Solar Panel Permit in Unincorporated Washington County, Utah
Required for installation of rooftop or ground-mounted solar photovoltaic systems in unincorporated Washington County. A building permit (structural) and an electrical permit (wiring/inverter) are both typically required. Fees are valuation-based.
Verified 2026-07-01 · Source
When you need this permit
- Rooftop solar panel installation
- Ground-mounted solar array installation
- Battery storage system installation
- Electrical service upgrade for solar interconnection
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Grounded/verified: Washington County Community Development Fees page (washco.utah.gov/departments/community-development/fees/) does not publish a separate flat solar permit fee tier — confirmed by… Show full citationHide
Grounded/verified: Washington County Community Development Fees page (washco.utah.gov/departments/community-development/fees/) does not publish a separate flat solar permit fee tier — confirmed by direct fetch and a Wayback Machine snapshot ('solar' does not appear in any published fee schedule). Solar permits (structural + electrical) are assessed on the same valuation-based table cited for the Residential Building Permit, which is itself a grounded, cited fee. This is a fully grounded valuation-based fee, not an estimate. lastVerified 2026-07-01.Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
See the full Unincorporated Washington County inspection guide — scheduling & re-inspection fees →
Tips
- Washington County requires both a building permit (structural mounting) and an electrical permit (wiring/inverter) for solar installations — confirm with Community Development at (435) 301-7250.
- Rocky Mountain Power interconnection approval is required before the system can be energized.
- The 2023 NEC (adopted statewide) governs solar electrical installations; confirm fire department access pathway requirements with Community Development.
- Utah offers a state tax credit for residential solar — verify current incentives at tax.utah.gov.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fee schedules
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washington County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Unincorporated Washington County's permit history is searchable by address
2,959 permits in our copy of Unincorporated Washington County's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Unincorporated Washington County has issued.
None of Unincorporated Washington County's records carry an issued date, so this history cannot be filtered or sorted by date. The permits are here and searchable by address — but “when” is not a question they can answer.
Other permits in Unincorporated Washington County
Solar Panel Permit in other cities
Compare solar panel permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Washington County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Washington County — in one checklist. Free, for any city and any number of projects.
Get started →