Residential Building Permit — South Jordan, Utah · Requirements sheet
Verified 2026-07-11 · Source: https://www.sjc.utah.gov/266/Building-Department
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in South Jordan, Utah
Required for new residential construction and structural alterations in South Jordan. Separate flat-fee tiers apply for single-family detached and attached homes.
Verified 2026-07-11 · Source
When you need this permit
- New single-family detached or attached residential construction
- Additions and structural alterations
- Conversion of non-habitable to habitable space
- Any work requiring plan review under the adopted 2021 IRC/IBC
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
South Jordan FY 2026-2027 Fee Schedule (PRSFD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF (document at this URL rolled over to the FY26-27 schedule; Show full citationHide
South Jordan FY 2026-2027 Fee Schedule (PRSFD), sjc.utah.gov/DocumentCenter/View/5594/FY-25-26-Fee-Schedule-PDF (document at this URL rolled over to the FY26-27 schedule; confirmed by direct PDF render, page 2). Any person who commences work before obtaining a permit is subject to double the permit fee.Review timeline
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
See the full South Jordan inspection guide — scheduling & re-inspection fees →
Tips
- Apply for permits online at cityview.southjordanutah.gov/CityViewPortal.
- South Jordan's frost depth is 30 inches minimum from bottom of footing to finished grade (stated on South Jordan's design criteria).
- Seismic Zone D applies — structural design must account for seismic loads.
- Wind load: 115 mph, Exposure C (per South Jordan design criteria).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-11.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
South Jordan's permit history is searchable by address
25,491 permits in our copy of South Jordan's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything South Jordan has issued.
All 25,491 carry an issued date, running from 2016 to 2026.
98% of South Jordan's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in South Jordan
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your South Jordan project checklist
Describe your project once and get every permit, document, and fee it triggers in South Jordan — in one checklist. Free, for any city and any number of projects.
Get started →