Unincorporated Weber County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Weber County, Utah.

Last verified 2026-07-16 · Source · Embed this page’s badge · Version history

Building department

Address
2380 Washington Blvd., Suite 270, Ogden, UT 84401
Phone
(801) 399-8770
Email
Office hours
Mon–Fri 8:00 AM – 5:00 PM (excluding legal holidays)

Inspection guide

See how inspections work in Unincorporated Weber County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective July 1, 2026 (replaces 2021 IBC). Weber County Code § 12-3-1 adopts the specific editions as adopted and amended by the State of Utah per Title 15A.
  • 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); continues in force after July 1, 2026
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective July 1, 2026 (replaces 2021 IPC)
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective July 1, 2026 (replaces 2021 IMC)
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective July 1, 2026 (replaces 2021 IFGC)
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g), current version effective 7/1/2026, superseded 1/1/2027, re-read live 2026-07-16 at le.utah.gov. Weber County Code § 12-3-1 (weber.municipalcodeonline.com, re-read live 2026-07-16) adopts codes by reference to Utah Code Title 15A generally and does not itself name a specific NEC edition; no '2020 NEC' reference could be found in the current codified text.
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective July 1, 2026 (replaces 2021 IECC). Note: Utah statewide residential energy provisions effectively follow 2015 IECC residential per § 15A-2-104.
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective July 1, 2026 (replaces 2021 IEBC)
  • 2024 International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); effective July 1, 2026 (replaces 2021 ISPSC)

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
106units

82 buildings · $36.9M valuation

Trailing 12 months
1,382units

12 of 12 months reported · #6 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
558units

369 buildings · $179.3M valuation

Full year 2025
1,490units

889 buildings · $442.5M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities; county file row: 'Weber County' (co2605c.txt, 49/057); place file also carries 'Weber County Unincorporated Area' (place code 99990) as a possible Phase-1 alternative

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • The seed URL https://www.webercountyutah.gov/building/ returns 404. The correct building inspection URL is https://www.webercountyutah.gov/inspection/.
  • All permit applications must be submitted online at countyofweberut.portal.opengov.com (as of March 30, 2026). Existing applications may still be accessed at frontier.co.weber.ut.us.
  • Allow 14 working days for plan review — plans are reviewed in the order received per the official inspection page.
  • All inspections must be scheduled at least 24 hours in advance. Have the permit number, owner/contractor name, site address, inspection type, and contact phone ready when calling (801) 399-8770.
  • A mandatory roof sheathing inspection is required BEFORE the roof is dried in — missing this can require removal of roof coverings.
  • The 1% state surcharge applies to the building permit fee only (not to plan review fees) per § 12-3-8(1).
  • Commencing work without a permit results in a double fee: the permit fee plus an additional equal penalty per § 12-3-8(6).
  • Weber County Code § 12-3-1 adopts the specific code editions published by Utah Code Title 15A — this means the 2023 NEC (not 2020 NEC listed on the County's own page) is the in-force statewide edition.
  • Ogden Valley City (newly incorporated) has its own permitting authority at ogdenvalley.gov/planning — Weber County Building Inspection no longer covers Ogden Valley City parcels.
  • No email address is published by the Weber County Building Inspection Department on any official page. Contact is by phone: (801) 399-8770.
  • TIER-3 AUDIT (2026-07-16): Re-fetched the live codified Weber County Code §§12-3-1 through 12-3-8 (weber.municipalcodeonline.com, JS-rendered, read via browser), the department's inspection.php page, and Utah Code §15A-2-103 (le.utah.gov). Every fee tier ($69.25 base through $5,608.75+$3.65/1000, 35%/65% plan review, 1% surcharge, $115 reinspection, $100/yr permit-update cap $500, $125/hr after-hours, $150 electrical/$100 plumbing/$100 mechanical), the 14-working-day review timeline, the department block, and the 2024/2021-code-edition list matched exactly — still governed by Ord. 2020-25 (12/22/2020), no newer amendment. The corpus drift-detector's 74%-not-found flag is a false alarm caused by the ordinance page being a JS-rendered SPA that plain-text extractors can't read at all. Only correction: the NEC-edition note above.

Comparable nearby cities

Ogden
Both in Weber County16 shared permit types
Compare fees →
Unincorporated Davis County
14 shared permit typesBoth on the 2024 International Plumbing Code (IPC)
Compare fees →
Pleasant View
Both in Weber County11 shared permit types
Compare fees →