Skip to main content
PermitBase

This is PermitBase’s published record for Roy as of 2026-07-19. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Roy building permits

Verified

Roy, Utah — as published 2026-07-19.

Verified 2026-07-03 · Source

Codes adopted

GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Roy City's Building Permits & Inspections page still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the earlier fetch: 'Roy City has adopted minimum design and construction requirements found in the state amended 2021 IBC, IPC, IMC, IFGC and IRC, as well as the 2020 NEC.' State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale or omitted) text.2024 International Building Code (IBC), state-amended — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Roy City's Building Permits & Inspections page still lists 'the state amended 2021 IBC' (live re-check 2026-07-16).2021 International Residential Code (IRC), state-amended, including Appendix AQ — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Roy City's page, which lists 'the state amended ... IRC' as 2021 (live re-check 2026-07-16).2024 International Plumbing Code (IPC), state-amended — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Roy City's page still lists 'the state amended 2021 ... IPC' (live re-check 2026-07-16).2024 International Mechanical Code (IMC), state-amended — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Roy City's page still lists 'the state amended 2021 ... IMC' (live re-check 2026-07-16).2024 International Fuel Gas Code (IFGC), state-amended — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Roy City's page still lists 'the state amended 2021 ... IFGC' (live re-check 2026-07-16).2023 National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip. Roy City's page still lists 'the 2020 NEC' (live re-check 2026-07-16) — this is a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip (the 2023 NEC has been state law since before this project's original review), of the same kind documented for American Fork's Solar Checklist and Provo's Building FAQ. Reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Not mentioned anywhere on Roy City's Building Permits & Inspections page, its permit-information handouts, or its Consolidated Fee Schedule as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Not mentioned on any Roy City source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on any Roy City source reviewed as of live re-check 2026-07-16, despite the city offering a Residential Swimming Pools permit info page; added as a statute-sourced omission.Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on any Roy City source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.No International Fire Code (IFC) entry: § 15A-2-103 does not adopt the IFC — it is separately governed under Title 15A Chapter 5, outside the scope of this section. Roy City's page does not list an IFC edition either, so there is no mis-citation to correct here.Roy City Design Criteria (site-specific structural values published alongside the adopted-codes statement on the same Building Permits & Inspections page): Ground Snow Load 40 psf; Wind Speed 120 mph, Exposure B or C; Seismic Design Category D0; Frost Depth 30 inches below grade.

Permit types & fees

Residential Building Permit (One & Two Family Dwellings)

Verified

Required for new one- and two-family residential dwelling construction in Roy City, regulated by the state-mandated 2024 IBC and 2021 IRC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged). Fees are calculated from ICC Building Valuation Data applied to the 1997 UBC Table 1-A fee structure.

Verified 2026-07-03 · Source

Requirements

  • New one- or two-family residential dwelling construction
  • All permits must be applied for and processed online via the CityInspect / My City Inspector portal
  • Any work regulated by the state-mandated 2024 IBC and 2021 IRC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)

Required documents

  • RequiredPermit ApplicationFilled out with proper contact numbers, contractor licensing numbers, and use-of-building information; submitted online via My City Inspector account.
  • RequiredSite Plan / Plot Plan8.5" x 11" or larger, showing distance from building to property lines, all existing structures, address/street, and north arrow, per Roy City's One & Two Family Dwellings Permit Information handout.
  • RequiredFooting and Foundation PlanRequired per Roy City permit information handout.
  • RequiredFloor Plan (each floor)Doors, windows, openings, electrical outlets/lights/smoke detectors, meter main and interior circuit panel location, appliances, dimensions, attic access, stairways, egress components.
  • RequiredElevationsFront, side, and rear views.
  • RequiredWall Cross Sections and DetailsRequired per Roy City permit information handout.
  • RequiredPlumbing, Electrical, and Mechanical LayoutsRequired per Roy City permit information handout.
  • RequiredSpecies and Grade of LumberSize of joists and beams.
  • RequiredInsulation R-Value DocumentationClearly show R-value for all exterior walls, ceilings, and floor area over unconditioned/outside air.
  • RequiredEnergy Compliance DocumentationREScheck or other approved method, plus Manual J & D calculations for the HVAC system.

Fee schedule

Fee typeAmountNotes
Building Permit FeeDerived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data
Roy City Corporation Master Consolidated Fee Schedule (adopted by Ordinance No. Show full citation

Roy City Corporation Master Consolidated Fee Schedule (adopted by Ordinance No. 25-13): 'Building Valuation is derived by utilizing the current building valuation data from the International Code Council published on the ICC website (www.iccsafe.org). Building Permit fee is derived by utilizing the fee set in table 1-A of the 1997 Uniform Building Code.' No further breakdown table is published in the fee schedule document itself.

Residential Plan Check Fee (Single Family)25% of Building FeeRoy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Single Family — 25% of Building Fee.'
Residential Inspection Fee$25.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'Residential Inspection Fee — $25.00.'
Re-inspect Fee$50.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'Re-inspect Fee — $50.00.'
State Fee1% of Building Fee or state-mandated amountRoy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'State Fee — 1% of Building Fee or State Mandated Amount.'
After-hours Inspection Fee$100.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section.
Re-Plan Check Fee$50.00 unless otherwise stated by the Building OfficialRoy City Master Consolidated Fee Schedule, Other Fees/Fines section.

Residential Addition / Remodel Permit

Verified

Required for additions and remodels to existing one- and two-family dwellings in Roy City, regulated by the state-mandated 2021 IRC and 2024 IBC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC; IRC unchanged).

Verified 2026-07-03 · Source

Requirements

  • Additions to existing residential structures
  • Remodels involving removal/addition of walls
  • All permits applied for online via CityInspect / My City Inspector

Required documents

  • RequiredPermit ApplicationFilled out with proper contact numbers, contractor licensing numbers, and use-of-building information.
  • RequiredSite Plan / Plot Plan8.5" x 11" or larger, per Roy City's Residential Additions & Remodels Permit Information handout.
  • RequiredFooting and Foundation PlanRequired per handout.
  • RequiredFloor Plan (each floor)Required per handout.
  • RequiredElevationsFront, side, and rear views.
  • RequiredWall Cross Sections and DetailsRequired per handout.
  • RequiredPlumbing, Electrical, and Mechanical LayoutsRequired per handout.
  • RequiredRemodel Area MarkupIf remodeling, show all areas that will be remodeled, walls being removed, and new walls being built.
  • RequiredInsulation R-Value DocumentationShow R-value for ceiling, exterior walls, and floor assembly over unconditioned air space.

Fee schedule

Fee typeAmountNotes
Building Permit FeeDerived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation DataRoy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Building Permit Fees section — same valuation methodology applies to additions/remodels as new construction; no separate addition-specific line item is published.
Residential Plan Check Fee (Residential Additions)25% of Building FeeRoy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Residential Additions — 25% of Building Fee.'
Residential Plan Check Fee (Accessory Building, Garages, Remodels)$50.00 flatRoy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Accessory Building, Garages, Remodels — $50.00.'
Basement Finish Fee50% of single-family residential square-footage rate + Plan Review + State FeeRoy City Master Consolidated Fee Schedule, Other Permits/OTC section: 'Basement Finish — 50% of single family residential sq ftg rate + Plan Review + State Fee.'

Electrical / Plumbing / Mechanical Permit

Verified

Required for standalone electrical, plumbing, or mechanical work in Roy City not part of a larger valuation-based building permit. Roy City bundles these three trades under a single flat fee line in its Master Consolidated Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; a direct text search of Roy City's full Master Consolidated Fee Schedule PDF found no EV-, EVSE-, or electric-vehicle-specific line item — the standard $50.00 + State Fee combined trade-permit fee applies.

Verified 2026-07-03 · Source

Requirements

  • New electrical circuits/wiring, plumbing fixture work, or mechanical (HVAC) installation not covered under a separate building permit
  • All permits applied for online via CityInspect / My City Inspector

Required documents

  • RequiredPermit ApplicationSubmitted online via My City Inspector account.

Fee schedule

Fee typeAmountNotes
Mechanical, Plumbing, and Electrical Permit$50.00 + State Fee ($25 permit + $25 inspection fee)
Roy City Master Consolidated Fee Schedule (Ordinance No. Show full citation

Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Mechanical, Plumbing, and Electrical Permits — $50.00 + State Fee ($25+$25 inspection fee).' Confirmed against the source PDF's table layout via direct page-image review (page 4 of the consolidated fee schedule PDF).

Residential Reroof Permit

Verified

Required for residential roof replacement in Roy City. Roy publishes a distinct flat fee for residential reroofing separate from its general valuation-based building permit.

Verified 2026-07-03 · Source

Requirements

  • Residential roof tear-off and replacement
  • All permits applied for online via CityInspect / My City Inspector

Required documents

  • RequiredPermit ApplicationSubmitted online via My City Inspector account.

Fee schedule

Fee typeAmountNotes
Residential Reroof Fee$85.00 + State Fee ($35 permit + $50 inspection fee)Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Residential Reroof — $85.00 + State Fee ($35+$50 inspection fee).' Confirmed via direct page-image review of the source PDF (page 4).

Solar PV Permit

Verified

Required for residential rooftop solar photovoltaic installations in Roy City. The city publishes dedicated plan-submittal checklists for both micro-inverter and string-inverter systems, and a specific fee line in its Master Consolidated Fee Schedule.

Verified 2026-07-03 · Source

Requirements

  • Rooftop PV system installation (string inverter or micro-inverter)
  • Site plan showing home, electrical meter panel, backfed sub-panelboards, and all PV components
  • Engineer's analysis confirming existing roof rafters can safely support the new system loads
  • All permits applied for online via CityInspect / My City Inspector

Required documents

  • RequiredResidential Solar Photovoltaic (PV) System Plan Submittal ChecklistRoy City's official checklist for string-inverter (and separately, micro-inverter) systems, covering site plan, mounting system/roof-load engineering, and other required specs.
  • RequiredSite PlanDetailed site plan showing home location, electrical meter panel, any backfed sub-panelboards, and all PV system components on the property.
  • RequiredMounting System DetailsModule mounting system, weight of all roof components, support-spacing specs based on local wind and snow loads, roof rafter type (engineered truss or dimensional), and roof covering type/layer count.
  • RequiredRoof Load Engineering AnalysisEngineer's analysis showing the existing roof rafters can safely handle the new system loads, per Roy City's Solar Plan Submittal Checklist.

Fee schedule

Fee typeAmountNotes
Solar Permit Fee$412.50 + State Fee ($250 permit + $162.50 inspection fee)Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Solar — $412.50 + State Fee ($250 + $162.50 inspection fee).' Confirmed via direct page-image review of the source PDF (page 4).
Residential Plan Check Fee (Solar)65% of Building FeeRoy City Master Consolidated Fee Schedule, Residential Plan Check Fees section: 'Solar — 65% of Building Fee.'

Residential Deck Permit

Verified

Required for attached residential decks in Roy City that are 30 inches or more above grade and serve a primary or other exit. Decks under 200 sq ft, under 30 inches above grade, unattached, and not serving egress are exempt.

Verified 2026-07-03 · Source

Requirements

  • Deck attached to the home
  • 30 inches or more above adjacent grade
  • Serves either the primary exit door or another exit

Required documents

  • RequiredPermit ApplicationSubmitted online via My City Inspector account.
  • RequiredDeck PlanPer Roy City's Residential Deck Permit Information handout (revised May 2024) — framing plan and dimensions form.

Fee schedule

Fee typeAmountNotes
Residential Plan Check Fee (Deck, via 50% of Utility/Misc rate)50% of Utility/Misc square-footage rate + Plan Review + State FeeRoy City Master Consolidated Fee Schedule (Ordinance No. 25-13), Other Permits/OTC section: 'Deck — 50% of Utility/Misc sq ftg rate + Plan Review + State Fee.'

Commercial Building Permit

Verified

Required for new commercial (primary structure) construction in Roy City, regulated by the state-mandated 2024 IBC (Utah Code § 15A-2-103, effective 7/1/2026). The Building Permit Fee uses the same Table 1-A (1997 Uniform Building Code) valuation formula as residential permits; Roy's Master Consolidated Fee Schedule publishes a dedicated 'Commercial Plan Check Fees' table charging 65% of the Building Fee for the primary structure.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction (primary structure)
  • All permits must be applied for and processed online via the CityInspect / My City Inspector portal
  • Any work regulated by the state-mandated 2024 IBC (Roy City's own page still lists the 2021 IBC as of live re-check 2026-07-16 — see codesAdopted)
  • Contractor license number (Utah DOPL) for all licensed-trade work

Required documents

  • RequiredPermit ApplicationSubmitted online via My City Inspector account, with contact numbers, contractor licensing numbers, and use-of-building information.
  • RequiredSite Plan / Plot PlanShowing distance from building to property lines, all existing structures, address/street, and north arrow, per the same format required for residential permits (Roy City does not publish a separate commercial-specific plan-submittal checklist as of 2026-07-19; the general document list on Roy's Building Permits & Inspections page applies to 'residential and commercial construction' alike).
  • RequiredFooting and Foundation PlanRequired per Roy City's general building-permit plan-submittal requirements.
  • RequiredStructural, Plumbing, Electrical, and Mechanical PlansStamped by a licensed Utah engineer/architect as required for the occupancy type and construction scope.
  • RequiredEnergy Compliance DocumentationCompliance with the state-adopted IECC (2024 edition, effective 7/1/2026).

Fee schedule

Fee typeAmountNotes
Building Permit FeeDerived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation Data
Roy City Corporation Master Consolidated Fee Schedule (Ordinance No. Show full citation

Roy City Corporation Master Consolidated Fee Schedule (Ordinance No. 25-13), Community Development / Building Permit Fees: 'Building Valuation is derived by utilizing the current building valuation data from the International Code Council... Building Permit fee is derived by utilizing the fee set in table 1-A of the 1997 Uniform Building Code.' Same formula used for both residential and commercial permits; no separate commercial dollar table is published.

Commercial Plan Check Fee — Primary Structure65% of Building FeeRoy City Master Consolidated Fee Schedule (Ordinance No. 25-13), 'Commercial Plan Check Fees' table: 'Primary Structure — 65% of Building Fee.' Confirmed via direct page-image review of the source PDF (fetched 2026-07-19).
State Fee1% of Building Fee or state-mandated amountRoy City Master Consolidated Fee Schedule, Other Fees/Fines section: 'State Fee — 1% of Building Fee or State Mandated Amount.'
Re-inspect Fee$50.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section.
After-hours Inspection Fee$100.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section.
Re-Plan Check Fee$50.00 unless otherwise stated by the Building OfficialRoy City Master Consolidated Fee Schedule, Other Fees/Fines section.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement, remodel, or interior finish work in existing commercial space in Roy City. Roy's Master Consolidated Fee Schedule bills TI/remodel work under the same 65% Commercial Plan Check Fee rate as new commercial construction — the 'Commercial Plan Check Fees' table lists 'TI's, Remodels, Accessory Buildings' at an identical 65% of Building Fee.

Verified 2026-07-19 · Source

Requirements

  • Commercial tenant improvement, remodel, or interior finish scope in an existing commercial building
  • All permits applied for online via CityInspect / My City Inspector
  • Contractor license number (Utah DOPL) for licensed-trade work

Required documents

  • RequiredPermit ApplicationSubmitted online via My City Inspector account.
  • RequiredRemodel / Tenant Improvement PlansFloor plan showing scope of work, wall sections, and MEP layouts as applicable to the scope. Roy City does not publish a dedicated TI-specific plan-submittal checklist as of 2026-07-19; the general commercial/residential plan-set requirements apply.

Fee schedule

Fee typeAmountNotes
Building Permit FeeDerived from Table 1-A of the 1997 Uniform Building Code, applied to current ICC Building Valuation DataRoy City Master Consolidated Fee Schedule (Ordinance No. 25-13) — same formula applies to TI/remodel valuation as new construction.
Commercial Plan Check Fee — TI's, Remodels, Accessory Buildings65% of Building Fee
Roy City Master Consolidated Fee Schedule (Ordinance No. Show full citation

Roy City Master Consolidated Fee Schedule (Ordinance No. 25-13), 'Commercial Plan Check Fees' table: 'TI's, Remodels, Accessory Buildings — 65% of Building Fee.' Identical rate to new commercial primary-structure construction. Confirmed via direct page-image review of the source PDF (fetched 2026-07-19).

State Fee1% of Building Fee or state-mandated amountRoy City Master Consolidated Fee Schedule, Other Fees/Fines section.
Re-inspect Fee$50.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section.
After-hours Inspection Fee$100.00Roy City Master Consolidated Fee Schedule, Other Fees/Fines section.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Roy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-16)Later version (2026-07-20) →View current record →All versions →

Permalink: /utah/weber-county/roy/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 76b6295

Reproducible from PermitBase’s version-controlled dataset, commit 76b6295.