Skip to main content
PermitBase

Plumbing Permit in Spanish Fork, Utah

Required for plumbing installations, alterations, and repairs in Spanish Fork including water heaters, fixture additions, and gas line work. Governed by the 2024 IPC, current statewide as of 07/01/2026 per Utah Code § 15A-2-103(1)(d) (the 2021 IPC governed through 06/30/2026).

Verified 2026-07-01 · Source

When you need this permit

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement (including like-for-like swaps)
  • Water and sewer lateral repairs (listed in Spanish Fork permits FAQ)
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing PermitGrounded: Spanish Fork Municipal Code § 14.12.010 adopts the plumbing code under Title 14 Buildings and Construction, and § 14.04.020 establishes that ALL building-related fees are set by City Council resolution/annual budget — the FY2026 fees.php schedule IS the authoritative fee list, which publishes only one building-permit valuation line ('Building Permit — As set by 2021 IRC') with no separate plumbing trade-permit rate. Cited: Title 14 PDF (cms.spanishfork.org) § 14.04.020, § 14.12.010; fees.php FY2026.
As set by 2021 IRC/IBC valuation table (same general Building Permit fee — no separate flat plumbing sub-permit rate is published)
Building Re-inspectionSpanish Fork Building Fees page, FY2026 (effective 07/01/2025–06/30/2026).
$132 flat fee per trip

Review timeline

Plan reviewTypical estimate — confirm current times with the Spanish Fork building department
~3–7 business days

How long did your Plumbing Permit permit actually take in Spanish Fork?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground / Under-Slab Plumbing

    Before burial or concrete covering. Minimum 5 PSI air test or 5-foot head of water for 15 minutes.

  2. 2

    Sewer Lateral

    Filled with water to not less than 10-foot head; maintained for 15 minutes. Sewer test plug removed with inspector on-site to verify flow.

  3. 3

    Water Lateral

    Minimum 1-inch size, 36-inch minimum depth.

  4. 4

    Rough-In (in 4-way for new construction)

    Roughed-in plumbing included in 4-way inspection for new construction — before walls closed.

  5. 5

    Shower Pan

    Pan filled with water to minimum 2 inches at threshold; 15-minute test duration.

  6. 6

    Final

    All fixtures connected, water flowing, no leaks, proper venting verified.

See the full Spanish Fork inspection guide — scheduling & re-inspection fees →

Tips

  • Water heater replacements require a permit even for like-for-like swaps — the city's FAQ lists water heaters as permit-required.
  • Spanish Fork follows the 2024 IPC, current statewide as of 07/01/2026 (the 2021 IPC governed through 06/30/2026; note the city's own Design Criteria page still listed 2021 IPC as of a 2026-07-16 live check).
  • Sewer laterals require a witnessed flow test — the inspector must be on-site when the test plug is removed.
  • Gas line work requires a separate gas line pressure test (3 PSI minimum), scheduled independently from the 4-way.

Frequently asked questions

Yes. Spanish Fork explicitly lists water heater change-outs as permit-required. Apply via CitizenServe or call (801) 804-4540.

Spanish Fork's FY2026 fee schedule does not list a separate flat plumbing permit fee. Contact the building department at (801) 804-4540 for the current fee. Re-inspection costs $132 per trip.

Plan review for a plumbing permit in Spanish Fork typically runs 3–7 business days. This is an estimate, not a published figure — confirm current review times with Spanish Fork City Building Department at (801) 804-4540.

You'll need: Permit Application via CitizenServe. Depending on your project, Spanish Fork may also ask for: Plumbing Plan; Contractor License. See the required-documents checklist on this page for details on each.

Spanish Fork requires 6 inspection(s) for a plumbing permit, in order: Underground / Under-Slab Plumbing, Sewer Lateral, Water Lateral, Rough-In (in 4-way for new construction), Shower Pan, Final. Schedule each through Spanish Fork City Building Department ((801) 804-4540).

Apply through Spanish Fork City Building Department at 40 S Main St, Room 120, Spanish Fork, UT 84660. Phone: (801) 804-4540, email: twilliams@spanishfork.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.spanishfork.gov/departments/community_development/building/index.php.

Spanish Fork, Utah has adopted: 2024 International Building Code (IBC) with Utah Amendments — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026 (confirmed by direct fetch of the live statute 2026-07-16). Supersedes the 2021 IBC, which governed through 6/30/2026. NOTE (2026-07-16 city-page lag): Spanish Fork's own Design Criteria page (spanishfork.gov/departments/community_development/building/design_criteria.php), live-checked via browser 2026-07-16, still lists 'IBC 2021 Int'l Bldg Code w/UT Amendments' verbatim — the city's page has NOT been updated to reflect the 7/1/2026 statewide flip. The statute controls regardless of the city page's lag.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle. Matches Spanish Fork's Design Criteria page (live-checked 2026-07-16: 'IRC 2021 Int'l Residential Code').; Appendix AQ of the 2021 International Residential Code — Utah Code § 15A-2-103(1)(c) (confirmed by direct fetch of the live statute 2026-07-16; not independently listed on Spanish Fork's Design Criteria page).; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026. NOTE (2026-07-16 city-page lag): Spanish Fork's Design Criteria page still lists 'IPC 2021 Plumbing' — the statute controls.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026. NOTE (2026-07-16 city-page lag): Spanish Fork's Design Criteria page still lists 'IMC 2021 Mechanical' — the statute controls.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026. NOTE (2026-07-16 city-page lag): Spanish Fork's Design Criteria page still lists 'IFGC 2021 Fuel Gas Code' — the statute controls.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle. Matches Spanish Fork's Design Criteria page (live-checked 2026-07-16: 'NEC 2023 Commercial Electrical').; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). ONE statewide edition — no residential/commercial split. Supersedes the 2021 IECC, which governed through 6/30/2026. NOTE (2026-07-16 city-page lag): Spanish Fork's Design Criteria page still lists 'IECC 2021 Energy' — the statute controls.; 2021 International Fire Code (IFC) — local citation only, per Spanish Fork's Design Criteria page (live-checked 2026-07-16: 'IFC 2021 National Fire'). CORRECTION (2026-07-16): a prior version of this file cited Utah Code § 15A-2-103(1)(c) for this entry — that is WRONG; §15A-2-103 does NOT adopt the IFC at all (its statute text has no IFC subsection; subsection (c) actually adopts Appendix AQ of the 2021 IRC, listed separately above). The IFC edition is left unchanged here since §15A-2-103 provides no statewide IFC edition to supersede it.; ICC/ANSI A117.1-2009 (ADA/Accessibility) — Spanish Fork Design Criteria page (live-checked 2026-07-16, unchanged).; NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions of IBC/IPC/IMC/IFGC/IECC as current with only a forward-looking mention of the 7/1/2026 flip; that effective date has now passed. A live browser fetch of Spanish Fork's Design Criteria page on 2026-07-16 confirms the city itself has NOT updated its page — it still displays 2021 for IBC/IECC/IFC/IMC/IPC/IFGC verbatim (NEC correctly remains 2023). Because Utah is a statewide-mandatory-code state under Utah Code § 15A-2-103 (per Utah Code § 15A-1-204, binding the state and every political subdivision), the statute controls regardless of the city page's lag, so the entries above state the 2024 editions as current for IBC/IPC/IMC/IFGC/IECC. IRC (2021) and NEC (2023) are correctly unchanged on both the statute and the (otherwise stale) city page.. Local amendments apply — see the Spanish Fork overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Spanish Fork building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.