Unincorporated Washington County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Washington County, Utah.
Verified 2026-07-01 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 111 East Tabernacle St., St. George, UT 84770
- Phone
- (435) 301-7250
- Office hours
- Mon–Fri, normal business hours (24-hour advance notice required for inspections)
- Website
- Official site
Published scheduling rules
- 24-hour advance notice is required after work is completed and ready for inspection. A permit number is required when scheduling inspections. (General)
Inspection sequence
Applies to: Accessory Dwelling Unit (ADU)
- 1
Foundation
Footings, forms, rebar — before concrete pour
- 2
Framing
Structure, fire separation, egress windows
- 3
MEP Rough-In
Mechanical, electrical, plumbing rough-ins before walls closed
- 4
Insulation
Insulation and vapor barrier before drywall
- 5
Final
All work complete, smoke/CO detectors, address posted, ready for occupancy
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Standard IBC inspection sequence before concrete pour.
- 2
Structural / Framing
Framing and structural elements verified against submitted plans before close-in.
- 3
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 4
Final
All work complete before occupancy.
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing, sheathing, and rough-in MEP — before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete — certificate of occupancy issued upon passing
Applies to: Swimming Pool Permit
- 1
Excavation / Steel
Pool shell excavation, rebar, and plumbing before gunite/shotcrete
- 2
Electrical / Bonding
Pool bonding grid, equipment connections, GFCI protection per NEC Article 680
- 3
Barrier
Pool fence/barrier — 48-inch minimum height, self-closing/self-latching gates required
- 4
Final
Pool complete, filled, equipment operational, all barriers in place
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Structural (if applicable)
Wall construction and any structural modifications verified before close-in, where applicable to the scope of work.
- 2
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 3
Final
All work complete before occupancy.
Applies to: Electrical Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Service / Panel
Panel installation, grounding electrode system, service entrance conductors
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled
Applies to: Plumbing Permit
- 1
Underground / Slab
Before concrete pour — verify pipe slope, materials, and cleanouts
- 2
Rough-In
After pipes installed, before walls closed — pressure test required
- 3
Final
All fixtures connected, water flowing, no leaks, proper venting verified
Applies to: Demolition Permit
- 1
Pre-Demolition
Verify utility disconnects complete and any required asbestos clearance obtained before work begins
- 2
Final / Site Clear
Site cleared, foundation removed or capped, site conditions verified
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
After wiring installed, before walls closed — verify box placement, wire sizing, proper support
- 2
Final
Charger installed and operational, GFCI/AFCI protection verified where required, panel labeled
Applies to: Fire Sprinkler & Fire Alarm System Permit
- 1
Sprinkler System Flush, Rough-In, and Acceptance Test
Bundled into HVFSSD's single Sprinkler System fee ($1,175.00 commercial / $950.00 residential), which also includes the plan review and, for residential, final occupancy.
- 2
Fire Alarm Inspection and Acceptance Test
Bundled into HVFSSD's single $350.00 per-system Fire Alarm fee, which also includes the plan review.
Applies to: Manufactured Home Permit
- 1
Foundation / Setup
Foundation or blocking system, tie-downs/anchoring, and utility connections before occupancy
- 2
Final
All utilities connected, skirting in place, site complete
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and gas piping installed, before walls closed — verify clearances and support
- 2
Final
Equipment operational, combustion air verified, gas pressure tested, thermostat functional
Applies to: Roofing Permit
- 1
Deck / Substrate
After tear-off — verify sheathing condition and replace damaged decking before proceeding
- 2
Final
Completed roof — verify ice and water shield, flashing, drip edge, and nailing pattern
Applies to: Solar Panel Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final / Structural
Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified
Final inspection only: Change of Use / Certificate of Occupancy Permit, Sign Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Washington County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Washington County building permits
Get alerts for Unincorporated Washington County
We'll email you when Unincorporated Washington County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.