This is PermitBase’s published record for North Ogden as of 2026-07-13. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

North Ogden building permits

Verified

North Ogden, Utah — as published 2026-07-13.

Verified 2026-07-13 · Source

Codes adopted

North Ogden City's official Building Codes page states only that the city 'recognizes the current adopted Utah State Building Code' — it does not itemize individual code titles or edition years on its own page (confirmed on repeated fetches of northogdencity.gov/departments/building/building_codes.php).Statewide framework (Utah Code Title 15A, Uniform Building Standard Act): as of the code cycle effective July 1, 2026, the State of Utah has adopted the 2021 International Residential Code (IRC, continuing from the prior cycle), the 2024 International Building Code (IBC), the 2023 National Electrical Code (NEC), and other 2024 International Codes (IPC, IMC, IEBC, IECC) — the same statewide cycle documented on Highland City's official Building Division page. North Ogden's own site does not confirm city-level adoption of each title by name; this entry cites the statewide framework North Ogden explicitly says it follows, without asserting North Ogden has separately re-published each edition/year.Design criteria published on North Ogden's official Building Codes page: Seismic Design Category D or E; Basic Wind Speed 115 mph; Exposure Category C; roof snow load calculated via the state-adopted snow load calculator; minimum footing frost depth of 30 inches; weathering condition classified as 'severe.'

Permit types & fees

Residential/Commercial Building Permit

Verified

Required for new construction, additions, remodels, repairs, re-roofing/siding, electrical remodeling, plumbing replacement, and furnace/AC replacement in North Ogden. Both the Single-Family Residential Permit and Commercial Building Permit fee are valuation-based, calculated per the 1997 Uniform Building Code Section 107.2 Table 1-A plus 20%, per the city's official Consolidated Fee Schedule (Resolution 05-2026, adopted May 12, 2026, effective May 13, 2026 — the current edition; the previously-cited Resolution 03-2026 PDF link went dead and was confirmed superseded on 2026-07-13).

Verified 2026-07-13 · Source

Requirements

  • New construction, additions, remodels, and repairs including re-roofing/siding, electrical remodeling, plumbing replacement, furnace/AC replacement
  • Commercial structures, additions to or structural remodels of commercial buildings, and non-structural commercial remodels over 3,000 sq ft require a stamp/seal by a State-licensed professional
  • Residential Plan Check Fee Deposit of $500.00, or Commercial Plan Check Fee Deposit of $1,000.00, due at submittal

Required documents

  • RequiredBuilding Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal (cityofnorthogden.portal.iworq.net).

Fee schedule

Fee typeAmountNotes
Single-Family Residential Permit and Commercial Building Permit FeeValuation-based: 1997 Uniform Building Code, Section 107.2, Table 1-A, plus 20%North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Department § Building Permit Fees: 'Single-Family Residential Permit and Commercial Building Permit Fees ... 1997 version of the Uniform Building Code, Section 107.2 Table 1A plus 20%.' North Ogden does not publish its own flat valuation table; the 1997 UBC Table 1-A (plus a 20% surcharge) is the governing figure. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Residential Plan Check Fee Deposit$500.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Commercial Plan Check Fee Deposit$1,000.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Single-Family Residential Plan Check50% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Commercial Building Plan Check65% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
State Fee1% of Permit FeeNorth Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Minimum Building Permit Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Re-inspection Fee$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
After-Hours/Emergency Inspection$125.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Temporary Power Inspection$56.40North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Stop Work (Red Tag) — Failure to Obtain a Building Permit$250.00 first offense, $1,000.00 each additional offense (regardless of project type, unless emergency-related)North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Deposit for Off-Site Improvements (all new construction)$1,500.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition). SUPERSEDED FIGURE: Resolution 03-2026 (adopted January 13, 2026) published this deposit at $1,000.00; confirmed via direct page-3 comparison of both editions (03-2026 recovered via Wayback Machine snapshot dated 2026-01-17, since its live PDF now 404s) that Resolution 05-2026 raised it to $1,500.00. Genuine fee increase, not a citation error. Change identified and figure updated 2026-07-13.
Impact Fees (single-family residential, illustrative components)Storm Water $2,186.49; Water $6,273.70; Sewer $873.20; Sewer (CWSID) $3,575.00 (effective July 1, 2026; $3,537.00 prior to that date); Parks $6,017.26; Public Safety $388.93; Transportation $2,297.37; Fire $477.85North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Impact Fee Summary (page 13-14). All figures unchanged from the 03-2026 edition except the Central Weber Improvement Sewer District (CWSID) single-family sewer impact fee: the Impact Fee Summary table itself publishes a scheduled step-up from $3,537.00 to $3,575.00 'effective July 1, 2026.' As of this 2026-07-13 verification, that effective date has passed, so $3,575.00 is now the governing figure; $3,537.00 is retained parenthetically as the pre-July-1-2026 rate for historical reference. Multi-family and 'Additional Dwelling Unit (ADU)' rows in the same table publish different, lower per-unit or per-square-foot rates (e.g., ADU Water $4,893.50, ADU Sewer $681.10, ADU Fire $236.53, ADU Transportation $915.19) — these are impact-fee-schedule tiers by dwelling type, not a separate 'ADU permit' application fee.

Land Use Permit

North Ogden's Consolidated Fee Schedule publishes a single flat 'Land Use Permits' fee under the Planning Department section, distinct from the valuation-based Building Permit Fee. The city's official published sources do not break this category down into named sub-types (e.g., fence, shed, deck, retaining wall) the way some neighboring Utah cities' fee schedules do — it is published as one line item.

Reviewed 2026-07-13 · Source

Requirements

  • Applies to land-use-related permits reviewed by the Planning Department, submitted via the iWorQ online portal (cityofnorthogdenhome.portal.iworq.net)
  • The city's official Applications and Forms pages route all Planning and Zoning permit types through the iWorQ portal rather than publishing individually named PDF applications for accessory structures

Required documents

  • RequiredLand Use Permit Application (iWorQ portal)Submitted through North Ogden City's online iWorQ portal for Planning and Zoning (cityofnorthogdenhome.portal.iworq.net/portalhome/cityofnorthogdenhome).

Fee schedule

Fee typeAmountNotes
Land Use Permits$40.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Planning Department section: 'Land Use Permits ... $40.00.' This is the only Planning-Department-level permit fee published as a flat, non-valuation-based amount besides the Zoning Verification Letter ($25.00) and Re-build Letter ($25.00). Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Excavation, Grading, and Road Cut Permits

Verified

North Ogden requires separate permits and fees for excavation, grading, blasting, and road cuts, published in the Building Department section of the Consolidated Fee Schedule. These are distinct from the general Building Permit Fee.

Verified 2026-07-13 · Source

Requirements

  • Excavation work requires an Excavation Permit
  • Grading work requires a Grading Permit
  • Blasting requires a Blasting Permit
  • Cutting into a public road/right-of-way requires a Road Cut Fee payment plus bonding

Required documents

  • RequiredExcavation/Grading Permit Application (iWorQ portal or Building Department)Submitted through North Ogden's iWorQ portal or directly through the Building Department.

Fee schedule

Fee typeAmountNotes
Excavation Permit$75.00 + Road Cut Fee ($2.50 per sq ft) — shares the Road Cut Fee formula below; no separate flat Excavation Permit fee is publishedCORRECTED 2026-07-13: this entry previously listed a standalone 'Excavation Permit' fee of $1,000.00, but that figure does not appear in either the Resolution 03-2026 or Resolution 05-2026 (current, adopted May 12, 2026, effective May 13, 2026) editions of the Consolidated Fee Schedule. Direct visual inspection of the Building Permit Fees table (page 3) in both editions shows 'Excavation Permit' and 'Road Cut Fee' sharing a single merged fee cell — '$75.00 + Road Cut Fee' / '$2.50 per Sq Ft' — with no distinct dollar figure for Excavation Permit alone. The $1,000.00 previously recorded here most likely came from a mis-mapped extraction (the same $1,000.00 value that correctly belongs to the separate 'Mining/Crushing Permit' line item). Corrected to match the actual published fee structure rather than carrying forward an unsupported figure, per the zero-fabrication policy.
Grading Permit$150.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section: 'Grading Permit ... $150.00.' Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Blasting Permit$50.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section: 'Blasting Permit ... $50.00.' Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Road Cut Fee$75.00 + Road Cut Fee ($2.50 per sq ft); Taxing Entities (Special Districts & Government) pay 75% of standard fee; Cash Bond $300.00; Performance Bond $2,000.00; New Road Cut Additional Fee $500.00 (roads two years old or less)North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees and North Ogden City Street Cuts Fee sections. Fee applies to rights-of-way 60 feet or less; 66-foot rights-of-way are 15% more; 80-foot-plus rights-of-way are 30% more. All figures unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).
Mining/Crushing Permit$1,000.00North Ogden City Consolidated Fee Schedule, Resolution 05-2026 (adopted May 12, 2026, effective May 13, 2026 — current edition, superseding Resolution 03-2026), Building Permit Fees section. Figure unchanged between the 03-2026 and 05-2026 editions (confirmed 2026-07-13).

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/weber-county/north-ogden/as-of/2026-07-13/

Snapshot date: 2026-07-13

Commit: 19375a3

Reproducible from PermitBase’s version-controlled dataset, commit 19375a3.