This is PermitBase’s published record for Ogden as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Ogden building permits

Verified

Ogden, Utah — as published 2026-06-30.

Verified 2026-06-30 · Source

Codes adopted

2021 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); effective through June 30, 20262021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); continues in force after July 1, 20262021 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective through June 30, 20262021 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective through June 30, 20262021 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective through June 30, 20262023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); continues in force after July 1, 20262021 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective through June 30, 20262021 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective through June 30, 20262021 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective through June 30, 2026NOTE: Effective July 1, 2026 — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replace the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026); IRC remains 2021, NEC remains 2023

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and work requiring plan review under Ogden City Code Title 16 and the adopted Utah State Construction Code (2021 IBC/IRC through June 30, 2026; 2024 IBC effective July 1, 2026).

Verified 2026-06-30 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions — any work enlarging, altering, or repairing a structure
  • Structural modifications — load-bearing wall removal, foundation alterations, new window or door openings
  • Conversion of non-habitable to habitable space (e.g., finishing basement, bedrooms, attic spaces)
  • Changing the use of a building

Required documents

  • RequiredBuilding Permit ApplicationApply online via the Ogden EnerGov Self-Service portal (Residential category) at https://egselfservice.ogdencity.com or in person at 2549 Washington Blvd, Suite 220. A deposit of $70.50 is due at application acceptance and is deducted from the final permit price.
  • RequiredComplete Plan Set (one PDF)Full construction drawings including site/civil plans, floor plans, elevations, sections, structural details, and MEP plans. Must be sealed, signed, and dated by a Utah-licensed design professional. Partial submittals not accepted.
  • OptionalStructural Calculations (one PDF)Required for new construction and remodels with engineered design; sealed by a Utah-licensed PE.
  • OptionalGeotechnical Soils Report (one PDF)Required for new construction; seismic design categories D, E, and F exist in Ogden per the Design Criteria page.
  • RequiredEnergy Compliance — REScheck (one PDF)Required for residential construction; demonstrates compliance with the 2021 IECC (2024 IECC effective July 1, 2026).

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1.00–$1,200.00$70.50Ogden City Code § 4-6-1.A.9.a (Technical Code Base Fee Schedule), 2026 S-26 current, amended by Ord. 2025-43 (12/16/2025), Ord. 2026-2 (3/24/2026), Ord. 2026-6 (5/5/2026); note: AMlegal indicates these amendments are pending codification as of June 2026
Building Permit — valuation $1,201.00–$2,000.00$70.50 for the first $1,200.00 plus $2.78 for each additional $100.00 or fraction thereof, to and including $2,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $2,001.00–$25,000.00$92.75 for the first $2,000.00 plus $16.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $25,001.00–$50,000.00$460.75 for the first $25,000.00 plus $11.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $50,001.00–$100,000.00$748.25 for the first $50,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $100,001.00–$500,000.00$1,148.25 for the first $100,000.00 plus $6.30 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $500,001.00–$1,000,000.00$3,668.25 for the first $500,000.00 plus $5.25 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $1,000,001.00 and up$6,293.25 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereofOgden City Code § 4-6-1.A.9.a
Plan Review Fee65% of the Technical Code Base Fee Schedule, or if a lesser amount, the actual cost of performing the reviewOgden City Code § 4-6-1.A.9.c. A $70.50 deposit is collected at application acceptance and deducted from final permit price.
Over-the-Counter Plan Review$47.00Ogden City Code § 4-6-1.A.9.c. Available for simple residential projects (e.g., basement finish, existing space remodel). Most commercial projects require full submittal.
Additional Plan Review (changes, additions, revisions to plans)$47.00 per hourOgden City Code § 4-6-1.A.9.c
Additional Inspections (not included in base fee)$47.00 per hourOgden City Code § 4-6-1.A.9.b

Electrical Permit

Verified

Required for electrical work in Ogden including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Permit fee is valuation-based per the Technical Code Base Fee Schedule.

Verified 2026-06-30 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections
  • Altering, changing, extending, installing, repairing, or replacing any electrical system

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person. A $70.50 deposit is due at acceptance.
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.' A $70.50 deposit is collected at application acceptance.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c
Additional Inspections$47.00 per hourOgden City Code § 4-6-1.A.9.b

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Ogden including water heaters, fixture additions, and gas line work. Governed by the 2021 IPC as adopted by Utah Code § 15A-2-103 (2024 IPC effective July 1, 2026).

Verified 2026-06-30 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement (including like-for-like — explicitly required by permit)
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation
  • Altering, changing, extending, installing, repairing, or replacing any plumbing system

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service or in person. A $70.50 deposit is due at acceptance.
  • OptionalPlumbing PlanRequired for larger projects — pipe layout, fixture locations, and drainage
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.'
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c
Additional Inspections$47.00 per hourOgden City Code § 4-6-1.A.9.b

Mechanical / HVAC Permit

Verified

Required for HVAC installations, replacements, and ductwork modifications in Ogden. Ogden's Permit Requirements page explicitly states a permit is required to replace a furnace. Governed by the 2021 IMC (2024 IMC effective July 1, 2026).

Verified 2026-06-30 · Source

Requirements

  • Furnace or boiler installation or replacement (explicitly required by permit requirements page)
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation
  • Altering, changing, extending, installing, repairing, or replacing any mechanical/gas system

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service or in person. A $70.50 deposit is due at acceptance.
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalMechanical PlanRequired for larger projects — equipment location, duct layout, sizing calculations

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.'
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c
Additional Inspections$47.00 per hourOgden City Code § 4-6-1.A.9.b

Roofing Permit

Verified

Required for roof replacement and structural roof repairs in Ogden. Permit fees are valuation-based per the Technical Code Base Fee Schedule. Ogden's Design Criteria page confirms ice barrier underlayment is required.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person. A $70.50 deposit is due at acceptance.
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Roofing Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to all building work.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Ogden. Ogden does not publish a separate solar-specific fee tier — solar permits are assessed the standard valuation-based building permit fee under Ogden City Code § 4-6-1.A.9's Technical Code Base Fee Schedule (confirmed by full-text review of the current codified fee schedule, which contains no 'solar' or 'photovoltaic' line item).

Verified 2026-07-01 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation (requires separate electrical permit for wiring)
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category). A $70.50 deposit is due at acceptance.
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and fire-department access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels; sealed by a Utah-licensed PE
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementRocky Mountain Power utility approval for grid-tied systems

Fee schedule

Fee typeAmountNotes
Solar Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a assesses building permit fees (which govern all permitted construction, including PV installations) on project valuation. Verified by full-text review of the current codified § 4-6-1 fee schedule (2026-07-01): no separate solar/photovoltaic fee line item exists, confirming the standard valuation-based fee is the applicable — and grounded — fee.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Fence Permit

Verified

Required for fence installation in Ogden. Classified as a Land Use permit (not a building permit). Per Ogden City's Permit Requirements page, fence permits are no cost.

Verified 2026-06-30 · Source

Requirements

  • New fence construction
  • Fence installations in Ogden are Land Use permits — apply under the Land Use category
  • A site plan is required
  • Fences under 200 sq. ft. detached accessory buildings also fall under Land Use (no building permit required)

Required documents

  • RequiredLand Use Permit ApplicationApply online via Ogden EnerGov Self-Service (Land Use category) at https://egselfservice.ogdencity.com.
  • RequiredSite PlanRequired per Ogden Permit Applications page — showing fence location relative to property lines and easements

Fee schedule

Fee typeAmountNotes
Fence Permit (Land Use)No costOgden City Permit Requirements page states: 'Parking Slabs and Fence Permits Are No Cost.' Source: https://www.ogdencity.gov/192/Permit-Requirements

Demolition Permit

Verified

Required for partial or complete demolition of structures in Ogden. Demolition permits are issued separately and require Asbestos and Utility Clearances per the Ogden Permit Applications page.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements or load-bearing walls
  • Demolition of structures with potential asbestos or lead paint

Required documents

  • RequiredDemolition Permit ApplicationApply online via Ogden EnerGov Self-Service (Demolition category) at https://egselfservice.ogdencity.com. Demolition permits are issued separately from other permits.
  • OptionalAsbestos ClearanceContact Utah Division of Air Quality (ATLAS Air Toxics, Lead and Asbestos Section) for asbestos clearance before demolition of applicable structures.
  • RequiredPower ClearanceContact Rocky Mountain Power at 888-221-7070 for electrical disconnect clearance
  • RequiredGas ClearanceEmail Dominion Energy (mindy.rogers@dominionenergy.com) for gas disconnect clearance
  • RequiredWater ClearanceEmail Ogden City Public Utilities (davidlamay@ogdencity.gov) for water disconnect clearance

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Verified by full-text review (2026-07-01) of the current codified Ogden City Code § 4-6-1.A.9, which explicitly lists demolition permits under 'Building permit fees (i.e., building, plumbing, electrical, mechanical, demolitions, etc.)' — assessed on the same Technical Code Base Fee Schedule as building permits. No separate demolition-specific fee tier exists. A $70.50 deposit is collected at application acceptance.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in Ogden. Ogden's Permit Requirements page explicitly states a permit is required to replace a water heater. Subset of the plumbing permit for this common project type.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps — explicitly required)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person at 2549 Washington Blvd, Suite 220. A $70.50 deposit is due at acceptance.
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Water Heater Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: plumbing permit fees use the same Technical Code Base Fee Schedule as building permits.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in Ogden. Permit fees are valuation-based per the Technical Code Base Fee Schedule.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service or in person. A $70.50 deposit is due at acceptance.
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Deck Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a assesses all building-permit-classed work (including deck construction) on project valuation. Verified by full-text review of the current codified § 4-6-1 fee schedule (2026-07-01): no separate deck-specific fee tier exists, confirming the standard valuation-based fee applies. A $70.50 deposit is collected at application acceptance.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Ogden, including framing, electrical, plumbing, and mechanical work. Listed as 'Finishing Basement, Bedrooms and Attic Spaces' on Ogden's Permit Requirements page. Simple basement finish projects qualify for over-the-counter plan review at $47.

Verified 2026-06-30 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per 2021 IRC)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
  • OptionalMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room

Fee schedule

Fee typeAmountNotes
Basement Finish Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a.
Over-the-Counter Plan Review$47.00Available for simple residential basement finishes and existing space remodels per Ogden Building Inspections FAQ. Ogden City Code § 4-6-1.A.9.c.

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of accessory dwelling units in Ogden. Ogden City Code § 4-6-1.A.1 lists a $250 ADU planning administrative review fee, in addition to the valuation-based building permit fee.

Verified 2026-07-01 · Source

Requirements

  • Property must be in an ADU-eligible zone — contact Ogden Planning at (801) 629-8930
  • ADU must meet building code and fire separation requirements (2021 IRC)
  • Planning administrative review required ($250 fee)

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or contact Planning at (801) 629-8930 for pre-application guidance.
  • RequiredComplete Plan SetFull construction drawings including site plan, floor plans, elevations, and MEP plans. Sealed by a Utah-licensed design professional.
  • RequiredEnergy Compliance — REScheckDemonstrates compliance with the 2021 IECC (2024 IECC effective July 1, 2026)

Fee schedule

Fee typeAmountNotes
ADU Planning Administrative Review$250.00Verified by full-text review (2026-07-01) of the current codified Ogden City Code § 4-6-1.A.1, General Planning Administrative Reviews table: 'Accessory dwelling unit $250.00' — flat fee, confirmed directly in the published fee schedule.
Building Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-27)Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/weber-county/ogden/as-of/2026-06-30/

Snapshot date: 2026-06-30

Commit: 9e5cbba

Reproducible from PermitBase’s version-controlled dataset, commit 9e5cbba.