Electrical Permit in St. George, Utah

Required for electrical work in St. George including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted by Utah Code § 15A-2-103(1)(g). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the city's Building Fee Sheet and Building Department page do not publish a separate EV-specific line item or process.

Verified 2026-07-23 · Source

When you need this permit

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical PermitAssessed on project valuation per St. George's published 1997 UBC building permit fee schedule (sgcityutah.gov Building Fee Sheet PDF, re-fetched and confirmed live 2026-07-01) — no separate per-circuit or flat-fee electrical schedule is published by the city; the valuation table itself is the grounded fee. Minimum permit $60.60; plan check 65%; D.O.C. surcharge 1%.
Valuation-based per the 1997 Uniform Building Code fee scale (same tiers as residential building permit above)
Minimum PermitSt. George Building Fee Sheet
$60.60
Reinspection FeeSt. George City Impact Fees document (effective 4/21/21)
$47.00 per hour (minimum one-half hour)

Review timeline

Plan reviewTypical estimate — confirm current times with the St. George building department
~3–10 business days

How long did your Electrical Permit permit actually take in St. George?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, and proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors

  3. 3

    Final

    All devices installed, GFCI/AFCI protection verified, panel labeled

See the full St. George inspection guide — scheduling & re-inspection fees →

Tips

  • All electrical work in St. George must comply with the 2023 National Electrical Code (NEC), adopted statewide by Utah Code § 15A-2-103(1)(g).
  • Utah allows homeowners to perform electrical work on their own primary residence, but a permit from St. George and all required inspections are still mandatory.
  • AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC.
  • GFCI protection is required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
  • EV charger / EVSE installations are permitted as standard electrical work under this permit — St. George does not publish a distinct EV-charger permit or fee as of 2026-07-19.

Frequently asked questions

Yes. St. George requires an electrical permit for any new wiring, circuits, panel upgrades, or service changes. Minor repairs such as replacing a switch or outlet in kind typically do not require a permit — confirm with the Building Department at (435) 627-4100.

St. George electrical permits are valuation-based using the 1997 UBC fee scale (same tiers as building permits). The minimum permit is $60.60. Plan check is 65% of the permit fee, plus a 1% D.O.C. surcharge. There is no published separate flat-fee electrical schedule in St. George.

Plan review for an electrical permit in St. George typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with St. George Building Department at (435) 627-4100.

You'll need: Permit Application (CityInspect). Depending on your project, St. George may also ask for: Electrical Plan / Single-Line Diagram; Contractor License. See the required-documents checklist on this page for details on each.

St. George requires 3 inspection(s) for an electrical permit, in order: Rough-In, Service / Panel, Final. Schedule each through St. George Building Department ((435) 627-4100).

Apply through St. George Building Department at 61 S Main St, St. George, UT 84770. Phone: (435) 627-4100, email: building@sgcity.org. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://sgcityutah.gov/departments/community_development/building_department.php.

St. George, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); CURRENT as of 7/1/2026 (statute version headed 'Effective 7/1/2026 (Superseded 1/1/2027)', confirmed by direct fetch 2026-07-16). Supersedes the 2021 IBC, which governed through 6/30/2026.; 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); UNCHANGED by the 7/1/2026 code cycle — remains 2021 and continues in force (confirmed by direct statute fetch 2026-07-16).; Appendix AQ of the 2021 International Residential Code — Utah Code § 15A-2-103(1)(c) (confirmed by direct statute fetch 2026-07-16).; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IPC, which governed through 6/30/2026.; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IMC, which governed through 6/30/2026.; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IFGC, which governed through 6/30/2026.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 code cycle — remains 2023 (confirmed by direct statute fetch 2026-07-16).; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). ONE statewide edition — the statute does not split residential vs. commercial IECC editions. Supersedes the 2021 IECC, which governed through 6/30/2026.; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 IEBC, which governed through 6/30/2026.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); CURRENT as of 7/1/2026 (confirmed by direct statute fetch 2026-07-16). Supersedes the 2021 ISPSC, which governed through 6/30/2026.; NOTE (2026-07-16 corpus-staleness fix): This file previously stated the 2021 editions as current and only forecasted the 7/1/2026 flip; the effective date has now passed and the entries above have been corrected to state the 2024 editions (per §15A-2-103(1)(a)/(d)/(e)/(f)/(h)/(i)/(n)) as current, with the superseded 2021 editions preserved as historical context. IRC (2021) and NEC (2023) were NOT changed — verified unchanged directly against the live statute. The International Fire Code (IFC) is NOT adopted anywhere in Utah Code § 15A-2-103 — the statute has no IFC subsection; St. George's own building department page does not independently cite an IFC edition, so no IFC entry appears in this list.. Local amendments apply — see the St. George overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the St. George building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.