Ogden building permits

Verified

Ogden, Utah — as published 2026-07-16.

Verified 2026-06-30 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a))2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b))2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d))2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e))2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f))2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g))2024 International Energy Conservation Code (IECC) — currently in effect as of July 1, 2026, superseding the 2021 IECC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(h))2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i))Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n))NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. This file cites no Ogden-specific code-adoption webpage; all codesAdopted entries above are sourced directly from the statute.

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and work requiring plan review under Ogden City Code Title 16 and the adopted Utah State Construction Code (2021 IRC, unchanged; 2024 IBC, effective July 1, 2026, superseded the 2021 edition).

Verified 2026-06-30 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions — any work enlarging, altering, or repairing a structure
  • Structural modifications — load-bearing wall removal, foundation alterations, new window or door openings
  • Conversion of non-habitable to habitable space (e.g., finishing basement, bedrooms, attic spaces)
  • Changing the use of a building

Required documents

  • RequiredBuilding Permit ApplicationApply online via the Ogden EnerGov Self-Service portal (Residential category) at https://egselfservice.ogdencity.com or in person at 2549 Washington Blvd, Suite 220. A deposit of $70.50 is due at application acceptance and is deducted from the final permit price.
  • RequiredComplete Plan Set (one PDF)Full construction drawings including site/civil plans, floor plans, elevations, sections, structural details, and MEP plans. Must be sealed, signed, and dated by a Utah-licensed design professional. Partial submittals not accepted.
  • OptionalStructural Calculations (one PDF)Required for new construction and remodels with engineered design; sealed by a Utah-licensed PE.
  • OptionalGeotechnical Soils Report (one PDF)Required for new construction; seismic design categories D, E, and F exist in Ogden per the Design Criteria page.
  • RequiredEnergy Compliance — REScheck (one PDF)Required for residential construction; demonstrates compliance with the 2024 IECC, effective July 1, 2026 (superseded the 2021 edition).

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1.00–$1,200.00$70.50Ogden City Code § 4-6-1.A.9.a (Technical Code Base Fee Schedule), 2026 S-26 current, amended by Ord. 2025-43 (12/16/2025), Ord. 2026-2 (3/24/2026), Ord. 2026-6 (5/5/2026); note: AMlegal indicates these amendments are pending codification as of June 2026
Building Permit — valuation $1,201.00–$2,000.00$70.50 for the first $1,200.00 plus $2.78 for each additional $100.00 or fraction thereof, to and including $2,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $2,001.00–$25,000.00$92.75 for the first $2,000.00 plus $16.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $25,001.00–$50,000.00$460.75 for the first $25,000.00 plus $11.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $50,001.00–$100,000.00$748.25 for the first $50,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $100,001.00–$500,000.00$1,148.25 for the first $100,000.00 plus $6.30 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $500,001.00–$1,000,000.00$3,668.25 for the first $500,000.00 plus $5.25 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $1,000,001.00 and up$6,293.25 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereofOgden City Code § 4-6-1.A.9.a
Plan Review Fee65% of the Technical Code Base Fee Schedule, or if a lesser amount, the actual cost of performing the reviewOgden City Code § 4-6-1.A.9.c. A $70.50 deposit is collected at application acceptance and deducted from final permit price.
Over-the-Counter Plan Review$47.00Ogden City Code § 4-6-1.A.9.c. Available for simple residential projects (e.g., basement finish, existing space remodel). Most commercial projects require full submittal.
Additional Plan Review (changes, additions, revisions to plans)$47.00 per hourOgden City Code § 4-6-1.A.9.c
Additional Inspections (not included in base fee)$47.00 per hourOgden City Code § 4-6-1.A.9.b

Electrical Permit

Verified

Required for electrical work in Ogden including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Permit fee is valuation-based per the Technical Code Base Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; neither Ogden's Permit Requirements page nor its Transportation Electrification page publish a separate EV-specific permit type or fee line item.

Verified 2026-07-20 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections
  • Altering, changing, extending, installing, repairing, or replacing any electrical system

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person. A $70.50 deposit is due at acceptance.
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Electrical Permit FeeValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.' A $70.50 deposit is collected at application acceptance.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c
Additional Inspections$47.00 per hourOgden City Code § 4-6-1.A.9.b

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Ogden including water heaters, fixture additions, and gas line work. Governed by the 2024 IPC as adopted by Utah Code § 15A-2-103, effective July 1, 2026 (superseded the 2021 edition).

Verified 2026-06-30 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement (including like-for-like — explicitly required by permit)
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation
  • Altering, changing, extending, installing, repairing, or replacing any plumbing system

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service or in person. A $70.50 deposit is due at acceptance.
  • OptionalPlumbing PlanRequired for larger projects — pipe layout, fixture locations, and drainage
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Plumbing Permit FeeValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.'
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c
Additional Inspections$47.00 per hourOgden City Code § 4-6-1.A.9.b

Mechanical / HVAC Permit

Verified

Required for HVAC installations, replacements, and ductwork modifications in Ogden. Ogden's Permit Requirements page explicitly states a permit is required to replace a furnace. Governed by the 2024 IMC, effective July 1, 2026 (superseded the 2021 edition).

Verified 2026-06-30 · Source

Requirements

  • Furnace or boiler installation or replacement (explicitly required by permit requirements page)
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation
  • Altering, changing, extending, installing, repairing, or replacing any mechanical/gas system

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service or in person. A $70.50 deposit is due at acceptance.
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalMechanical PlanRequired for larger projects — equipment location, duct layout, sizing calculations

Fee schedule

Fee typeAmountNotes
Mechanical Permit FeeValuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.'
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c
Additional Inspections$47.00 per hourOgden City Code § 4-6-1.A.9.b

Roofing Permit

Verified

Required for roof replacement and structural roof repairs in Ogden. Permit fees are valuation-based per the Technical Code Base Fee Schedule. Ogden's Design Criteria page confirms ice barrier underlayment is required.

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person. A $70.50 deposit is due at acceptance.
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Roofing Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: building permit fees apply to all building work.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Ogden. Ogden does not publish a separate solar-specific fee tier — solar permits are assessed the standard valuation-based building permit fee under Ogden City Code § 4-6-1.A.9's Technical Code Base Fee Schedule (confirmed by full-text review of the current codified fee schedule, which contains no 'solar' or 'photovoltaic' line item).

Verified 2026-07-01 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation (requires separate electrical permit for wiring)
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category). A $70.50 deposit is due at acceptance.
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and fire-department access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels; sealed by a Utah-licensed PE
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementRocky Mountain Power utility approval for grid-tied systems

Fee schedule

Fee typeAmountNotes
Solar Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a assesses building permit fees (which govern all permitted construction, including PV installations) on project valuation. Verified by full-text review of the current codified § 4-6-1 fee schedule (2026-07-01): no separate solar/photovoltaic fee line item exists, confirming the standard valuation-based fee is the applicable — and grounded — fee.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Fence Permit

Verified

Required for fence installation in Ogden. Classified as a Land Use permit (not a building permit). Per Ogden City's Permit Requirements page, fence permits are no cost.

Verified 2026-06-30 · Source

Requirements

  • New fence construction
  • Fence installations in Ogden are Land Use permits — apply under the Land Use category
  • A site plan is required
  • Fences under 200 sq. ft. detached accessory buildings also fall under Land Use (no building permit required)

Required documents

  • RequiredLand Use Permit ApplicationApply online via Ogden EnerGov Self-Service (Land Use category) at https://egselfservice.ogdencity.com.
  • RequiredSite PlanRequired per Ogden Permit Applications page — showing fence location relative to property lines and easements

Fee schedule

Fee typeAmountNotes
Fence Permit (Land Use)No costOgden City Permit Requirements page states: 'Parking Slabs and Fence Permits Are No Cost.' Source: https://www.ogdencity.gov/192/Permit-Requirements

Demolition Permit

Verified

Required for partial or complete demolition of structures in Ogden. Demolition permits are issued separately and require Asbestos and Utility Clearances per the Ogden Permit Applications page.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements or load-bearing walls
  • Demolition of structures with potential asbestos or lead paint

Required documents

  • RequiredDemolition Permit ApplicationApply online via Ogden EnerGov Self-Service (Demolition category) at https://egselfservice.ogdencity.com. Demolition permits are issued separately from other permits.
  • OptionalAsbestos ClearanceContact Utah Division of Air Quality (ATLAS Air Toxics, Lead and Asbestos Section) for asbestos clearance before demolition of applicable structures.
  • RequiredPower ClearanceContact Rocky Mountain Power at 888-221-7070 for electrical disconnect clearance
  • RequiredGas ClearanceEmail Dominion Energy (mindy.rogers@dominionenergy.com) for gas disconnect clearance
  • RequiredWater ClearanceEmail Ogden City Public Utilities (davidlamay@ogdencity.gov) for water disconnect clearance

Fee schedule

Fee typeAmountNotes
Demolition Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Verified by full-text review (2026-07-01) of the current codified Ogden City Code § 4-6-1.A.9, which explicitly lists demolition permits under 'Building permit fees (i.e., building, plumbing, electrical, mechanical, demolitions, etc.)' — assessed on the same Technical Code Base Fee Schedule as building permits. No separate demolition-specific fee tier exists. A $70.50 deposit is collected at application acceptance.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in Ogden. Ogden's Permit Requirements page explicitly states a permit is required to replace a water heater. Subset of the plumbing permit for this common project type.

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps — explicitly required)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person at 2549 Washington Blvd, Suite 220. A $70.50 deposit is due at acceptance.
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for commercial and residential rental. Homeowners may pull permits for owner-occupied residences.

Fee schedule

Fee typeAmountNotes
Water Heater Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a: plumbing permit fees use the same Technical Code Base Fee Schedule as building permits.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in Ogden. Permit fees are valuation-based per the Technical Code Base Fee Schedule.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service or in person. A $70.50 deposit is due at acceptance.
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Deck Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a assesses all building-permit-classed work (including deck construction) on project valuation. Verified by full-text review of the current codified § 4-6-1 fee schedule (2026-07-01): no separate deck-specific fee tier exists, confirming the standard valuation-based fee applies. A $70.50 deposit is collected at application acceptance.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Ogden, including framing, electrical, plumbing, and mechanical work. Listed as 'Finishing Basement, Bedrooms and Attic Spaces' on Ogden's Permit Requirements page. Simple basement finish projects qualify for over-the-counter plan review at $47.

Verified 2026-06-30 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per 2021 IRC)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
  • OptionalMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room

Fee schedule

Fee typeAmountNotes
Basement Finish Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a.
Over-the-Counter Plan Review$47.00Available for simple residential basement finishes and existing space remodels per Ogden Building Inspections FAQ. Ogden City Code § 4-6-1.A.9.c.

Accessory Dwelling Unit (ADU) Permit

Verified

Required for construction of accessory dwelling units in Ogden. Ogden City Code § 4-6-1.A.1 lists a $250 ADU planning administrative review fee, in addition to the valuation-based building permit fee.

Verified 2026-07-01 · Source

Requirements

  • Property must be in an ADU-eligible zone — contact Ogden Planning at (801) 629-8930
  • ADU must meet building code and fire separation requirements (2021 IRC)
  • Planning administrative review required ($250 fee)

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or contact Planning at (801) 629-8930 for pre-application guidance.
  • RequiredComplete Plan SetFull construction drawings including site plan, floor plans, elevations, and MEP plans. Sealed by a Utah-licensed design professional.
  • RequiredEnergy Compliance — REScheckDemonstrates compliance with the 2024 IECC, effective July 1, 2026 (superseded the 2021 edition)

Fee schedule

Fee typeAmountNotes
ADU Planning Administrative Review$250.00Verified by full-text review (2026-07-01) of the current codified Ogden City Code § 4-6-1.A.1, General Planning Administrative Reviews table: 'Accessory dwelling unit $250.00' — flat fee, confirmed directly in the published fee schedule.
Building Permit FeeValuation-based per Technical Code Base Fee Schedule (minimum $70.50 for work valued at $1,200 or less)Ogden City Code § 4-6-1.A.9.a
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Commercial Building Permit

Verified

Required for new commercial construction in Ogden — Weber County's largest city and primary commercial hub — covering apartment buildings, industrial, office, retail, and restaurant projects, per Ogden's official Permit Applications page. Regulated by the state-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective July 1, 2026). Ogden's Technical Code Base Fee Schedule (Ogden City Code § 4-6-1.A.9) is a single valuation-based table shared by building, plumbing, electrical, mechanical, and demolition permits — full-text review of the current codified fee schedule (2026-07-19) found no separate commercial valuation tier or commercial-specific Plan Review percentage; the flat 65% Plan Review Fee applies to both residential and commercial work.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction — apartment buildings, industrial, office, retail, restaurants, or fire damage/repair to a commercial structure — per Ogden's official Permit Applications page 'Commercial' category
  • Changing the use of a commercial building (e.g., converting an office to a restaurant) requires a permit, per Ogden's Permit Requirements page
  • Complete plan set (site/civil, mechanical, electrical, plumbing plans in one PDF), sealed, signed, and dated by a Utah-licensed design professional
  • Structural calculations and a geotechnical soils report (one PDF each)
  • Project specifications/manual and energy compliance documentation (ComCheck for commercial) (one PDF each)
  • Most commercial projects require full plan-review submittal — the $47 over-the-counter plan review is available only for simple residential projects, per Ogden City Code § 4-6-1.A.9.c

Required documents

  • RequiredBuilding Permit Application (Commercial)Apply online via the Ogden EnerGov Self-Service portal (Commercial category) at https://egselfservice.ogdencity.com or in person at 2549 Washington Blvd, Suite 220. A $70.50 deposit is due at application acceptance.
  • RequiredComplete Plan Set (one PDF)Site and civil plans plus mechanical, electrical, and plumbing plans, per Ogden's Permit Applications page New Construction checklist.
  • RequiredStructural Calculations (one PDF)Sealed by a Utah-licensed PE.
  • RequiredGeotechnical Soils Report (one PDF)Required for new commercial construction; seismic design categories D, E, and F exist in Ogden per the Design Criteria page.
  • RequiredProject Specifications/Manual (one PDF)Per Ogden's Permit Applications page New Construction checklist.
  • RequiredEnergy Compliance — ComCheck (one PDF)Demonstrates compliance with the 2024 IECC, effective July 1, 2026.
  • OptionalMiscellaneous Items (one PDF)Catch-all for items not fitting other categories, per Ogden's Permit Applications page.

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1.00–$1,200.00$70.50Ogden City Code § 4-6-1.A.9.a (Technical Code Base Fee Schedule) — same shared table used for the Residential Building Permit; Ogden does not publish a separate commercial valuation tier.
Building Permit — valuation $1,201.00–$2,000.00$70.50 for the first $1,200.00 plus $2.78 for each additional $100.00 or fraction thereof, to and including $2,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $2,001.00–$25,000.00$92.75 for the first $2,000.00 plus $16.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $25,001.00–$50,000.00$460.75 for the first $25,000.00 plus $11.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $50,001.00–$100,000.00$748.25 for the first $50,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $100,001.00–$500,000.00$1,148.25 for the first $100,000.00 plus $6.30 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $500,001.00–$1,000,000.00$3,668.25 for the first $500,000.00 plus $5.25 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $1,000,001.00 and up$6,293.25 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereofOgden City Code § 4-6-1.A.9.a
Plan Review Fee65% of the Technical Code Base Fee Schedule, or if a lesser amount, the actual cost of performing the reviewOgden City Code § 4-6-1.A.9.c: 'Plan review fee: 65% of the technical code base fee schedule or, if a lesser amount, the actual cost of performing the review.' This flat rate applies to both commercial and residential — Ogden does not publish a separate commercial percentage (confirmed by full-text review of the current codified § 4-6-1, 2026-07-19).
Additional Plan Review (changes, additions, revisions to plans)$47.00 per hourOgden City Code § 4-6-1.A.9.c
Additional Inspections (not included in base fee)$47.00 per hourOgden City Code § 4-6-1.A.9.b
Resubmitted Commercial/Manufacturing Plans (due to inaccurate drawings or changes in plans)$250.00 per resubmittalOgden City Code § 4-6-1, Miscellaneous planning fees section: 'Resubmitted commercial/manufacturing plans, due to inaccurate drawings or changes in plans — $250/resubmittal' (confirmed via full-text fetch of codelibrary.amlegal.com, 2026-07-19).
Major Site Plan Review (Planning Department prerequisite for many new commercial projects)$750.00 plus $30.00 per $100,000 of valuationOgden City Code § 4-6-1, Site plan reviews section — a Planning Department fee, separate from and in addition to the Building Division's permit fee, commonly required before a new commercial building permit can be issued. Confirmed via full-text fetch of codelibrary.amlegal.com, 2026-07-19.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement, tenant finish, and commercial remodel work in Ogden, filed under the 'Remodels' document category on the city's Permit Applications page (which lists 'Commercial Remodels' as a distinct application category alongside 'Commercial New Buildings'). Uses the same shared Technical Code Base Fee Schedule (Ogden City Code § 4-6-1.A.9) as new commercial construction — full-text review of the current codified fee schedule (2026-07-19) found no distinct tenant-improvement fee tier.

Verified 2026-07-19 · Source

Requirements

  • Commercial remodel / tenant improvement work in an existing commercial building — Ogden's Permit Applications page lists 'Commercial Remodels' as a distinct application category alongside 'Commercial New Buildings'
  • Changing the use of a commercial building (e.g., office to restaurant) requires a permit, per Ogden's Permit Requirements page
  • Complete floor plan set, sealed, signed, and dated by a Utah-licensed design professional
  • Most commercial remodel/tenant-improvement projects require full plan-review submittal rather than the $47 over-the-counter review, which Ogden reserves for simple residential projects

Required documents

  • RequiredBuilding Permit Application (Commercial Remodel)Apply online via the Ogden EnerGov Self-Service portal (Commercial category). A $70.50 deposit is due at application acceptance.
  • RequiredComplete Floor Plan Set (one PDF)Per Ogden's Permit Applications page Remodels checklist.
  • OptionalStructural Calculations (one PDF)Required where the tenant improvement involves structural work; sealed by a Utah-licensed PE.
  • RequiredProject Specifications/Manual (one PDF)Per Ogden's Permit Applications page Remodels checklist.
  • RequiredEnergy Compliance — ComCheck (one PDF)Demonstrates compliance with the 2024 IECC, effective July 1, 2026.
  • OptionalMiscellaneous Items (one PDF)Installation manuals, photos, cut/spec sheets, per Ogden's Permit Applications page Remodels checklist.

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1.00–$1,200.00 (applies to tenant improvement/remodel work — same shared table as new construction)$70.50Ogden City Code § 4-6-1.A.9.a (Technical Code Base Fee Schedule) — same shared table used for the Residential Building Permit; Ogden does not publish a separate commercial valuation tier.
Building Permit — valuation $1,201.00–$2,000.00 (applies to tenant improvement/remodel work — same shared table as new construction)$70.50 for the first $1,200.00 plus $2.78 for each additional $100.00 or fraction thereof, to and including $2,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $2,001.00–$25,000.00 (applies to tenant improvement/remodel work — same shared table as new construction)$92.75 for the first $2,000.00 plus $16.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $25,001.00–$50,000.00 (applies to tenant improvement/remodel work — same shared table as new construction)$460.75 for the first $25,000.00 plus $11.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $50,001.00–$100,000.00 (applies to tenant improvement/remodel work — same shared table as new construction)$748.25 for the first $50,000.00 plus $8.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $100,001.00–$500,000.00 (applies to tenant improvement/remodel work — same shared table as new construction)$1,148.25 for the first $100,000.00 plus $6.30 for each additional $1,000.00 or fraction thereof, to and including $500,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $500,001.00–$1,000,000.00 (applies to tenant improvement/remodel work — same shared table as new construction)$3,668.25 for the first $500,000.00 plus $5.25 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00Ogden City Code § 4-6-1.A.9.a
Building Permit — valuation $1,000,001.00 and up (applies to tenant improvement/remodel work — same shared table as new construction)$6,293.25 for the first $1,000,000.00 plus $4.00 for each additional $1,000.00 or fraction thereofOgden City Code § 4-6-1.A.9.a
Plan Review Fee65% of the Technical Code Base Fee Schedule, or if a lesser amount, the actual cost of performing the reviewOgden City Code § 4-6-1.A.9.c. Same flat rate applies to tenant improvement work as to new commercial construction and residential permits.
Additional Plan Review (changes, additions, revisions to plans)$47.00 per hourOgden City Code § 4-6-1.A.9.c
Resubmitted Commercial/Manufacturing Plans (due to inaccurate drawings or changes in plans)$250.00 per resubmittalOgden City Code § 4-6-1, Miscellaneous planning fees section (confirmed via full-text fetch, 2026-07-19).

Sign Permit

Verified

Required in Ogden City to erect, maintain, or remodel any sign upon or over public or private property, per Ogden City Code § 18-1-5. Review and permit fees are tiered by sign value ($1,200.00 threshold) under § 4-6-1(A)(10), with a minimum $11.00 over-the-counter review fee and no permit fee at all for signs that don't require an inspection.

Verified 2026-07-20 · Source

Requirements

  • A sign permit is required from the Division of Building Services before erecting, maintaining, or remodeling any sign upon or over public or private property, unless specifically exempted under §§ 18-1-4 and 18-1-6, per § 18-1-5(A)
  • No illuminated or floodlighted sign may be connected to an electrical wiring source until a separate electrical permit has been issued by the Division of Building Services, per § 18-1-5(B)(1)
  • Other than for searchlights and spotlights, a sign permit may only be issued to a licensed sign contractor (unless exempt from state licensing requirements), and all sign permit requests must be accompanied by 2 complete sets of drawings and specifications, per § 18-1-5(B)(2)(a)
  • A sign permit for a searchlight or spotlight may be issued to the property owner/lessee and is valid January 1 through December 31, per § 18-1-5(B)(2)(b)
  • Review and permit fees as determined in Title 4, Chapter 6 of the City Code must be paid before any sign permit for construction, remodeling, or relocation is issued, per § 18-1-5(C)

Required documents

  • RequiredSign Permit Application (2 complete sets of drawings and specifications)Required for all sign permit requests except searchlights/spotlights issued to a licensed sign contractor, per § 18-1-5(B)(2)(a).
  • OptionalElectrical PermitSeparate permit required before connecting any illuminated or floodlighted sign to an electrical wiring source, per § 18-1-5(B)(1).

Fee schedule

Fee typeAmountNotes
Review Fee — signs up to $1,200.00 in value, reviewed over the counter$11.00Ogden City Code § 4-6-1(A)(10)(a): 'For signs up to $1,200.00 in value that are reviewed over the counter $11.00.'
Review Fee — signs $1,201.00+ in value, or requiring more than over-the-counter review65% of the technical code base fee schedule, or actual cost of review if lessOgden City Code § 4-6-1(A)(10)(a).
Permit Fee — signs not requiring an inspectionNo feeOgden City Code § 4-6-1(A)(10)(b).
Permit Fee — signs up to $1,200.00 in value requiring a single inspection$47.00Ogden City Code § 4-6-1(A)(10)(b).
Permit Fee — signs $1,201.00+ in value or requiring multiple inspections100% of the technical code base fee scheduleOgden City Code § 4-6-1(A)(10)(b).

Fire Protection System (Sprinkler & Alarm) Permit

Verified

Ogden City Fire Department requires a permit for private fire protection systems, per Ogden Municipal Code Section 9-2-8. Coverage includes commercial fire alarms, sprinklers, and commercial kitchen hoods, and residential fire protection systems where the building has more than two dwelling units (townhomes excluded). Applications are submitted through the Fire Protection System Plans & Permits self-service portal.

Verified 2026-07-20 · Source

Requirements

  • Commercial fire alarm system installation or modification
  • Commercial fire sprinkler system installation or modification
  • Commercial kitchen hood suppression system installation or modification
  • Residential fire protection system for buildings with more than two dwelling units (excludes townhomes)

Required documents

  • RequiredFire Protection System PlansSubmitted through the Fire Protection System Plans & Permits self-service application portal

Fee schedule

Fee typeAmountNotes
Private Fire Protection System Inspection FeeNot more than $15.00 per inspectionOgden Municipal Code Section 9-2-8, as amended by Ordinance 2024-15, adopted by the Ogden City Council on June 18, 2024 (roll call vote, all members voting aye). Raised from a prior cap of $12.00 per inspection, unchanged since April 2017. Re-fetched and confirmed 2026-07-20 directly from the Council Staff Review PDF: "The ordinance, if approved, will change the fee from $12 to $15 per inspection... Ogden Municipal Code 9-2-8 currently states that the fee for a third-party inspection may not exceed $12 per inspection." Per the June 18, 2024 council minutes: "the City requires a permit for private fire protection systems and currently uses a third-party to track private fire protection systems and to perform inspections... these fees are paid directly to the inspectors through the third-party system and are not collected by the City." The ordinance also allows the fee to be increased annually based on the Consumer Price Index. (Note: this figure was previously mis-recorded as "5"/"2" due to a data-entry error stripping the "$1" prefix -- corrected 2026-07-20 against the primary source.)

EV Charger / EVSE Permit

Verified

Ogden has no distinct EV charger/EVSE permit type or fee line item — installing electric vehicle charging equipment is electrical work billed under the city's standard Electrical Permit, using the same valuation-based Technical Code Base Fee Schedule (Ogden City Code § 4-6-1.A.9) that applies to all electrical work. Ogden's own Electrical Permit entry explicitly notes: 'EV charger (Level 2 EVSE) installations do not have their own permit type in Ogden — pull this general Electrical Permit for the dedicated circuit and charger connection.' A direct check of ogdencity.gov's Permit Requirements page found no 'EV,' 'electric vehicle,' or 'EVSE' specific permit type or fee.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Ogden
  • New dedicated electrical circuit and/or panel capacity to serve the charger, regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
  • Apply online via Ogden EnerGov Self-Service (Residential category) or in person, using the standard Electrical Permit application

Required documents

  • RequiredPermit ApplicationApply online via Ogden EnerGov Self-Service (Residential category) or in person; a $70.50 deposit is due at acceptance, per Ogden's standard Electrical Permit process.
  • OptionalElectrical Plan / Single-Line DiagramRecommended for the dedicated EV charger circuit, showing panel schedule and circuit layout, particularly if a panel/service upgrade is required to support the charger.

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (covers EV charger/EVSE circuit work)Valuation-based per Technical Code Base Fee Schedule — minimum $70.50 for work valued at $1,200 or lessOgden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.' EV charger installation is billed as standard electrical work under this same schedule. A $70.50 deposit is collected at application acceptance.
Plan Review Fee65% of the Technical Code Base Fee Schedule, or actual cost if lessOgden City Code § 4-6-1.A.9.c

Fire Alarm System Permit

Verified

Ogden issues a Fire Alarm Permit as its own distinct application category -- separate from Fire Suppression (sprinkler) -- through the city's EnerGov Self-Service portal. Per the portal's own application description (fetched and read directly 2026-07-22): 'Fire alarm permits are required for the installation and modifications of fire alarm systems in commercial buildings or structures... No fire alarm system work should be started without a permit. You cannot schedule an inspection without a fire alarm permit. Does not apply to private residential alarms.' Ogden's Consolidated Fee Schedule (Ogden City Code Section 4-6-1) does not publish a fire-alarm-specific fee line item, so permit issuance is billed under the same valuation-based Technical Code Base Fee Schedule used for all building permits (Section 4-6-1.A.9), while post-installation third-party inspections fall under the Private Fire Protection System Inspection Fee (Section 9-2-8, capped at $15.00 per inspection) documented on this file's fire-sprinkler-alarm-permit entry.

Verified 2026-07-22 · Source

Requirements

  • Installation or modification of a fire alarm/detection system in a commercial building or structure -- per the EnerGov Application Assistant, 'does not apply to private residential alarms'
  • A Fire Alarm Permit must be obtained before starting fire alarm system work, and a permit is required before scheduling any fire alarm inspection (Ogden EnerGov Application Assistant, Fire Alarm application)
  • Filed as a distinct application from Fire Suppression (sprinkler) permits in Ogden's EnerGov Self-Service portal (separate application IDs under the same 'Fire' category), though both ultimately fall under the Fire Prevention Division's authority and the Municipal Code Section 9-2-8 private fire protection system framework documented on this file's fire-sprinkler-alarm-permit entry
  • Fire alarm plans and installation must comply with the adopted State Fire Code, including NFPA standards, per Ogden Municipal Code Section 16-2-2 (Codes Adopted)

Required documents

  • RequiredFire Alarm Permit Application (EnerGov Self-Service)Apply online via the Ogden EnerGov Self-Service portal, Fire category -- 'Fire Alarm' application, distinct from the 'Fire Suppression' application in the same category.

Fee schedule

Fee typeAmountNotes
Building Permit / Technical Code Base Fee Schedule (valuation-based; no distinct fire alarm permit fee line item exists)Same shared valuation-based fee table documented under the Commercial Building Permit and Commercial Tenant Improvement Permit entries in this record (Ogden City Code Section 4-6-1.A.9)Full-text review of Ogden's official Consolidated Fee Schedule (Ogden City Code Section 4-6-1, Title 4 Chapter 6 -- the same page linked from Building Inspections' own 'Fees' page) on 2026-07-22 found no separate fire-alarm-specific fee line item; fire alarm permits are billed under the same Technical Code Base Fee Schedule used for every other building permit type in this record.
Private Fire Protection System Inspection Fee (applies once field inspections begin)Not more than $15.00 per inspectionOgden Municipal Code Section 9-2-8, as amended by Ordinance 2024-15 (adopted June 18, 2024) -- the same third-party inspection fee cap documented in full on this file's fire-sprinkler-alarm-permit entry. The Ogden City Council Staff Review for that ordinance confirms the fee governs 'private fire protection systems' broadly, i.e. commercial fire alarms, sprinklers, and kitchen hood suppression systems alike, paid directly to the third-party inspection vendor rather than collected by the City.

Change of Use / Change of Occupancy

Verified

Ogden does not publish a standalone Change of Use, Change of Occupancy, or Certificate of Occupancy permit application or fee. Per Ogden Municipal Code Section 15-1-7 (Building Permits And Land Use Permits), fetched and read directly 2026-07-22: 'It is unlawful for any person... to change the use or occupancy of any building or other structure within the City... without first obtaining a building permit from the building official.' Ogden's own Permit Requirements page independently confirms: permits are required when changing the 'use' of a building (turning a house into a business or adding units, or changing a commercial building from an office to a restaurant). A change of use is processed through the standard Building Permit process -- filed as a 'Commercial Remodel,' 'Commercial Tenant Improvement,' or 'Commercial New Build' application in the EnerGov Self-Service portal depending on the physical scope of work -- rather than a distinct application; a full review of the EnerGov portal's category list (2026-07-22) found no separate Change of Use or Change of Occupancy application anywhere in the city's permit catalog.

Verified 2026-07-22 · Source

Requirements

  • A change in the use or occupancy of a building in Ogden requires a building permit, per Ogden Municipal Code Section 15-1-7.A: 'unlawful... to change the use or occupancy of any building or other structure within the City... without first obtaining a building permit'
  • Per Ogden Municipal Code Section 15-1-8 (Certificate Of Occupancy): 'a new certificate shall be required at any time the occupancy of the building changes to a more intensive use'
  • Ogden's Permit Requirements page lists changing the use of a building (e.g., house to business, office to restaurant) as one of the activities requiring a permit
  • If the change of use involves construction or tenant-improvement scope, it is processed as a Commercial Remodel, Commercial Tenant Improvement, or Commercial New Build permit application (see those entries in this record); the EnerGov Self-Service portal's full permit category list contains no separate Change of Use / Change of Occupancy application
  • If the use being changed to or from is a legally nonconforming use, a separate Planning Division review -- Nonconforming Use Certificate ($250.00) or Nonconforming Use Change/Expansion ($500.00 plus site plan fee) -- may also apply, per Ogden City Code Section 4-6-1.A.1

Required documents

  • RequiredBuilding Permit Application (Commercial Remodel / Tenant Improvement / New Build, as applicable)A change of use is processed through the standard Building Permit application matching the scope of work -- see the Commercial Building Permit and Commercial Tenant Improvement Permit entries in this record -- rather than a distinct Change of Use application.
  • RequiredCertificate of OccupancyApplied for coincidentally with the building/land use permit application per Ogden Municipal Code Section 15-1-8; a new certificate is required whenever a building's occupancy changes to a more intensive use.

Fee schedule

Fee typeAmountNotes
No distinct Change of Use / Change of Occupancy fee existsNot applicable as a separate line itemOgden Municipal Code Section 15-1-9 (Fees) states that fees for 'examining and processing plans; issuing building or land use permits or certificates of occupancy' are 'as provided in title 4, chapter 6 of this Code' -- the same Consolidated Fee Schedule and valuation-based Technical Code Base Fee Schedule documented under the Commercial Building Permit and Commercial Tenant Improvement Permit entries in this record. Full-text review of Section 4-6-1 (2026-07-22) found no distinct change-of-use or change-of-occupancy fee line item.
Zoning Certification (Planning Division -- verifies zoning compliance of a proposed use)$75.00Ogden City Code Section 4-6-1.A.1, General Planning Administrative Reviews -- a related Planning Division fee that may apply when verifying a proposed use's zoning compliance, distinct from and in addition to any Building Permit fee.
Nonconforming Use Certificate$250.00Ogden City Code Section 4-6-1.A.1 -- applies only where the use being changed to or from is a legally nonconforming use, not to every change of use.
Nonconforming Use Change/Expansion$500.00 plus site plan feeOgden City Code Section 4-6-1.A.1 -- applies only to a change or expansion of an existing legally nonconforming use.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)View current record →All versions →

Permalink: /utah/weber-county/ogden/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.