Skip to main content
PermitBase

South Jordan building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for South Jordan, Utah.

Last verified 2026-06-30 · Source · Embed this page’s badge · Version history

Building department

Address
1600 West Towne Center Drive, South Jordan, UT 84095
Phone
(801) 446-4357
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in South Jordan — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2021 International Residential Code (IRC), including Appendix E and Q — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle. Confirmed live on the South Jordan Building Department page (sjc.utah.gov/266/Building-Department, re-fetched 2026-07-16), which lists '2021 International Residential Code (IRC), including Appendix E and Q.'
  • 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n) (residential provisions); CURRENT as of 7/1/2026. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which now lists '2024 International Swimming Pool and Spa Code (ISPSC).' Supersedes the 2021 ISPSC, which this file previously (and, post-effective-date, incorrectly) listed as current.
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026. ONE statewide edition — the statute does not split residential vs. commercial IECC editions. NOTE (2026-07-16 live re-check): South Jordan's own Building Department page currently lists these as two separate lines — 'Residential provisions of the 2021 International Energy Conservation Code' and 'Commercial provisions of the 2024 International Energy Conservation Code' — which is itself an inconsistency on the city's part (the statute has no such split and no 2021 IECC provision remains in force for any use). The single governing edition per the statute is 2024 IECC, statewide, for all uses. The prior 2021/2024 residential/commercial split is preserved below as historical/superseded city-page language only.
  • HISTORICAL (superseded 2026-07-01, city page not yet corrected as of 2026-07-16): South Jordan's page separately lists 'Residential provisions of the 2021 International Energy Conservation Code' and 'Commercial provisions of the 2024 International Energy Conservation Code' — both superseded by the single 2024 IECC edition above.
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which lists '2023 National Electrical Code (NEC).'
  • 2024 International Building Code (IBC), including Appendix J — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which now lists '2024 International Building Code (IBC), including Appendix J.' Supersedes the 2021 IBC, which this file previously listed as current.
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which now lists '2024 International Plumbing Code (IPC).' Supersedes the 2021 IPC.
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which now lists '2024 International Mechanical Code (IMC).' Supersedes the 2021 IMC.
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which now lists '2024 International Fuel Gas Code (IFGC).' Supersedes the 2021 IFGC.
  • 2024 International Existing Building Code (IEBC), subject to HUD and IRC Appendix E — Utah Code § 15A-2-103(1)(i); CURRENT as of 7/1/2026. Confirmed live on the South Jordan Building Department page (re-fetched 2026-07-16), which now lists '2024 International Existing Building Code (subject to HUD and IRC Appendix E).' Supersedes the 2021 IEBC, which this file previously listed as current.
  • ICC/ANSI A117.1-2009 — South Jordan Building Department, sjc.utah.gov/266/Building-Department (re-confirmed live 2026-07-16, unchanged)
  • Applicable Utah State Amendments — Utah Code Title 15A
  • NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions of IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC as current, with a forward-looking NOTE that South Jordan's page 'has not yet been updated.' Re-fetched live 2026-07-16 via browser: South Jordan's Building Department page HAS since been updated by the city to display 2024 IBC/IPC/IMC/IFGC/IEBC/ISPSC verbatim (plus unchanged 2021 IRC and 2023 NEC) — South Jordan is essentially current with the statewide mandate, with the sole exception of its uncorrected residential/commercial IECC split noted above. The International Fire Code (IFC) is not adopted anywhere in Utah Code § 15A-2-103 and is not listed on South Jordan's page either.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
36units

36 buildings · $8.6M valuation

Trailing 12 months
749units

12 of 12 months reported · #13 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
280units

261 buildings · $64.7M valuation

5 month(s) reported to Census

Full year 2025
754units

531 buildings · $170.2M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • SEED URL CORRECTED: The registry seed URL (sjc.utah.gov/community-development/building/) returns 404. The correct building department URL is https://www.sjc.utah.gov/266/Building-Department (200 OK, verified 2026-06-30).
  • RE-VERIFIED LIVE 2026-07-16: South Jordan's building page, which as of 2026-06-30 still listed 2021 editions, has since been updated by the city to show 2024 IBC/IPC/IMC/IFGC/IEBC/ISPSC (current per Utah Code § 15A-2-103), with IRC remaining 2021 and NEC remaining 2023 — matching the statute. The one uncorrected exception: the city's page still splits IECC into 'Residential provisions of the 2021 IECC' and 'Commercial provisions of the 2024 IECC,' even though the statute adopts a single 2024 IECC edition statewide with no such split — this JSON records the single 2024 edition as governing and flags the city's own page inconsistency rather than propagating it.
  • NEC CORRECTED: Old file listed 2020 NEC — South Jordan's building page explicitly lists 2023 NEC.
  • South Jordan uses the CityView online portal for all permit applications and inspection scheduling: cityview.southjordanutah.gov/CityViewPortal.
  • Work commenced before obtaining a permit is subject to DOUBLE the applicable permit fee per the fee schedule.
  • South Jordan's frost depth is 30 inches minimum from bottom of footing to finished grade — stated explicitly in design criteria on the building page.
  • Seismic Zone D applies in South Jordan; wind load is 115 mph, Exposure C (per South Jordan design criteria).
  • Demolition permits require pre-demolition approval from both Utah DEQ and Salt Lake County Health Department — these approval certificates must be submitted with the application.
  • Impact fees (fire, police, water, storm water) are separate from building permit fees — see the Combined City Impact Fee Schedule (Ord. 2024-05) at sjc.utah.gov/DocumentCenter/View/4513/Combined-City-Impact-Fee-Schedule-Updated-102325.
  • OMITTED types and recovery: fire sprinkler/alarm (fire dept inspection fees only listed, $50 residential/$135 commercial — not a standalone building permit type; building page references NFPA 13D but fee not in building permit fee schedule); grading/excavation (land disturbance fee listed at $157 but no grading permit in the building permit section); home occupation ($53 new/$25 renewal — business license not a building permit); sign permit (planning fee $286/$105 temp — not a core residential building permit). These were omitted from permit types as they are either fire dept fees, non-building permits, or outside the residential permit scope.

Comparable nearby cities

Herriman
Both in Salt Lake County16 shared permit typesBoth on the Applicable Utah State Amendments~5 mi away
Compare fees →
West Jordan
Both in Salt Lake County16 shared permit types~3 mi away
Compare fees →
Draper
Both in Salt Lake County16 shared permit types~8 mi away
Compare fees →