Electrical Permit in South Jordan, Utah
Required for electrical work including panel upgrades, new circuits, rewiring, and service changes in South Jordan. Governed by the 2023 National Electrical Code (NEC). EV charger/EVSE installation (e.g., a dedicated 240V circuit) is electrical work and falls under this general Electrical Permit; the FY 2026-2027 Fee Schedule does not publish an EV-specific line item.
Verified 2026-07-11 · Source
When you need this permit
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
See the full South Jordan inspection guide — scheduling & re-inspection fees →
Tips
- All electrical work in South Jordan must comply with the 2023 National Electrical Code (NEC) as listed on the South Jordan Building Department page.
- Utah allows homeowners to perform electrical work on their own primary residence, but a permit and all required inspections are still mandatory.
- AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC.
- GFCI protection is required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
- EV charger / EVSE installations (including new 240V circuits) are permitted under this standard Electrical Permit — South Jordan does not publish a distinct EV-charger permit or fee as of 2026-07-19.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-11.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in South Jordan
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →