Version history — Ogden, Utah
This is PermitBase’s own verified record for Ogden, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Ogden’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-07-22Superseded
- Ogden, Utah — Fire Alarm System Permit record added
- Ogden, Utah — Change of Use / Change of Occupancy record added
- 2026-07-20Superseded
- Ogden, Utah — Fire Protection System (Sprinkler & Alarm) Permit record added
- Ogden, Utah — Sign Permit record added
- Ogden, Utah — EV Charger / EVSE Permit record added
- Ogden, Utah — Fire Protection System (Sprinkler & Alarm) Permit fee record updated: Not more than 5 per inspection → Not more than $15.00 per inspection
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-06-30Superseded
- Ogden, Utah — fee schedule re-verified across 12 permit types
- Ogden, Utah — permit-type records re-verified (29 updates)
- 2026-06-27Initial record — coverage of Ogden began