Skip to main content
PermitBase

Unincorporated Washington County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Washington County, Utah.

Last verified 2026-07-01 · Source · Embed this page’s badge · Version history

Building department

Address
111 East Tabernacle St., St. George, UT 84770
Phone
(435) 301-7250
Email
Office hours
Mon–Fri, normal business hours (24-hour advance notice required for inspections)

Inspection guide

See how inspections work in Unincorporated Washington County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); REMAINS CURRENT, UNCHANGED by the 7/1/2026 amendment
  • Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on any Washington County page found, added here per statute
  • 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here
  • 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here
  • 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition previously listed here
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); UNCHANGED by the 7/1/2026 amendment (NOTE: Washington County's own website has been observed referencing 2020 NEC on older pages; the legally in-force statewide edition is 2023 NEC — no county page is known to have been updated to reflect this)
  • 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here
  • 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition previously listed here
  • Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition previously listed here
  • MBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized on any Washington County page found, added here per statute
  • NOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('effective through June 30, 2026' / 'takes effect July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024 editions), while IRC (2021) and NEC (2023) remain unchanged as already correctly stated. No Washington County page listing IBC/IRC/IPC/IMC/IECC editions specifically was found on live re-check of the Community Development FAQ and Building Permit Documents pages (2026-07-16), so there is no city-page lag to record for those codes beyond the pre-existing NEC observation above.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
277units

214 buildings · $50.3M valuation

Trailing 12 months
2,839units

12 of 12 months reported · #4 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
1,277units

1,019 buildings · $278.7M valuation

Full year 2025
2,857units

2,528 buildings · $656M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities; county file row: 'Washington County' (co2605c.txt, 49/053); place file also carries 'Washington County Unincorporated Area' (place code 99990) as a possible Phase-1 alternative

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Washington County Community Development only accepts building permit applications electronically through outpost.washco.utah.gov — paper applications are not accepted.
  • 24-hour advance notice is required after work is completed and ready for inspection. A permit number is required when scheduling inspections.
  • WARNING — URL CORRECTION: The registry seed URL (washco.utah.gov/departments/building/) resolves to 'Building Maintenance,' a different county department that maintains county-owned buildings. The correct permit-issuing department is Community Development at washco.utah.gov/departments/community-development/.
  • The county's published fee schedule (washco.utah.gov/departments/community-development/fees/) does not list separate electrical, plumbing, mechanical, roofing, solar, or demolition trade permit fee tiers. All of these permit types are assessed on the same valuation-based building permit table (confirmed grounded, not a gap) — contact (435) 301-7250 if you need help estimating a specific project's valuation.
  • Washington County's website references '2020 NEC' on older pages; the legally in-force statewide edition is the 2023 NEC per Utah Code § 15A-2-103(1)(g). All electrical work is inspected to the 2023 NEC standard.
  • Washington County requires a covered dumpster (4-yard capacity with lid) AND a portable sanitary facility at all active construction sites — failure to have these on-site may delay inspections.
  • Fire special service district impact fees must be paid and a receipt submitted before a building permit is issued — confirm the applicable district with Community Development.
  • All ADUs in unincorporated Washington County require a 25-foot minimum setback on all sides (not the typical 5-foot setback for other accessory structures).
  • Properties in unincorporated Washington County require septic approval from the Southwest Utah Public Health Department before a building permit is issued — this is a prerequisite, not just a document.
  • No email address for Community Development is published on the official washco.utah.gov website — contact via phone (435) 301-7250 or the online message form at washco.utah.gov/departments/community-development/contact-info/.

Comparable nearby cities

St. George
Both in Washington County14 shared permit types
Compare fees →
Washington City
Both in Washington County11 shared permit types
Compare fees →
Ivins
Both in Washington County8 shared permit types
Compare fees →