Commercial Building Permit — Unincorporated Washington County, Utah · Requirements sheet
Reviewed 2026-07-19 · Source: https://www.washco.utah.gov/departments/community-development/fees/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Unincorporated Washington County, Utah
Required for new commercial construction on unincorporated land in Washington County, regulated by the 2024 IBC (current statewide per Utah Code § 15A-2-103, effective 7/1/2026). Washington County Community Development administers a dedicated commercial application intake (outpost.washco.utah.gov/apps/community-development/building-permit/commercial.php, which routes to the county's CivicReview-hosted commercial application form), separate from its residential application portal, though the published fee schedule itself uses the same generic 1997 UBC valuation table for all building permits with no residential/commercial split.
Reviewed 2026-07-19 · Source
When you need this permit
- New commercial construction on unincorporated county land, regulated by the 2024 IBC (Utah Code § 15A-2-103(1)(a))
- Application submitted electronically through the county's dedicated commercial building-permit intake (outpost.washco.utah.gov/apps/community-development/building-permit/commercial.php) — paper applications are not accepted, per the county's electronic-only submission policy
- Project valuation stated on the application, used to calculate the Building Permit fee under the county's 1997 UBC valuation table
- Special inspections as required for the scope of work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Standard IBC inspection sequence before concrete pour.
- 2
Structural / Framing
Framing and structural elements verified against submitted plans before close-in.
- 3
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 4
Final
All work complete before occupancy.
See the full Unincorporated Washington County inspection guide — scheduling & re-inspection fees →
Tips
- Washington County maintains a separate application intake URL for commercial permits (outpost.washco.utah.gov/apps/community-development/building-permit/commercial.php) distinct from the residential portal, even though the published fee schedule itself does not distinguish commercial from residential valuation.
- Unlike St. George (Plan Check 65%) or Ivins (Plan Check 10%), Washington County's Community Development Fees page does not publish any plan-check percentage at all — confirm plan-review costs directly with the department, (435) 301-7250, rather than assuming either neighboring rate applies.
- Most of the county's published Building Permit Documents (Homeowner/Builder Certification, Geotechnical Report, Culvert Letter, Floodplain Development Permit, etc.) are explicitly scoped to single-family dwellings and accessory dwellings per the department's own page text — commercial applicants should confirm which of these still apply to their project directly with Community Development. Owner-builder
- Signs are NOT covered by a distinct fee line item: Washington County's Community Development Fees page (washco.utah.gov/departments/community-development/fees/, live-checked 2026-07-20) publishes no separate sign-permit fee anywhere in its valuation-based building-permit table or its flat-fee lines (pool $300, manufactured home $400, special inspections $100/hr) — the word 'sign' does not appear on the fee schedule at all. Washington County Code does maintain a dedicated sign ordinance (Title 10, Chapter 19, referenced in secondary planning documents for zone-specific sign standards such as the Pine Valley Overlay Zone), but no distinct sign PERMIT fee is published separately from the standard valuation-based building-permit fee documented in this jurisdiction's residential-building-permit and commercial-building-permit entries — confirm with Community Development, (435) 301-7250, which fee tier applies to a specific sign project.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washington County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Washington County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated Washington County
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Washington County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Washington County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →