You are viewing the permanent link for the record currently in effect, published 2026-07-16.
Roy building permits
VerifiedRoy, Utah — as published 2026-07-16.
Verified 2026-07-03 · Source
Codes adopted
Permit types & fees
Residential Building Permit (One & Two Family Dwellings)
VerifiedRequired for new one- and two-family residential dwelling construction in Roy City, regulated by the state-mandated 2024 IBC and 2021 IRC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged). Fees are calculated from ICC Building Valuation Data applied to the 1997 UBC Table 1-A fee structure.
Verified 2026-07-03 · Source
Requirements
- New one- or two-family residential dwelling construction
- All permits must be applied for and processed online via the CityInspect / My City Inspector portal
- Any work regulated by the state-mandated 2024 IBC and 2021 IRC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
Required documents
- RequiredPermit ApplicationFilled out with proper contact numbers, contractor licensing numbers, and use-of-building information; submitted online via My City Inspector account.
- RequiredSite Plan / Plot Plan8.5" x 11" or larger, showing distance from building to property lines, all existing structures, address/street, and north arrow, per Roy City's One & Two Family Dwellings Permit Information handout.
- RequiredFooting and Foundation PlanRequired per Roy City permit information handout.
- RequiredFloor Plan (each floor)Doors, windows, openings, electrical outlets/lights/smoke detectors, meter main and interior circuit panel location, appliances, dimensions, attic access, stairways, egress components.
- RequiredElevationsFront, side, and rear views.
- RequiredWall Cross Sections and DetailsRequired per Roy City permit information handout.
- RequiredPlumbing, Electrical, and Mechanical LayoutsRequired per Roy City permit information handout.
- RequiredSpecies and Grade of LumberSize of joists and beams.
- RequiredInsulation R-Value DocumentationClearly show R-value for all exterior walls, ceilings, and floor area over unconditioned/outside air.
- RequiredEnergy Compliance DocumentationREScheck or other approved method, plus Manual J & D calculations for the HVAC system.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Derived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data | Roy City Corporation Master Consolidated Fee Schedule (adopted by Ordinance No. 25-13): 'Building Valuation is derived by utilizing the current building valuation data from the International Code Council published on the ICC website (www.iccsafe.org). Building Permit fee is derived by utilizing the fee set in table 1-A of the 1997 Uniform Building Code.' No further breakdown table is published in the fee schedule document itself. |
| Residential Plan Check Fee (Single Family) | 25% of Building Fee | Roy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Single Family — 25% of Building Fee.' |
| Residential Inspection Fee | $25.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'Residential Inspection Fee — $25.00.' |
| Re-inspect Fee | $50.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'Re-inspect Fee — $50.00.' |
| State Fee | 1% of Building Fee or state-mandated amount | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'State Fee — 1% of Building Fee or State Mandated Amount.' |
| After-hours Inspection Fee | $100.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
| Re-Plan Check Fee | $50.00 unless otherwise stated by the Building Official | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
Residential Addition / Remodel Permit
VerifiedRequired for additions and remodels to existing one- and two-family dwellings in Roy City, regulated by the state-mandated 2021 IRC and 2024 IBC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged).
Verified 2026-07-03 · Source
Requirements
- Additions to existing residential structures
- Remodels involving removal/addition of walls
- All permits applied for online via CityInspect / My City Inspector
Required documents
- RequiredPermit ApplicationFilled out with proper contact numbers, contractor licensing numbers, and use-of-building information.
- RequiredSite Plan / Plot Plan8.5" x 11" or larger, per Roy City's Residential Additions & Remodels Permit Information handout.
- RequiredFooting and Foundation PlanRequired per handout.
- RequiredFloor Plan (each floor)Required per handout.
- RequiredElevationsFront, side, and rear views.
- RequiredWall Cross Sections and DetailsRequired per handout.
- RequiredPlumbing, Electrical, and Mechanical LayoutsRequired per handout.
- RequiredRemodel Area MarkupIf remodeling, show all areas that will be remodeled, walls being removed, and new walls being built.
- RequiredInsulation R-Value DocumentationShow R-value for ceiling, exterior walls, and floor assembly over unconditioned air space.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Derived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Building Permit Fees section — same valuation methodology applies to additions/remodels as new construction; no separate addition-specific line item is published. |
| Residential Plan Check Fee (Residential Additions) | 25% of Building Fee | Roy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Residential Additions — 25% of Building Fee.' |
| Residential Plan Check Fee (Accessory Building, Garages, Remodels) | $50.00 flat | Roy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Accessory Building, Garages, Remodels — $50.00.' |
| Basement Finish Fee | 50% of single-family residential square-footage rate + Plan Review + State Fee | Roy City Master Consolidated Fee Schedule, Other Permits/OTC section: 'Basement Finish — 50% of single family residential sq ftg rate + Plan Review + State Fee.' |
Electrical / Plumbing / Mechanical Permit
VerifiedRequired for standalone electrical, plumbing, or mechanical work in Roy City not part of a larger valuation-based building permit. Roy City bundles these three trades under a single flat fee line in its Master Consolidated Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; a direct text search of Roy City's full Master Consolidated Fee Schedule PDF found no EV-, EVSE-, or electric-vehicle-specific line item — the standard $50.00 + State Fee combined trade-permit fee applies.
Verified 2026-07-03 · Source
Requirements
- New electrical circuits/wiring, plumbing fixture work, or mechanical (HVAC) installation not covered under a separate building permit
- All permits applied for online via CityInspect / My City Inspector
Required documents
- RequiredPermit ApplicationSubmitted online via My City Inspector account.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical, Plumbing, and Electrical Permit | $50.00 + State Fee ($25 permit + $25 inspection fee) | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Mechanical, Plumbing, and Electrical Permits — $50.00 + State Fee ($25+$25 inspection fee).' Confirmed against the source PDF's table layout via direct page-image review (page 4 of the consolidated fee schedule PDF). |
Residential Reroof Permit
VerifiedRequired for residential roof replacement in Roy City. Roy publishes a distinct flat fee for residential reroofing separate from its general valuation-based building permit.
Verified 2026-07-03 · Source
Requirements
- Residential roof tear-off and replacement
- All permits applied for online via CityInspect / My City Inspector
Required documents
- RequiredPermit ApplicationSubmitted online via My City Inspector account.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Reroof Fee | $85.00 + State Fee ($35 permit + $50 inspection fee) | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Residential Reroof — $85.00 + State Fee ($35+$50 inspection fee).' Confirmed via direct page-image review of the source PDF (page 4). |
Solar PV Permit
VerifiedRequired for residential rooftop solar photovoltaic installations in Roy City. The city publishes dedicated plan-submittal checklists for both micro-inverter and string-inverter systems, and a specific fee line in its Master Consolidated Fee Schedule.
Verified 2026-07-03 · Source
Requirements
- Rooftop PV system installation (string inverter or micro-inverter)
- Site plan showing home, electrical meter panel, backfed sub-panelboards, and all PV components
- Engineer's analysis confirming existing roof rafters can safely support the new system loads
- All permits applied for online via CityInspect / My City Inspector
Required documents
- RequiredResidential Solar Photovoltaic (PV) System Plan Submittal ChecklistRoy City's official checklist for string-inverter (and separately, micro-inverter) systems, covering site plan, mounting system/roof-load engineering, and other required specs.
- RequiredSite PlanDetailed site plan showing home location, electrical meter panel, any backfed sub-panelboards, and all PV system components on the property.
- RequiredMounting System DetailsModule mounting system, weight of all roof components, support-spacing specs based on local wind and snow loads, roof rafter type (engineered truss or dimensional), and roof covering type/layer count.
- RequiredRoof Load Engineering AnalysisEngineer's analysis showing the existing roof rafters can safely handle the new system loads, per Roy City's Solar Plan Submittal Checklist.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Permit Fee | $412.50 + State Fee ($250 permit + $162.50 inspection fee) | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Solar — $412.50 + State Fee ($250 + $162.50 inspection fee).' Confirmed via direct page-image review of the source PDF (page 4). |
| Residential Plan Check Fee (Solar) | 65% of Building Fee | Roy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Solar — 65% of Building Fee.' |
Residential Deck Permit
VerifiedRequired for attached residential decks in Roy City that are 30 inches or more above grade and serve a primary or other exit. Decks under 200 sq ft, under 30 inches above grade, unattached, and not serving egress are exempt.
Verified 2026-07-03 · Source
Requirements
- Deck attached to the home
- 30 inches or more above adjacent grade
- Serves either the primary exit door or another exit
Required documents
- RequiredPermit ApplicationSubmitted online via My City Inspector account.
- RequiredDeck PlanPer Roy City's Residential Deck Permit Information handout (revised May 2024) — framing plan and dimensions form.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Plan Check Fee (Deck, via 50% of Utility/Misc rate) | 50% of Utility/Misc square-footage rate + Plan Review + State Fee | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Deck — 50% of Utility/Misc sq ftg rate + Plan Review + State Fee.' |
Commercial Building Permit
VerifiedRequired for new commercial (primary structure) construction in Roy City, regulated by the state-mandated 2024 IBC (Utah Code § 15A-2-103, effective 7/1/2026). The Building Permit Fee uses the same Table 1-A (1997 Uniform Building Code) valuation formula as residential permits; Roy's Master Consolidated Fee Schedule publishes a dedicated 'Commercial Plan Check Fees' table charging 65% of the Building Fee for the primary structure.
Verified 2026-07-19 · Source
Requirements
- New commercial construction (primary structure)
- All permits must be applied for and processed online via the CityInspect / My City Inspector portal
- Any work regulated by the state-mandated 2024 IBC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
- Contractor license number (Utah DOPL) for all licensed-trade work
Required documents
- RequiredPermit ApplicationSubmitted online via My City Inspector account, with contact numbers, contractor licensing numbers, and use-of-building information.
- RequiredSite Plan / Plot PlanShowing distance from building to property lines, all existing structures, address/street, and north arrow, per the same format required for residential permits (Roy City does not publish a separate commercial-specific plan-submittal checklist as of 2026-07-19; the general document list on Roy's Building Permits & Inspections page applies to 'residential and commercial construction' alike).
- RequiredFooting and Foundation PlanRequired per Roy City's general building-permit plan-submittal requirements.
- RequiredStructural, Plumbing, Electrical, and Mechanical PlansStamped by a licensed Utah engineer/architect as required for the occupancy type and construction scope.
- RequiredEnergy Compliance DocumentationCompliance with the state-adopted IECC (2024 edition, effective 7/1/2026).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Derived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data | Roy City Corporation Master Consolidated Fee Schedule (Ordinance No. 25-13), Community Development / Building Permit Fees: 'Building Valuation is derived by utilizing the current building valuation data from the International Code Council... Building Permit fee is derived by utilizing the fee set in table 1-A of the 1997 Uniform Building Code.' Same formula used for both residential and commercial permits; no separate commercial dollar table is published. |
| Commercial Plan Check Fee — Primary Structure | 65% of Building Fee | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), 'Commercial Plan Check Fees' table: 'Primary Structure — 65% of Building Fee.' Confirmed via direct page-image review of the source PDF (fetched 2026-07-19). |
| State Fee | 1% of Building Fee or state-mandated amount | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'State Fee — 1% of Building Fee or State Mandated Amount.' |
| Re-inspect Fee | $50.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
| After-hours Inspection Fee | $100.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
| Re-Plan Check Fee | $50.00 unless otherwise stated by the Building Official | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for tenant improvement, remodel, or interior finish work in existing commercial space in Roy City. Roy's Master Consolidated Fee Schedule bills TI/remodel work under the same 65% Commercial Plan Check Fee rate as new commercial construction — the 'Commercial Plan Check Fees' table lists 'TI's, Remodels, Accessory Buildings' at an identical 65% of Building Fee.
Verified 2026-07-19 · Source
Requirements
- Commercial tenant improvement, remodel, or interior finish scope in an existing commercial building
- All permits applied for online via CityInspect / My City Inspector
- Contractor license number (Utah DOPL) for licensed-trade work
Required documents
- RequiredPermit ApplicationSubmitted online via My City Inspector account.
- RequiredRemodel / Tenant Improvement PlansFloor plan showing scope of work, wall sections, and MEP layouts as applicable to the scope. Roy City does not publish a dedicated TI-specific plan-submittal checklist as of 2026-07-19; the general commercial/residential plan-set requirements apply.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Derived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13) — same formula applies to TI/remodel valuation as new construction. |
| Commercial Plan Check Fee — TI's, Remodels, Accessory Buildings | 65% of Building Fee | Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), 'Commercial Plan Check Fees' table: 'TI's, Remodels, Accessory Buildings — 65% of Building Fee.' Identical rate to new commercial primary-structure construction. Confirmed via direct page-image review of the source PDF (fetched 2026-07-19). |
| State Fee | 1% of Building Fee or state-mandated amount | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
| Re-inspect Fee | $50.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
| After-hours Inspection Fee | $100.00 | Roy City Master Consolidated Fee Schedule, Other Fees/Fines section. |
Sign Permit
VerifiedRequired for signs in Roy City, listed as its own line item ('Signs') under Other Permits/OTC in Roy City's Master Consolidated Fee Schedule, separate from Mechanical/Plumbing/Electrical, Reroof, Solar, Basement Finish, and Deck permits. Roy City Municipal Code Title 13 (Sign Regulations) governs sign types, dimensions, and placement. Roy's own code host (roy.municipalcodeonline.com) is a JavaScript application whose Title 13 chapter text does not render through a standard fetch, Wayback, or the r.jina.ai reader proxy — but a Roy City Community Development Department staff report to the Planning Commission (dated September 26, 2023, discussing Title 13 amendments) directly quotes several Title 13 sections verbatim, which are cited below in place of the full chapter text.
Verified 2026-07-20 · Source
Requirements
- A sign permit is a listed, distinct line item in Roy City's Other Permits/OTC fee table — separate from other trade and building permits
- Per RMC § 13-4-3(B), signs that require a permit are regulated by type, including Monument, Pole, Electronic Message Center (EMC), Projecting, Projecting Marquee, and Awning signs; per § 13-4-3(B)(1)(a)(2), no Monument Sign may be located so as to impede the clear view of vehicular or pedestrian traffic on any site, path, or roadway — quoted from the Community Development Department's September 26, 2023 Planning Commission staff report on Title 13 amendments. Specific height/setback dimensional standards for each sign type were not found independently quoted in a fetched source and are not stated here.
- Per RMC § 13-4-1, certain sign types are exempt from permit requirements but must still conform to all other Title 13 requirements, including Incidental Signs (per § 13-2-1, signs or posters for a specific event such as a garage sale, concert, or swap meet) and, subject to detailed timing/placement rules, Political and Campaign Signs
- Per RMC § 13-4-1(N)(3), a campaign sign may not be posted more than 60 days before the election it pertains to (45 days before a primary) and may not remain more than 15 days after that election
- Per RMC § 13-3-2(A)(18), Off-Premise Signs (signs directing attention to a use, product, or service not related to the property on which they are located) are prohibited in all districts
- Per RMC § 13-3-1(E)-(F), no sign may be fastened, painted, or placed on private property without the owner's/lessee's consent, and no sign, handbill, poster, or notice may be fastened, painted, or placed on any public property, pole, hydrant, bridge, tree, sidewalk, or street
Required documents
- RequiredSign Permit ApplicationSubmit to Roy City Building Permits & Inspections / Planning & Zoning. Contact (801) 774-1000 for the current application form.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee | $30.00 + $50.00 Plan Review + State Fee | Roy City Consolidated Fee Schedule (Ordinance 26-7, confirmed live at royutah.gov 2026-07-20, and the prior Ordinance 25-13 schedule hosted at cms7files1.revize.com — both show identical figures), Other Permits/OTC table: 'Signs — $30.00 + $50.00 Plan Review + State Fee.' Confirmed by direct page-image render of both PDFs to resolve column alignment (re-confirmed independently 2026-07-20 by re-rendering the live Ordinance 26-7 PDF, page 4, to a 200dpi PNG: the 'Other Permits/OTC' table row reads exactly 'Signs — $30.00 + $50.00 Plan Review + State Fee'). |
Fire Alarm System Permit
VerifiedRoy City Fire Department (Fire Marshal's office) reviews and permits new fire alarm system installations as a distinct line item in the city's Consolidated Fee Schedule, separate from the general building permit and from fire sprinkler system permits. Fees cover one plan review and one inspection; re-reviews and additional inspections are billed at the same rate as the initial fee.
Verified 2026-07-20 · Source
Requirements
- Fire Alarm Installation Plan Review must be submitted to and approved by Roy City Fire Department before permit issuance — per the Consolidated Fee Schedule (Ordinance 26-7), Fire Alarm Systems table
- Fire Alarm System Permit fee includes one inspection; additional inspections are billed at the initial review fee rate
Required documents
- RequiredFire Alarm Installation Plan Review submittalPlans for the proposed fire alarm system submitted to Roy City Fire Department for review prior to permit issuance.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Alarm Installation Plan Review | $100.00 | Includes 1 plan review. Fire Alarm Installation Re-review is billed at the same rate ('Same as initial review fee'). Per Roy City Consolidated Fee Schedule (Ordinance 26-7), Fire Alarm Systems table, confirmed live at royutah.gov 2026-07-20 via direct page-image render to resolve column alignment (re-confirmed independently 2026-07-20 by re-rendering the live PDF, page 8, to a 200dpi PNG: the 'Fire Alarm Systems' table reads exactly 'Fire Alarm Installation Plan Review — $100.00'). |
| Fire Alarm System Permit | $100.00 | Includes 1 inspection. Fire Alarm System Plan Additional Inspections are billed at the same rate ('Same as initial review fee'). Same source as above. |
Fire Sprinkler System Permit
VerifiedRoy City Fire Department (Fire Marshal's office) reviews and permits new fire sprinkler system installations as a distinct, square-footage-tiered line item in the city's Consolidated Fee Schedule, separate from the general building permit and from fire alarm system permits. Plan review fees and permit fees both scale by system size; permits for 0-3,000 sq ft include 2 inspections (flow, hydro, final) and permits for 3,001+ sq ft include 3 inspections.
Verified 2026-07-20 · Source
Requirements
- Fire Sprinkler System Plan Review must be submitted to and approved by Roy City Fire Department before permit issuance — per the Consolidated Fee Schedule (Ordinance 26-7), Fire Sprinkler Systems table
- Permit fee tier is based on the sprinklered area in square feet: 0-3,000 sq ft, 3,001-10,000 sq ft, or 10,001+ sq ft
- 0-3,000 sq ft permits include 2 inspections; 3,001+ sq ft permits include 3 inspections (flow, hydro, final); additional inspections beyond those included are billed separately
Required documents
- RequiredFire Sprinkler System Plan Review submittalPlans for the proposed fire sprinkler system, sized by square footage, submitted to Roy City Fire Department for review prior to permit issuance.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fire Sprinkler System Plan Review — 0-3,000 sq ft | $250.00 | Includes 1 plan review. Roy City Consolidated Fee Schedule (Ordinance 26-7), Fire Sprinkler Systems table, confirmed live at royutah.gov 2026-07-20 via direct page-image render to resolve column alignment (re-confirmed independently 2026-07-20 by re-rendering the live PDF, page 8, to a 200dpi PNG: the 'Fire Sprinkler Systems' table reads exactly 'Fire Sprinkler System Plan Review — 0-3,000 sq ft. — $250.00,' '3,001-10,000 sq ft. — $350.00,' '10,001+ sq ft. — $400.00,' and 'Fire Sprinkler System Permit — 0-3,000 sq ft. — $200.00,' '3,001-10,000 sq ft. — $300.00,' '10,001+ sq ft. — $350.00,' with 'Fire Sprinkler System Additional Inspections — $100.00 each additional'). |
| Fire Sprinkler System Plan Review — 3,001-10,000 sq ft | $350.00 | Includes 1 plan review. Same source as above. |
| Fire Sprinkler System Plan Review — 10,001+ sq ft | $400.00 | Includes 1 plan review. Plan Re-review is billed at the same rate ('Same as initial review fee'). Same source as above. |
| Fire Sprinkler System Permit — 0-3,000 sq ft | $200.00 | Includes 2 inspections (flow, hydro, final). Same source as above. |
| Fire Sprinkler System Permit — 3,001-10,000 sq ft | $300.00 | Includes 3 inspections (flow, hydro, final). Same source as above. |
| Fire Sprinkler System Permit — 10,001+ sq ft | $350.00 | Includes 3 inspections (flow, hydro, final). Additional inspections beyond those included are $100.00 each. Same source as above. |
EV Charger / EVSE Permit
VerifiedRoy City's Consolidated Fee Schedule (Ordinance No. 26-7) has no distinct "EV Charger" or "EVSE" line item. Under "Other Permits/OTC," it lists a single combined "Mechanical, Plumbing, and Electrical Permits" fee of $50.00 plus State Fee ($25 permit fee + $25 inspection fee), which is the fee category EV charger/EVSE installation falls under as electrical work.
Verified 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Roy City
- Work performed per Roy City's adopted electrical code
Required documents
- RequiredMechanical, Plumbing, and Electrical Permit ApplicationSubmitted to Roy City Building Permits & Inspections for standalone trade work.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical, Plumbing, and Electrical Permit | $50.00 + State Fee ($25 permit fee + $25 inspection fee) | Roy City Consolidated Fee Schedule (Ordinance No. 26-7), "Other Permits/OTC" section: "Mechanical, Plumbing, and Electrical Permits — $50.00 + State Fee ($25+$25 inspection fee)." No distinct EV Charger or EVSE fee category exists anywhere in the schedule (confirmed via full-text search of the document). |
Change of Use / Change of Occupancy Review
VerifiedRoy City has no standalone 'Change of Use Permit' or 'Certificate of Occupancy' application or fee line item — a full 20-page direct review of the current Consolidated Fee Schedule (Ordinance No. 26-7, fetched/reviewed 2026-07-22) found no 'change of use' or 'certificate of occupancy' fee anywhere in the document. Instead, two governing mechanisms apply. First, Roy City's Building Permits & Inspections page states the general (IBC 105.1-derived) building-permit trigger: 'Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure... shall first make application to the building official and obtain the required permit' — meaning a change of occupancy is processed as a Building Permit under the same Table 1-A (1997 UBC)/ICC-valuation fee and, for commercial space, the same 65% Commercial Plan Check Fee already documented under this file's Commercial Building Permit and Commercial Tenant Improvement entries. Second, where the change involves a legally nonconforming use, Roy City Zoning Ordinance § 10-23-5(7) requires that 'a nonconforming use may only be changed to a use allowed in the Table of Uses for the Zoning District in which the property is located by following the approval procedures for such new use, as required by this Ordinance' — meaning if the new use is listed as a Conditional Use for that zoning district, the Conditional Use Permit process and fee apply. Any new occupant business must also separately obtain a Roy City Business License.
Verified 2026-07-22 · Source
Requirements
- A building permit application to the Building Official is required whenever an owner or authorized agent intends to 'change the occupancy of a building or structure,' per Roy City's Building Permits & Inspections page (IBC 105.1-derived permit-trigger language); this is processed under the general/Commercial Building Permit, not a distinct change-of-use permit
- Per Roy City Zoning Ordinance § 10-23-5(7), if the existing use is a legal nonconforming use, it may only be changed to a use allowed in the Table of Uses for that zoning district, by following the approval procedures required for the new use (e.g., Conditional Use Permit approval if the new use is conditional rather than permitted outright)
- Per § 10-23-1 and § 10-23-2, the Zoning Administrator is the designated Land Use Authority responsible for determining the existence of any legal nonconforming use or noncomplying structure — relevant where nonconformity status must be established before a change-of-use review
- Any new or changed business occupying the space must separately obtain a Roy City Business License through the Community Development Department, per Roy City's 'How to Open a Business in Roy' guidance ('all Roy City businesses need a license with the City')
Required documents
- RequiredBuilding Permit Application (General/Commercial)Submitted for the underlying change-of-occupancy work; same application used for Roy City's general and Commercial Building Permits, per the Building Permits & Inspections page's permit-trigger language covering 'change the occupancy of a building or structure.'
- RequiredBusiness License ApplicationRequired for any new or changed business occupant, submitted to the Community Development Department, per Roy City's 'How to Open a Business in Roy' page.
- OptionalZoning Administrator Determination of Legal Nonconforming Use/Noncomplying Structure applicationPer RMC § 10-23-3, required only when the property's nonconforming/noncomplying status must be formally determined by the Zoning Administrator before a change of use.
- OptionalConditional Use Permit Application with Site Plan ReviewRequired only if the new use is listed as a Conditional Use (rather than a Permitted Use) in the Table of Uses for the property's zoning district, per RMC § 10-23-5(7).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | Derived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data | Roy City Consolidated Fee Schedule (Ordinance No. 26-7), Community Development / Building Permit Fees section: 'Building Valuation is derived by utilizing the current building valuation data from the International Code Council published on the ICC website (www.iccsafe.org). Building Permit fee is derived by utilizing the fee set in table 1-A of the 1997 Uniform Building Code.' No standalone change-of-use/certificate-of-occupancy fee exists; a change-of-occupancy building permit is billed under this same general formula. Confirmed via full 20-page direct document review, 2026-07-22. |
| Commercial Plan Check Fee — TI's, Remodels, Accessory Buildings (applies to commercial change-of-occupancy work) | 65% of Building Fee | Roy City Consolidated Fee Schedule (Ordinance No. 26-7), Commercial Plan Check Fees table: 'TI's, Remodels, Accessory Buildings — 65% of Building Fee.' Same table and rate documented under this file's Commercial Tenant Improvement / Tenant Finish Permit entry. Confirmed via full document review, 2026-07-22. |
| General Business License | $75.00 (Transfer Fee $30.00 if same business name/location) | Roy City Consolidated Fee Schedule (Ordinance No. 26-7), Business Licensing Fees section: 'General Business License — $75.00' and 'Transfer Fee (if same name/loc) — $30.00.' Applies to any new or changed business occupant per Roy City's business-licensing requirement. Confirmed via full document review, 2026-07-22. |
| Conditional Use (applies only if the new use is a Conditional Use for the zoning district) | $200.00; $400.00 with Site Plan | Roy City Consolidated Fee Schedule (Ordinance No. 26-7), Planning Application Fees table: 'Conditional Use — $200.00; $400.00 with Site Plan.' Applies per RMC § 10-23-5(7)'s requirement that a nonconforming use may only be changed to a use allowed in the Table of Uses by following the new use's approval procedures. Confirmed via full document review, 2026-07-22. |
| State Fee | 1% of Building Fee or state-mandated amount | Roy City Consolidated Fee Schedule (Ordinance No. 26-7), Other Fees/Fines section: 'State Fee — 1% of Building Fee or State Mandated Amount.' |
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.