This is PermitBase’s published record for North Ogden as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
North Ogden building permits
VerifiedNorth Ogden, Utah — as published 2026-07-07.
Verified 2026-07-07 · Source
Codes adopted
Permit types & fees
Residential/Commercial Building Permit
VerifiedRequired for new construction, additions, remodels, repairs, re-roofing/siding, electrical remodeling, plumbing replacement, and furnace/AC replacement in North Ogden. Both the Single-Family Residential Permit and Commercial Building Permit fee are valuation-based, calculated per the 1997 Uniform Building Code Section 107.2 Table 1-A plus 20%, per the city's official Consolidated Fee Schedule (Resolution 03-2026, adopted January 13, 2026, effective January 13, 2026).
Verified 2026-07-07 · Source
Requirements
- New construction, additions, remodels, and repairs including re-roofing/siding, electrical remodeling, plumbing replacement, furnace/AC replacement
- Commercial structures, additions to or structural remodels of commercial buildings, and non-structural commercial remodels over 3,000 sq ft require a stamp/seal by a State-licensed professional
- Residential Plan Check Fee Deposit of $500.00, or Commercial Plan Check Fee Deposit of $1,000.00, due at submittal
Required documents
- RequiredBuilding Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal (cityofnorthogden.portal.iworq.net).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Single-Family Residential Permit and Commercial Building Permit Fee | Valuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20% | North Ogden City Consolidated Fee Schedule, Resolution 03-2026 (adopted/effective January 13, 2026), Building Department § Building Permit Fees: 'Single-Family Residential Permit and Commercial Building Permit Fees ... 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%.' North Ogden does not publish its own flat valuation table; the 1997 UBC Table 1-A (plus a 20% surcharge) is the governing figure. |
| Residential Plan Check Fee Deposit | $500.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Commercial Plan Check Fee Deposit | $1,000.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Single-Family Residential Plan Check | 50% of Permit Fee | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Commercial Building Plan Check | 65% of Permit Fee | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| State Fee | 1% of Permit Fee | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Minimum Building Permit Fee | $56.40 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Re-inspection Fee | $56.40 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| After-Hours/Emergency Inspection | $125.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Temporary Power Inspection | $56.40 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Stop Work (Red Tag) — Failure to Obtain a Building Permit | $250.00 first offense, $1,000.00 each additional offense (regardless of project type, unless emergency-related) | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Deposit for Off-Site Improvements (all new construction) | $1,000.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
| Impact Fees (single-family residential, illustrative components) | Storm Water $2,186.49; Water $6,273.70; Sewer $873.20; Sewer (CWSID) $3,537.00; Parks $6,017.26; Public Safety $388.93; Transportation $2,297.37; Fire $477.85 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Impact Fee Summary (page 13-14). Multi-family and 'Additional Dwelling Unit (ADU)' rows in the same table publish different, lower per-unit or per-square-foot rates (e.g., ADU Water $4,893.50, ADU Sewer $681.10, ADU Fire $236.53, ADU Transportation $915.19) — these are impact-fee-schedule tiers by dwelling type, not a separate 'ADU permit' application fee. |
Land Use Permit
North Ogden's Consolidated Fee Schedule publishes a single flat 'Land Use Permits' fee under the Planning Department section, distinct from the valuation-based Building Permit Fee. The city's official published sources do not break this category down into named sub-types (e.g., fence, shed, deck, retaining wall) the way some neighboring Utah cities' fee schedules do — it is published as one line item.
Reviewed 2026-07-07 · Source
Requirements
- Applies to land-use-related permits reviewed by the Planning Department, submitted via the iWorQ online portal (cityofnorthogdenhome.portal.iworq.net)
- The city's official Applications and Forms pages route all Planning and Zoning permit types through the iWorQ portal rather than publishing individually named PDF applications for accessory structures
Required documents
- RequiredLand Use Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal for Planning and Zoning (cityofnorthogdenhome.portal.iworq.net/portalhome/cityofnorthogdenhome).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Land Use Permits | $40.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026 (adopted/effective January 13, 2026), Planning Department section: 'Land Use Permits ... $40.00.' This is the only Planning-Department-level permit fee published as a flat, non-valuation-based amount besides the Zoning Verification Letter ($25.00) and Re-build Letter ($25.00). |
Excavation, Grading, and Road Cut Permits
VerifiedNorth Ogden requires separate permits and fees for excavation, grading, blasting, and road cuts, published in the Building Department section of the Consolidated Fee Schedule. These are distinct from the general Building Permit Fee.
Verified 2026-07-07 · Source
Requirements
- Excavation work requires an Excavation Permit
- Grading work requires a Grading Permit
- Blasting requires a Blasting Permit
- Cutting into a public road/right-of-way requires a Road Cut Fee payment plus bonding
Required documents
- RequiredExcavation/Grading Permit Application (iWorQ portal or Building Department)Submitted through North Ogden's iWorQ portal or directly through the Building Department.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Excavation Permit | $1,000.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section: 'Excavation Permit ... $1,000.00.' |
| Grading Permit | $150.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section: 'Grading Permit ... $150.00.' |
| Blasting Permit | $50.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section: 'Blasting Permit ... $50.00.' |
| Road Cut Fee | $75.00 + Road Cut Fee ($2.50 per sq ft); Taxing Entities (Special Districts & Government) pay 75% of standard fee; Cash Bond $300.00; Performance Bond $2,000.00; New Road Cut Additional Fee $500.00 (roads two years old or less) | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees and North Ogden City Street Cuts Fee sections. Fee applies to rights-of-way 60 feet or less; 66-foot rights-of-way are 15% more; 80-foot-plus rights-of-way are 30% more. |
| Mining/Crushing Permit | $1,000.00 | North Ogden City Consolidated Fee Schedule, Resolution 03-2026, Building Permit Fees section. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.