Certificate of Occupancy in Spanish Fork, Utah
Required before any new or altered building may be legally used or occupied in Spanish Fork. Governed by Spanish Fork Municipal Code § 14.04.030, which sets the conditions for issuance and for a discretionary temporary certificate of occupancy. Spanish Fork does not publish a distinct 'change of use' permit application separate from the underlying building permit; a change in a building's occupancy classification (e.g., converting a warehouse to retail or office space) is processed through the standard Commercial Building Permit or Commercial Tenant Improvement Permit under the adopted 2024 IBC.
Verified 2026-07-22 · Source
When you need this permit
- Completion and passing of the Final inspection on the underlying building permit before use or occupancy, per Spanish Fork's Inspections page
- Roadbase, curb, gutter, and graveled driveways related to the premises installed by the contractor or developer and approved by the City — a certificate of occupancy cannot be granted until this is met, per Spanish Fork Municipal Code § 14.04.030(B)
- All terms and conditions of the building permit satisfied so that the construction cash deposit (where one was collected) can be refunded upon certificate of occupancy issuance, per § 14.04.030(C)
- Compliance with all applicable land use, zoning, and building code provisions before the Building Official will grant a certificate of occupancy
- For a change in occupancy classification within an existing building rather than new construction: apply through the standard Commercial Building Permit or Commercial Tenant Improvement Permit process, since Spanish Fork has no separate 'change of use' or 'change of occupancy' permit application — occupancy-classification changes are governed by the adopted 2024 IBC (Utah Code § 15A-2-103(1)(a))
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
Completed building or structure verified prior to use or occupancy, per Spanish Fork's Inspections page. Passing this inspection, together with satisfying § 14.04.030(B)'s roadbase/curb/gutter/driveway requirement, triggers certificate-of-occupancy issuance.
See the full Spanish Fork inspection guide — scheduling & re-inspection fees →
Tips
- Spanish Fork does not publish a certificate of occupancy as a standalone CitizenServe permit application separate from the underlying building permit — CO issuance is the concluding step of the building permit process once the Final inspection passes and § 14.04.030(B)'s site-improvement conditions (roadbase, curb, gutter, graveled driveways) are met.
- A temporary certificate of occupancy is available at the Building Official's discretion when there are no life-threatening hazards and only minor final-checklist items remain — § 14.04.030(D). The $120 Temporary Certificate fee applies, and the construction deposit is refunded only once a FINAL certificate of occupancy (not temporary) is obtained.
- If a temporary certificate of occupancy expires before a final certificate is obtained, the City may disconnect all utility service to the property, per § 14.04.030(D).
- Spanish Fork has no separate 'change of use' or 'change of occupancy' permit — a change in an existing building's occupancy classification (e.g., warehouse to retail) is processed through the standard Commercial Building Permit or Commercial Tenant Improvement Permit already covered elsewhere in this file, under the adopted 2024 IBC.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Spanish Fork building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Spanish Fork
Certificate of Occupancy in other cities
Compare certificate of occupancy fees across Utah →
Look up this fee in a different city →
Now live
Build your Spanish Fork project checklist
Describe your project once and get every permit, document, and fee it triggers in Spanish Fork — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →