Sign Permit in South Jordan, Utah
Required for installation of commercial, directional, and certain temporary signs in South Jordan.
Verified 2026-06-27 · Source
When you need this permit
- Permanent commercial signage (wall-mounted, monument, pole)
- Illuminated or electronic message signs
- Temporary signs and banners (over size/time limits)
- Directional and wayfinding signs on commercial property
Required documents
- Req
Sign Application
Sign dimensions, height, illumination, and materials
- Req
Site Plan
Sign location on property, setbacks, and visibility triangles
- Req
Electrical Plan
Required for illuminated signs — circuit, disconnect, and GFCI details
- Opt
Structural Details
Required for pole and monument signs — footing and attachment details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit | $286 | — |
| Temporary Banner/Sign Permit | $105 | — |
Review timeline
~5–14 business days
Typical estimate — confirm current times with the South Jordan building department
Inspection process
- 1
Footing/Structural
For monument and pole signs — footing and anchor bolt verification
- 2
Final
Sign installed per approved plan, electrical connections verified if illuminated
Tips
- South Jordan sign codes vary significantly by zone — commercial, residential, and mixed-use zones have different size limits.
- Electronic message centers (EMCs) are restricted in most South Jordan zones — check before ordering.
- Temporary signs (banners, A-frames) are typically allowed for limited durations without a permit — but verify with South Jordan.
- Signs in South Jordan must not obstruct sight triangles at intersections.
Frequently asked questions
- Do I need a permit for a business sign in South Jordan?
- Yes. South Jordan requires a sign permit for most permanent commercial signage. The permit ensures the sign meets size, height, setback, and illumination requirements for your zone.
- Are illuminated signs allowed in South Jordan?
- Illuminated signs are generally allowed in commercial zones in South Jordan, but electronic message centers (EMCs) and animated signs face additional restrictions. An electrical sub-permit is also required.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- South Jordan Building Department — official building department
- South Jordan FY2025-2026 Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Jordan
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.