South Ogden building permits

Verified

South Ogden, Utah — as published 2026-07-16.

Verified 2026-07-07 · Source

Codes adopted

GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). South Ogden's official Building & Inspections FAQ page ('What code editions are being enforced?') still displays the pre-7/1/2026 edition list; re-checked live 2026-07-16, page text is byte-identical to the earlier fetch: 'The city is currently enforcing the following codes: 2021 Edition of the International Building Code, 2021 Edition of the International Residential Code, 2021 Edition of the International Plumbing Code, 2021 Edition of the International Mechanical Code, 2021 Edition of the National Electrical Code, 2021 Edition of the International Fuel Gas Code, 2021 Edition of the International Fire Code, 2009 Edition of the International Building Code (ICC/ANSI A117.1) for Accessibility Standards.' State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale or omitted) text.2024 Edition of the International Building Code (IBC) — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. South Ogden's FAQ still lists '2021 Edition of the International Building Code' (live re-check 2026-07-16).2021 Edition of the International Residential Code (IRC), plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches South Ogden's FAQ, which lists '2021 Edition of the International Residential Code' (live re-check 2026-07-16).2024 Edition of the International Plumbing Code (IPC) — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. South Ogden's FAQ still lists '2021 Edition of the International Plumbing Code' (live re-check 2026-07-16).2024 Edition of the International Mechanical Code (IMC) — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. South Ogden's FAQ still lists '2021 Edition of the International Mechanical Code' (live re-check 2026-07-16).2023 Edition of the National Electrical Code (NEC) — per Utah Code § 15A-2-103(1)(g); this edition did NOT change in the 7/1/2026 flip and has been state law since before this project's original 2026-07-07 review. South Ogden's FAQ still lists '2021 Edition of the National Electrical Code' (live re-check 2026-07-16) — this is a PRE-EXISTING discrepancy that predates and is unrelated to the 2026-07-01 code-cycle flip (South Ogden's page was already citing a stale NEC edition under the prior law too); reported here as-published rather than corrected, per grounded-data policy of not inventing a fact the city's own source does not state.2024 Edition of the International Fuel Gas Code (IFGC) — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. South Ogden's FAQ still lists '2021 Edition of the International Fuel Gas Code' (live re-check 2026-07-16).2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split) — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Not mentioned on South Ogden's FAQ, department page, Forms page, or City Fee Schedule as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Not mentioned on any South Ogden source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on any South Ogden source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on any South Ogden source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.2021 Edition of the International Fire Code (IFC) — per the official FAQ page (live re-check 2026-07-16, unchanged); South Ogden City Code Title 3, Chapter 1 separately adopts by reference 'the International Fire Code version adopted by the State of Utah Fire Marshal's Office for the respective year' (Ordinance 24-05, effective 2 Jul 2024), so the specific IFC edition in force tracks the State Fire Marshal's current adoption. NOTE: Utah Code § 15A-2-103 does NOT adopt the IFC — it is separately governed under Title 15A Chapter 5, outside the scope of this section; South Ogden's IFC citation and Fire Code ordinance are therefore unaffected by, and not mis-scoped to, § 15A-2-103.2009 Edition of the International Building Code (ICC/ANSI A117.1) for Accessibility Standards — per the official FAQ page (live re-check 2026-07-16, unchanged). This accessibility standard is not among the codes enumerated in Utah Code § 15A-2-103(1); reproduced here as South Ogden's own published statement, not itself corrected against that section.Utah's statewide construction-code framework under Utah Code Title 15A (State Construction and Fire Codes Act) governs code adoption and amendment authority for all Utah municipalities, including South Ogden; § 15A-2-103 is now the direct authority used above for the codes it enumerates, since South Ogden's own FAQ page has not been updated to reflect the 7/1/2026 edition changes.

Permit types & fees

Residential Building Permit (New Construction / Additions / Alterations)

Verified

Required for new single-family residential construction, additions, and structural alterations in South Ogden. The Building Permit Fee is valuation-based per the city's own published fee table (distinct from Highland/Murray/Vineyard, which peg to the ICC schedule directly) — South Ogden publishes its own valuation brackets in the official City Fee Schedule. Rooftop or ground-mounted solar PV installation also falls under this general Building Permit — South Ogden does not publish a distinct solar-specific permit type, fee line, or application checklist anywhere on its Building & Inspections FAQ, Forms page, or the official City Fee Schedule (last amended 16 Jun 2026, checked directly by PDF text extraction 2026-07-19, no 'solar' or 'photovoltaic' mention found).

Verified 2026-07-20 · Source

Requirements

  • New single-family residential construction, additions, or structural alterations
  • Plans must be stamped: architectural plans by an architect or engineer; commercial structural sheets and structural calculations must be stamped by an engineer; plumbing/mechanical/electrical plans may require a stamp depending on complexity, per the official FAQ
  • Work must comply with the state-mandated 2024 IBC/IPC/IMC/IFGC, 2021 IRC, 2023 NEC, and 2021 IFC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC/IPC/IMC/IFGC; IRC/NEC unchanged; South Ogden's own FAQ still lists 2021 editions for IBC/IPC/IMC/IFGC and 2021 NEC as of live re-check 2026-07-16 — see codesAdopted), plus the city's published design factors (Seismic Zone D2, Roof Snow Load 30 psf, Wind Speed 115 mph 3-sec gust, Frost Depth 30", Ground Snow Load 43 psf, Allowable Soil Bearing 1,500 psi)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via the city's iWorq portal (Online Building Permit Submittal) or in person at 3950 S Adams Ave.
  • OptionalOwner/Builder CertificateRequired if a homeowner (rather than a licensed Utah contractor) is performing work on their own primary residence.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$0–$1,300: $47.00 flat. $1,301–$2,000: $47.00 for the first $1,300 plus $3.05 for each additional $100 or fraction thereof. $2,001–$25,000: $68.35 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof. $25,001–$50,000: $390.35 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof. $50,001–$100,000: $642.85 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof. $100,001–$500,000: $992.85 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof. $500,001–$1,000,000: $3,232.85 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof. $1,000,001+: $5,607.85 for the first $1,000,000 plus $3.65 for each additional $1,000,000 or fraction thereof.South Ogden City Fee Schedule (last amended 16 Jun 2026, Building Department Fees § Building Permit Fees); this valuation table itself was last updated 18 Sep 2018 per Ordinance 18-12.
Residential Plan Review Fee45% of the building permit fee costSouth Ogden City Fee Schedule, § Building Inspection Fees.
Commercial Plan Check and Site Plan Review65% of the building permit fee costSouth Ogden City Fee Schedule, § Building Inspection Fees. Included for reference; this is a commercial (non-residential) fee.
Re-inspection Fee (assessed under Section 108.8)$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.
Inspections Outside Normal Business Hours$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees. Weekend inspections require Chief Building Official authorization per the official FAQ, and this overtime fee applies in addition to the base permit fee.
Additional Plan Reviews Required by Changes to Plans$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.
Inspections for Which No Fee Is Specifically Established$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.
Use of Outside Consultants for Plan Checking and InspectionsActual costs plus 5% administrative feeSouth Ogden City Fee Schedule, § Building Inspection Fees.

Accessory Building / Shed Permit

Verified

Required for sheds and other accessory buildings exceeding 200 square feet in South Ogden; sheds of 200 sq ft or less do not require a permit but must still follow the city's published setback and height guidelines, per the official FAQ. Permitted sheds are billed under the same valuation-based Building Permit Fee table as other construction.

Verified 2026-07-07 · Source

Requirements

  • Required for any shed/accessory building over 200 sq ft
  • Sheds 200 sq ft or less: no permit required, but must still meet the ACCESSORY BUILDING (SHED) GUIDELINES setback/height rules
  • No accessory buildings allowed in the front yard
  • Rear yard: minimum 6' from the main building (eave to eave), 1' from the property line, and 10' from any building on an adjacent lot
  • Side yard: minimum 6' from the main building and 10' from adjacent buildings (eave to eave), plus zone-specific side setbacks of 8'–10'
  • Maximum height 19' (finished floor to roof midpoint); walls may not exceed 10'
  • Sheds located over a utility easement require written permission from the utility company/easement holder or are subject to removal
  • Non-compliant sheds (of any size) may be required to be removed

Required documents

  • RequiredBuilding Permit ApplicationRequired for sheds/accessory buildings over 200 sq ft; submitted via the city's Online Building Permit Submittal (iWorq) portal.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same table as residential building permit)$0–$1,300: $47.00 flat, scaling per the same valuation brackets published in the official City Fee ScheduleSouth Ogden City Fee Schedule (last amended 16 Jun 2026), § Building Permit Fees. The FAQ does not publish a separate flat fee specifically for sheds/accessory buildings; the standard valuation-based Building Permit Fee table applies.

Demolition Permit

Verified

Required before demolishing any structure in South Ogden. The permit process requires clearance from the Weber County Health Department confirming no friable asbestos (or licensed abatement), confirmation utility lines were safely terminated, removal of the structure from the State tax rolls, and proper disposal of hazardous-material-containing appliances/electrical devices, per the official FAQ. A separate Utility Demolition Fee applies depending on whether utility service is retained or permanently terminated.

Verified 2026-07-07 · Source

Requirements

  • Clearance from the Weber County Health Department confirming no friable asbestos, or that friable asbestos was removed by a licensed asbestos-abatement contractor
  • Confirmation that all utility lines to the building have been terminated at a safe location by the utility companies
  • Removal of the demolished building from the State tax rolls
  • Proper disposal of appliances/electrical devices that might contain hazardous materials

Required documents

  • RequiredDemolition Permit ApplicationSecured from the Building & Inspections office at 3950 S Adams Ave. prior to demolition, per the official FAQ.
  • RequiredWeber County Health Department ClearanceRequired confirmation of no friable asbestos or licensed abatement, per the official FAQ.

Fee schedule

Fee typeAmountNotes
Demolition Permit – Utilities Service to Be Maintained$100.00South Ogden City Fee Schedule (last amended 16 Jun 2026), § Miscellaneous Utility Fees / Utility Demolition Fees.
Demolition Permit – Utilities Service Permanently Terminated$500.00South Ogden City Fee Schedule (last amended 16 Jun 2026), § Miscellaneous Utility Fees / Utility Demolition Fees.

Accessory Dwelling Unit (ADU) Permit & Rental License

Verified

Required for construction of internal, attached, or detached Accessory Dwelling Units under South Ogden City Code § 10-14-23, as amended by Ordinance 23-21 (effective 5 Dec 2023). A building permit is required for the construction/conversion, and a separate Rental Dwelling Business License is required if the owner receives any monetary compensation for the ADU.

Verified 2026-07-07 · Source

Requirements

  • Permitted only in owner-occupied single-family dwellings; either the ADU or the principal residence must be occupied by the property owner
  • No more than one ADU per lot
  • Detached ADUs barred on lots under 10,000 sq ft; no minimum lot size for internal/attached ADUs
  • Detached ADUs capped at 1,200 sq ft; no maximum size for internal/attached ADUs
  • Detached ADU height: minimum 10 ft, maximum 19 ft (up to 24 ft for a pitched roof or 20 ft for a flat roof, with side/rear setbacks increased 1 ft per additional foot of height above 17 ft)
  • Must include a kitchen and sanitation facilities (at least a 3/4 bathroom) separate from the main dwelling
  • At least one additional off-street parking space beyond that required for the primary residence; not located in a front-yard setback
  • Single utility meter per service, in the property owner's name
  • May never be used as a short-term rental (rented under 30 days)
  • A Rental Dwelling Business License is required if the owner receives any monetary compensation for the ADU, and cannot be granted without evidence of a Certificate of Occupancy
  • Inspections required for compliance with building, fire, and health/safety codes before approval, per UCA § 10-9a-511.5

Required documents

  • RequiredBuilding Permit ApplicationRequired for the ADU construction/conversion itself, per South Ogden City Code § 10-14-23(12)-(13).
  • OptionalRental Dwelling Business License ApplicationRequired only if the owner receives any monetary compensation for the ADU; requires evidence of a Certificate of Occupancy.

Fee schedule

Fee typeAmountNotes
Residential Rental License for Interior Accessory Dwelling Unit (ADU)$10.00South Ogden City Fee Schedule (last amended 16 Jun 2026), § Business License Fees, last amended by Ordinance 23-13 (6 Jun 2023: 'ADU License'). This is the rental-license fee, applicable only when the ADU is rented for compensation.
Building Permit Fee (valuation-based, same table as residential building permit)$0–$1,300: $47.00 flat, scaling per the same valuation brackets published in the official City Fee ScheduleSouth Ogden City Fee Schedule, § Building Permit Fees. No ADU-specific valuation table is published separately; the standard Building Permit Fee table applies to the construction/conversion itself.

Land Use Permit (Fence)

A no-cost, optional permit for fence construction in South Ogden. Unlike a building permit, it is not legally required to build a fence, but the city strongly recommends obtaining one for future protection if a dispute over the fence ever arises, per the official FAQ.

Reviewed 2026-07-07 · Source

Requirements

  • Not required by the city to build a fence
  • Strongly recommended as protection against future disputes concerning the fence

Required documents

  • OptionalLand Use Permit ApplicationCovers fences, sheds, flatwork, and similar minor site improvements; available through the Building & Inspections Department Forms page.

Fee schedule

Fee typeAmountNotes

Commercial Building Permit

Verified

Required for new commercial construction in South Ogden. Uses the same valuation-based Building Permit Fee table as residential permits, plus a dedicated Commercial Plan Check and Site Plan Review fee of 65% of the building permit fee cost, per the official City Fee Schedule.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction
  • Commercial structural sheets and structural calculations must be stamped by an engineer, per the official FAQ ('Do plans need to be stamped?')
  • Work must comply with the state-mandated 2024 IBC/IPC/IMC/IFGC and 2023 NEC (Utah Code § 15A-2-103, effective 7/1/2026 for IBC/IPC/IMC/IFGC; South Ogden's own FAQ still lists 2021 editions and 2021 NEC as of live re-check 2026-07-16 — see codesAdopted)
  • Commercial alarm and/or chemical suppression system plan review required if triggered by the Uniform Fire Code (UFC), per the City Fee Schedule Fire Department Fees section

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via the city's iWorq portal (Online Building Permit Submittal) or in person at 3950 S Adams Ave.
  • RequiredStamped Architectural and Structural PlansCommercial structural sheets and structural calculations must be stamped by a licensed engineer, per the official FAQ.
  • RequiredEnergy Code Compliance DocumentationCompliance with the state-adopted IECC.
  • OptionalFire Alarm / Suppression System PlansRequired only if triggered by the Uniform Fire Code (UFC); reviewed separately by the Fire Department per its own plan-review and pre-occupancy trip test fees.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Same valuation-bracket table published for residential permits (see Residential Building Permit entry), starting at $47.00 for $0-$1,300 and scaling to $5,607.85 + $3.65 per additional $1,000,000 for values over $1,000,000South Ogden City Fee Schedule (last amended 16 Jun 2026), § Building Permit Fees. No separate commercial-only valuation table is published; the same bracket table applies to both residential and commercial permits.
Commercial Plan Check and Site Plan Review65% of the building permit fee costSouth Ogden City Fee Schedule (last amended 16 Jun 2026), § Building Inspection Fees: 'Commercial plan check and site plan review — 65% of bldg. permit fee cost.' Confirmed via direct page-image review of the source PDF (fetched 2026-07-19).
Commercial Alarm System Plan Review and Pre-Occupancy Trip Test$100.00 (if required by UFC)South Ogden City Fee Schedule, § Fire Department Fees.
Commercial Chemical Suppression System Pre-Occupancy Trip Test$50.00 (if required by UFC)South Ogden City Fee Schedule, § Fire Department Fees.
Re-inspection Fee (assessed under Section 108.8)$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.
Inspections Outside Normal Business Hours$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees. Weekend inspections require Chief Building Official authorization per the official FAQ.
Additional Plan Reviews Required by Changes to Plans$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.
Use of Outside Consultants for Plan Checking and InspectionsActual costs plus 5% administrative feeSouth Ogden City Fee Schedule, § Building Inspection Fees.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement, remodel, or interior finish work in existing commercial space in South Ogden. South Ogden's City Fee Schedule does not publish a separate TI-specific fee line — TI/remodel work is billed under the same valuation-based Building Permit Fee table and the same 65% Commercial Plan Check and Site Plan Review fee as new commercial construction.

Verified 2026-07-19 · Source

Requirements

  • Commercial tenant improvement, remodel, or interior finish scope in an existing commercial building
  • Commercial structural sheets and structural calculations must be stamped by an engineer where structural work is involved, per the official FAQ
  • Work must comply with the state-mandated 2024 IBC/IPC/IMC/IFGC and 2023 NEC (see codesAdopted)

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via the city's iWorq portal (Online Building Permit Submittal) or in person at 3950 S Adams Ave.
  • RequiredTenant Improvement / Remodel PlansFloor plan showing scope of work; stamped structural plans where structural modifications are involved. South Ogden does not publish a distinct TI-specific document checklist as of 2026-07-19 — the same general commercial plan-submittal requirements apply.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)Same valuation-bracket table published for residential and new commercial permitsSouth Ogden City Fee Schedule (last amended 16 Jun 2026), § Building Permit Fees. No separate TI-specific valuation table is published.
Commercial Plan Check and Site Plan Review65% of the building permit fee costSouth Ogden City Fee Schedule, § Building Inspection Fees. The same rate applies to TI/remodel work as to new commercial construction — no distinct TI line item is published.
Re-inspection Fee (assessed under Section 108.8)$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.

Sign Permit

Verified

Required for signs in South Ogden City. Per the city's own Building & Inspections FAQ, 'Are permits required for signs? Yes.' Signs are regulated under City Code Title 10, Chapter 5.1 (most recently amended by Ordinance 22-16, which added a non-commercial expressive sign category and revised existing-sign standards). South Ogden does not publish a distinct dollar sign-permit fee — its Consolidated Fee Schedule (last amended 16 Jun 2026) contains only the general valuation-based Building Permit Fee table, with no sign-specific line item, so signs requiring a building permit are priced off that same table.

Verified 2026-07-20 · Source

Requirements

  • A permit is required for signs — per South Ogden's official Building & Inspections FAQ: 'Are permits required for signs? Yes.'
  • Signs must comply with City Code Title 10, Chapter 5.1 (Sign regulations), as amended by Ordinance 22-16 (20 Sept 2022)
  • Temporary signs (banners, inflatables, etc.) require a Temporary Sign Permit application specifying business name, sign type/size, location on the property, and display start/removal dates
  • Signs may not be located in public rights-of-way — the applicant is responsible for ensuring the sign is located entirely on their own property
  • Signs shall be securely fastened and maintained in a clean, safe, and attractive condition
  • Certain sign types are exempt from permit requirements or subject to specific size caps under Ordinance 22-16, including: residential real estate signs (max 6 sq ft) and commercial for-sale/lease signs (max 36 sq ft); signs up to 12 sq ft on private property under specified conditions; up to 36 sq ft signs announcing construction/remodeling; non-commercial expressive signs up to 6' high x 12' wide x 36 sq ft

Required documents

  • RequiredTemporary Sign Permit ApplicationSouth Ogden City form: business name, address, contact person/phone, type and size of sign, location on property, display begin/removal dates, and a drawing or photo of the sign.
  • RequiredBuilding Permit Application (Permanent Signs)Signs are listed among the categories requiring a building permit on South Ogden's Building & Inspections page, alongside items such as demolitions and temporary buildings.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based — applies to signs; no distinct sign line item published)$47.00 minimum ($0-$1,300 valuation), scaling up per the city's standard valuation table (e.g., $68.35 for the first $2,000 plus $14.00 per additional $1,000 up to $25,000, etc.)South Ogden City Consolidated Fee Schedule (last amended 16 Jun 2026), Building Department Fees > Building Permit Fees: the valuation table is 'Last updated 18 Sept 18 — Ord. 18-12.' No sign-specific fee line item was found anywhere in this schedule — only a 'Sign Contractor' business-license category (unrelated to the permit fee) appears. Contact the Building & Inspections Department at (801) 622-2913 to confirm how a specific sign's valuation is assessed.

EV Charger / EVSE Permit

Verified

South Ogden's Consolidated Fee Schedule (last amended 16 Jun 2026) has no distinct EV-charger/EVSE line item, and the city does not publish a separate Electrical Permit fee at all — all Building Department work, including EV charger/EVSE installation (a dedicated circuit and/or panel work), is billed under the single valuation-based Building Permit Fee table in the Building Department Fees section. This was confirmed by a full read of the Building Department Fees pages (Building Permit Fees and Building Inspection Fees) of the official fee schedule, which lists no separate electrical or EV-specific fee category.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger
  • Subject to the same valuation-based Building Permit Fee table as other building/electrical work

Required documents

  • RequiredBuilding Permit ApplicationSubmitted through the South Ogden online permit portal (southogden.portal.iworq.net/portalhome/southogden).
  • OptionalElectrical Plan / Circuit DiagramDocumentation of the new EVSE circuit and any panel or service changes, for plan review.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$0–$1,300: $47.00 flat, rising per the same valuation table used for all Building Department permits (e.g. $2,001–$25,000: $68.35 for the first $2,000 plus $14.00 per additional $1,000 or fraction thereof).South Ogden City Fee Schedule (last amended 16 Jun 2026), Building Department Fees § Building Permit Fees. No separate Electrical Permit or EV Charger fee category exists in this schedule; EV/EVSE work is billed under this general valuation-based table like any other building permit.
Residential Plan Review Fee45% of the building permit fee costSouth Ogden City Fee Schedule, § Building Inspection Fees.
Re-inspection Fee$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.

Solar / Solar PV Installation Permit

Verified

South Ogden does not publish a distinct solar or photovoltaic permit type, application form, or fee line item. Rooftop or ground-mounted solar PV installation is billed under the same valuation-based Building Permit Fee table used for all other Building Department work. Confirmed by direct fetch of the official Building & Inspections FAQ page and Forms page (both checked live 2026-07-21, no 'solar' or 'photovoltaic' mention or form found), and by a full read of the official City Fee Schedule (last amended 16 Jun 2026) — the complete table of contents and the entire Building Department Fees section (Building Permit Fees, Building Inspection Fees) list no solar-specific category.

Verified 2026-07-21 · Source

Requirements

  • Installation of a rooftop or ground-mounted solar PV system at a residential or commercial property
  • Subject to the same valuation-based Building Permit Fee table as other building/electrical work
  • Work must comply with the state-mandated construction codes in force (see codesAdopted), including the applicable electrical code for PV interconnection
  • Structural and electrical plans/details may require a stamp depending on complexity, per the official FAQ's general plan-stamping guidance

Required documents

  • RequiredBuilding Permit ApplicationSubmitted online via the city's iWorq portal (Online Building Permit Submittal) or in person at 3950 S Adams Ave. South Ogden does not publish a distinct solar-specific application or checklist — the general Building Permit Application covers solar PV installation.
  • OptionalSolar PV Plan Set / Electrical DiagramPanel layout, structural attachment details, and electrical interconnection diagram for plan review. Not a distinct city-published form; submitted as supporting documentation with the general Building Permit Application.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based — applies to solar PV; no distinct solar line item published)$0–$1,300: $47.00 flat. $1,301–$2,000: $47.00 for the first $1,300 plus $3.05 for each additional $100 or fraction thereof. $2,001–$25,000: $68.35 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof. $25,001–$50,000: $390.35 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof. $50,001–$100,000: $642.85 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof. $100,001–$500,000: $992.85 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof. $500,001–$1,000,000: $3,232.85 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof. $1,000,001+: $5,607.85 for the first $1,000,000 plus $3.65 for each additional $1,000,000 or fraction thereof.South Ogden City Fee Schedule (last amended 16 Jun 2026), Building Department Fees § Building Permit Fees; this valuation table itself was last updated 18 Sep 2018 per Ordinance 18-12. No separate solar/photovoltaic fee category exists in this schedule; solar PV work is billed under this general valuation-based table like any other building permit.
Residential Plan Review Fee45% of the building permit fee costSouth Ogden City Fee Schedule, § Building Inspection Fees.
Re-inspection Fee (assessed under Section 108.8)$47.00 per hourSouth Ogden City Fee Schedule, § Building Inspection Fees.

Fire Sprinkler System & Fire Alarm System Permit

Verified

South Ogden has its own municipal Fire Department (Station 81 at 3950 S Adams Ave. and Station 82 at 5635 S Wasatch Dr.) — it is not served by a joint fire district — and that department, not the Building & Inspections Department, reviews and inspects fire sprinkler and fire alarm systems installed in commercial buildings when triggered by the Uniform Fire Code (UFC) as adopted locally under South Ogden City Code Title 3, Chapter 1 (Ordinance 24-05, eff. 2 Jul 2024), which adopts by reference the IFC edition currently designated by the Utah State Fire Marshal's Office. The official South Ogden City Fee Schedule (last amended 16 Jun 2026) publishes a dedicated 'Fire Department Fees' table listing a distinct $100 fee for on-site procedural verification of fire sprinkler systems and a separate $100 fee for commercial alarm system plan review and pre-occupancy trip test (if required by UFC) — confirmed by direct page-image review of the source PDF (page 8, fetched 2026-07-22). South Ogden does not publish a standalone Fire Sprinkler Permit or Fire Alarm Permit application form on its Building & Inspections Forms page or its Fire Department page (both checked live 2026-07-22); fire sprinkler and fire alarm plans are instead submitted as part of the underlying Commercial Building Permit or Tenant Improvement Permit application and routed internally to the Fire Department for review, per the Commercial Building Permit entry in this file.

Verified 2026-07-22 · Source

Requirements

  • Triggered when a commercial building's fire sprinkler and/or fire alarm system installation, replacement, or significant alteration is required by the Uniform Fire Code (UFC) as locally adopted (South Ogden City Code Title 3, Chapter 1; Ordinance 24-05)
  • Submitted as part of the underlying Commercial Building Permit or Tenant Improvement Permit application — South Ogden does not publish a separate standalone fire sprinkler/alarm permit application
  • Fire sprinkler systems are subject to an on-site procedural verification by the Fire Department, billed at $100 per the official Fee Schedule
  • Fire alarm systems are subject to a plan review plus a pre-occupancy trip test by the Fire Department, billed at $100 combined (if required by UFC) per the official Fee Schedule
  • A second (re-submitted) fire system plan check, if the original plan is rejected, is billed at $50 per the official Fee Schedule
  • Related but distinct: a commercial chemical (kitchen hood) suppression system pre-occupancy trip test is billed separately at $50 if required by UFC — not part of this permit; see the Commercial Building Permit entry

Required documents

  • RequiredFire Alarm / Suppression System PlansSubmitted as supporting documentation with the Commercial Building Permit or Tenant Improvement Permit Application, not as a distinct standalone form; routed to the South Ogden Fire Department for plan review. Required only if a fire alarm or sprinkler system is triggered by the UFC.
  • RequiredBuilding Permit Application (Commercial or Tenant Improvement)The underlying permit application through which fire sprinkler/alarm plans are submitted; filed via the city's iWorq portal or in person at 3950 S Adams Ave.

Fee schedule

Fee typeAmountNotes
On-Site Procedural Verification of Fire Sprinkler Systems$100.00South Ogden City Fee Schedule (last amended 16 Jun 2026), § Fire Department Fees. Confirmed by direct page-image review of the source PDF, page 8 (fetched 2026-07-22).
Commercial Alarm System Plan Review and Pre-Occupancy Trip Test (if required by UFC)$100.00South Ogden City Fee Schedule (last amended 16 Jun 2026), § Fire Department Fees. Same line item already referenced in the Commercial Building Permit entry's fee list; page-image confirmed 2026-07-22.
Second (Re-Submitted) Building/Fire Plan Check$50.00 if the original plan was rejectedSouth Ogden City Fee Schedule, § Fire Department Fees.

Certificate of Occupancy / Change of Use Permit

South Ogden's own zoning code names this product a 'Certificate of Occupancy,' not a standalone 'change of use permit' — South Ogden City Code § 10-1-7 ('Certificate Of Occupancy Required') provides that no land or building may be used, occupied, or changed in use until a certificate of occupancy is issued by the Chief Building Official confirming compliance with City Code Title 10, and that the certificate is applied for at the same time as the building permit application and issued within ten (10) days after the work is completed in conformity with the code. This is the only officially-sourced review/issuance-timeline figure identified anywhere in South Ogden's building-related code for any permit type in this file. South Ogden's own municipal code platform (southogden.municipalcodeonline.com) is a JavaScript single-page application with no crawlable static text or discoverable API (a known limitation already documented elsewhere in this file), so the exact section text above was read via zoneomics.com, a zoning-code aggregation service that republishes the codified text sourced from South Ogden's code vendor (Sterling Codifiers) — not a content-farm/document-mirror host, but also not the primary .gov-equivalent host itself; flagged 'partial' confidence for that reason. No distinct Certificate-of-Occupancy fee line item was found anywhere in the official City Fee Schedule (last amended 16 Jun 2026) — a full read of the Building Department Fees and Business License Fees sections found no CO-specific charge; a change of use is billed only through whatever underlying process it triggers (a valuation-based Building Permit Fee if construction/alteration is involved, and/or the applicable Commercial Business License Fee if a new business occupies the space).

Reviewed 2026-07-22 · Source

Requirements

  • No building, structure, or land in South Ogden may be used, occupied, or changed in use until a Certificate of Occupancy is issued by the Chief Building Official, per City Code § 10-1-7
  • The Certificate of Occupancy application must be filed at the same time as the Building Permit Application when the change of use involves construction or structural alteration
  • Per City Code § 10-1-7, the certificate is to be issued within ten (10) days after the building or structure (or the applicable portion) is completed in conformity with City Code Title 10
  • A new business occupying commercial space must separately obtain a Commercial Business License (South Ogden City Fee Schedule, § Business License Fees), which requires an annually-updated Public Safety Form for commercial licenses per the official Business License Applications page
  • For rental use specifically, South Ogden City Code § 10-14-23 already requires evidence of a Certificate of Occupancy before a Rental Dwelling Business License can be granted (see the Accessory Dwelling Unit Permit entry in this file for the ADU-specific case)

Required documents

  • OptionalBuilding Permit ApplicationFiled concurrently with the Certificate of Occupancy request whenever the change of use involves construction or structural alteration, per City Code § 10-1-7; submitted via the city's iWorq portal or in person at 3950 S Adams Ave.
  • RequiredCommercial Business License Application (Commercial Packet)Required for a new business occupying commercial space in South Ogden, in addition to any Certificate of Occupancy; South Ogden's Business License Applications page lists it as the 'Commercial Packet.' Allow at least one week for processing, per the official Business Licensing page.
  • RequiredPublic Safety FormRequired annually for commercial business licenses, per the official Business License Applications page. No further detail on its contents was published on the pages reviewed.

Fee schedule

Fee typeAmountNotes
Certificate of Occupancy (issuance)No distinct fee publishedA full read of the South Ogden City Fee Schedule (last amended 16 Jun 2026) — Building Department Fees (Building Permit Fees, Building Inspection Fees) and Business License Fees sections — found no line item specifically for Certificate of Occupancy issuance or 'change of use.' If the change of use involves construction/alteration, the standard valuation-based Building Permit Fee (and, for commercial work, the 65% Commercial Plan Check and Site Plan Review fee) applies instead — see the Commercial Building Permit and Commercial Tenant Improvement Permit entries in this file.
Commercial Business License Fee (if a new business occupies the space)Varies by business category — e.g., $65 for Business, Professional & Contracted Services; $107 for Automotive Service & Repair; $166 for Food/Restaurant; $2,644 for Assisted Living/Transitional RehabSouth Ogden City Fee Schedule (last amended 16 Jun 2026), § Business License Fees, last amended by Ordinance 23-13 (6 Jun 2023). This is an annual business-operating fee, distinct from any construction-related permit fee, and applies regardless of whether the change of use itself triggers a CO.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-07)View current record →All versions →

Permalink: /utah/weber-county/south-ogden/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784