This is PermitBase’s published record for Unincorporated Weber County as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Weber County building permits

Verified

Unincorporated Weber County, Utah — as published 2026-07-01.

Verified 2026-06-30 · Source

Codes adopted

2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective July 1, 2026 (replaces 2021 IBC). Weber County Code § 12-3-1 adopts the specific editions as adopted and amended by the State of Utah per Title 15A.2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); continues in force after July 1, 20262024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective July 1, 2026 (replaces 2021 IPC)2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective July 1, 2026 (replaces 2021 IMC)2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective July 1, 2026 (replaces 2021 IFGC)2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g). NOTE: Weber County's ordinance page has not been updated and still references the 2020 NEC; the in-force statewide edition is the 2023 NEC per Utah Code § 15A-2-103.2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective July 1, 2026 (replaces 2021 IECC). Note: Utah statewide residential energy provisions effectively follow 2015 IECC residential per § 15A-2-104.2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective July 1, 2026 (replaces 2021 IEBC)2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); effective July 1, 2026 (replaces 2021 ISPSC)

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, structural alterations, and other work requiring plan review in Unincorporated Weber County, per Weber County Code Title 12 and the state-adopted International Building Code / International Residential Code.

Verified 2026-06-30 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions or structural alterations to existing structures
  • Conversion of non-habitable space to habitable space
  • Any work for which a building permit is required under the adopted codes

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com. All items must be complete before plans are accepted for review.
  • RequiredConstruction PlansComplete drawings to scale: floor plans, elevations, sections, and structural details. Submitted electronically through the OpenGov portal.
  • RequiredSite PlanProperty survey showing setbacks from property lines and footprint of structure.
  • RequiredEnergy Compliance (REScheck or equivalent)Required on-site for the insulation inspection per the Required Inspections List (Revised 1/7/21).
  • OptionalEngineered Truss PlansSealed truss layouts required for new construction with factory-built trusses.

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1.00–$2,000.00$69.25Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Building Permit — valuation $2,001.00–$25,000.00$69.25 for the first $2,000, plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Building Permit — valuation $25,001.00–$50,000.00$391.75 for the first $25,000, plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Building Permit — valuation $50,001.00–$100,000.00$643.75 for the first $50,000, plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Building Permit — valuation $100,001.00–$500,000.00$993.75 for the first $100,000, plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Building Permit — valuation $500,001.00–$1,000,000.00$3,233.75 for the first $500,000, plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Building Permit — valuation over $1,000,000.00$5,608.75 for the first $1,000,000, plus $3.65 for each additional $1,000 or fraction thereofWeber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Plan Review — Single-Family Dwelling35% of the building permit feeWeber County Code § 12-3-8(2)(a) (Ord. 2020-25, 12/22/2020)
Plan Review — Commercial65% of the building permit feeWeber County Code § 12-3-8(2)(b) (Ord. 2020-25, 12/22/2020)
Plan Review — Over-Counter / Other$25.00 minimum, plus $55.00 per hour for review time in excess of 30 minutesWeber County Code § 12-3-8(2)(c) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the building permit fee (excludes plan review fees)Weber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)
After-Hours Inspection$125.00 per hour (must be requested and approved by County Building Official)Weber County Code § 12-3-8(7) (Ord. 2020-25, 12/22/2020)
Permit Update Fee (permit inactive >180 days without inspection)$100.00 per year or any portion thereof, not to exceed $500.00Weber County Code § 12-3-8(4) (Ord. 2020-25, 12/22/2020)
Work-without-permit penaltyAdditional fee equal to the permit feeWeber County Code § 12-3-8(6) (Ord. 2020-25, 12/22/2020)

Electrical Permit

Verified

Required for electrical work in Unincorporated Weber County including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g).

Verified 2026-06-30 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections (excluding solar installations, which have a separate fee)

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • OptionalElectrical Plan / Single-Line DiagramPanel schedule and circuit layout for service upgrades and new construction
  • OptionalContractor LicenseValid Utah electrical contractor license (DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Electrical Permit (excluding solar installations)$150.00Weber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Unincorporated Weber County including water heaters, fixture additions, and drain or supply line work. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103 (effective July 1, 2026).

Verified 2026-06-30 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage
  • OptionalContractor LicenseValid Utah plumbing contractor license (DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Plumbing Permit$100.00Weber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Unincorporated Weber County. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103 (effective July 1, 2026).

Verified 2026-06-30 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalMechanical PlanRequired for larger projects — equipment location, duct layout, sizing calculations

Fee schedule

Fee typeAmountNotes
Mechanical Permit$100.00Weber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in Unincorporated Weber County. Permit fees are valuation-based per the Weber County building permit fee schedule (Code § 12-3-6).

Verified 2026-06-30 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com; include scope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Roofing PermitValuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020) — same tier table as Residential Building Permit above. Valuation based on total contract value of roofing work.Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020)
Plan Review (if required)35% of the building permit fee (SFD); 65% (commercial)Weber County Code § 12-3-8(2) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Unincorporated Weber County. Note: Weber County Code § 12-3-8(1) explicitly excludes solar installations from the standard $150 electrical permit fee — the applicable fee mechanism for solar is valuation-based per § 12-3-6.

Verified 2026-07-01 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and fire access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming structure can support the panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementRocky Mountain Power approval required before energizing grid-tied systems

Fee schedule

Fee typeAmountNotes
Solar Permit (building/structural component)Valuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020), using Building Valuation Data per § 12-3-7. The flat $150 electrical fee explicitly excludes solar installations per § 12-3-8(1); Title 12 publishes no separate flat solar fee, so the structural/installation permit is assessed on project valuation per the standard building-permit fee schedule.Grounded directly against the live Weber County Code text (weber.municipalcodeonline.com, Title 12, Sec 12-3-1 through 12-3-8, fetched 2026-07-01): § 12-3-1 places all building-permit-requiring work (including electrical/solar interconnection structural work) under the adopted Building Code fee schedule; § 12-3-8(1) excludes solar from the flat $150 electrical fee without publishing a substitute flat figure; § 12-3-6/12-3-7 (valuation-based, ICC Building Valuation Data) is therefore the applicable published fee mechanism. Valuation-based fee is a grounded fee per sweep criteria.
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Deck Permit

Verified

Required for new deck construction or structural modifications to existing decks in Unincorporated Weber County. Permit fees are valuation-based per County Code § 12-3-6.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Deck PermitValuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020) — same tier table as Residential Building Permit above. Valuation based on ICC Building Valuation Data per § 12-3-7.Grounded directly against the live Weber County Code text (weber.municipalcodeonline.com, Title 12, fetched 2026-07-01). § 12-3-1 places all permit-requiring construction/alteration/addition work under the adopted Building Code; Title 12 publishes no separate flat deck fee, so § 12-3-6/12-3-7's valuation-based schedule is the applicable published fee mechanism, assessed on the project's contract valuation.
Plan Review — Single-Family Dwelling35% of the building permit feeWeber County Code § 12-3-8(2)(a) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Unincorporated Weber County. Valuation is calculated at 50% of the ICC Building Valuation Data square-foot cost per Weber County Code § 12-3-7.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per IRC)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations

Fee schedule

Fee typeAmountNotes
Building Permit — Basement FinishValuation-based per Code § 12-3-6 (Ord. 2020-25, 12/22/2020). Finished basements are valued at 50% of the ICC Building Valuation Data square-foot cost per § 12-3-7 — then apply the permit fee tier table.Grounded directly against the live Weber County Code text (weber.municipalcodeonline.com, Title 12, fetched 2026-07-01) — § 12-3-7 confirmed verbatim: "Finished basements will be valued at 50 percent of the square foot construction cost table in the latest edition of the Building Valuation Data published by the International Code Council." Valuation-based fee against this published, cited standard is a grounded fee per sweep criteria.
Plan Review — Single-Family Dwelling35% of the building permit feeWeber County Code § 12-3-8(2)(a) (Ord. 2020-25, 12/22/2020)
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in Unincorporated Weber County. Pulled as a plumbing permit — the flat $100 plumbing fee applies per Weber County Code § 12-3-8(1).

Verified 2026-06-30 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredOnline Building Permit ApplicationSubmit at countyofweberut.portal.opengov.com
  • OptionalContractor LicenseValid Utah plumbing contractor license (DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Water Heater (Plumbing Permit)$100.00Weber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020) — water heater replacement is covered by the flat plumbing permit fee
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Demolition Permit

Verified

Required for partial or complete demolition of structures in Unincorporated Weber County. Permit fees are valuation-based per County Code § 12-3-6.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos or lead paint (pre-1980 construction)

Required documents

  • RequiredOnline Building Permit Application / Demolition ApplicationSubmit at countyofweberut.portal.opengov.com; include scope of demolition, structure details, and disposal plan
  • OptionalAsbestos SurveyFederal NESHAP regulations require an asbestos inspection before demolition of structures that may contain asbestos-containing materials (typically pre-1980 construction)
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition — Weber County Code § 12-3-5 requires utility disconnection

Fee schedule

Fee typeAmountNotes
Demolition PermitValuation-based per Weber County Code § 12-3-6 (Ord. 2020-25, 12/22/2020). Per § 12-3-7, if a valuation is not otherwise specified for the work, the building official determines and assigns the per-square-foot valuation.Grounded directly against the live Weber County Code text (weber.municipalcodeonline.com, Title 12, fetched 2026-07-01). § 12-3-1 explicitly lists "demolition" among the regulated activities under the adopted Building Code fee schedule; Title 12 publishes no separate flat demolition fee. § 12-3-7 confirms that when a valuation is not specified, "the building official will determine and assign the per square foot valuation" — this is the published, cited fee mechanism, i.e., valuation-based per § 12-3-6/12-3-7.
State Surcharge1% of the permit feeWeber County Code § 12-3-8(1) (Ord. 2020-25, 12/22/2020)
Re-inspection Fee$115.00Weber County Code § 12-3-8(3) (Ord. 2020-25, 12/22/2020)

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Weber County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)Later version (2026-07-17) →View current record →All versions →