Electrical Permit — Unincorporated Weber County, Utah · Requirements sheet
Verified 2026-07-16 · Source: https://www.webercountyutah.gov/inspection/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical Permit in Unincorporated Weber County, Utah
Required for electrical work in Unincorporated Weber County including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the County's Code § 12-3-8 fee schedule (flat $150, excluding solar) does not publish an EV-specific line item.
Verified 2026-07-16 · Source
When you need this permit
- New electrical circuits or wiring installations
- Electrical panel upgrades or replacements
- Service entrance changes
- Adding or relocating outlets, switches, or fixtures
- Generator or solar panel electrical connections (excluding solar installations, which have a separate fee)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Four-Way
Wiring installed before walls closed — completed as part of the Four-Way (Rough) inspection per the Weber County Required Inspections List
- 2
Power to Panel
Electrical service equipment and grounding installed; power clearance not given until four-way inspection passes
- 3
Final
All devices installed, GFCI/AFCI protection verified, panel labeled, building ready for occupancy
See the full Unincorporated Weber County inspection guide — scheduling & re-inspection fees →
Tips
- Weber County charges a flat $150 electrical permit fee (excluding solar installations) per Code § 12-3-8(1) (Ord. 2020-25).
- EV charger / EVSE installations (e.g., a Level 2 home charging circuit) are permitted as standard electrical work under this permit — Weber County has not published a separate EV-charger permit or fee.
- All electrical work must comply with the 2023 National Electrical Code (NEC) — statewide standard under Utah Code § 15A-2-103(1)(g), confirmed live 2026-07-16 as the current statutory edition (effective 7/1/2026, superseded 1/1/2027). The County's own codified Title 12 text does not name a specific NEC edition either way — it adopts by reference to Utah Code Title 15A.
- Utah law allows homeowners to perform electrical work on their own primary residence, but a permit and inspections are still required.
- AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC. GFCI protection is required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Weber County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Weber County
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Weber County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Weber County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →