth (30 inches) and seismic Zone D requirements.
Frequently asked questions
- How much does a residential addition permit cost in South Jordan?
- Per the South Jordan FY 2025-2026 Fee Schedule: $225 ($0–$500 valuation), $699 ($501–$2,000), $1,174 ($2,001–$40,000), or $2,293 (over $40,000).
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
- South Jordan Building Department — official building department
- South Jordan FY 2025-2026 Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Jordan
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.